Andy Lee Jia Voon

Project Coordinator Assistant at Tendrill International Sdn Bhd
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Seria, Belait District, Brunei, BN

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Brunei Darussalam
    • Oil and Gas
    • 1 - 100 Employee
    • Project Coordinator Assistant
      • Jun 2020 - Present

      Roles and Responsibility • Planning and preparation for construction activity - Site visits with supervisors, quality team, planner, HSE team, company project leads BLNG for project work briefing. - Propose site layout for equipment, tools and materials storage. - Plan for all equipment and personnel mobilization. - Assign competent and trained qualified personnel for job execution - Producing a statement of work method which includes manpower loading, method of statement, equipment, tools and materials, quality control and HSE requirement. - Providing input to the Planner and schedulers on schedule constructability review. Must be able to plan associated activities. - Preparation of piping drawings and materials (MTO) to be issue for pre-fabrication works at fabrication workshop. - Producing of Engineering Technical Enquiry for any deviation in the approved procedures or products used. • Daily task during job execution activity - Supervision of construction crews/teams in the execution of work and carry out daily work activity. - Application of safety values in the construction environment e.g. Safety briefings / meetings, "Tool Box Talks", Unsafe Act audits etc. - Participation in incident investigations. - Assistance to field supervisor on follow up permits. - Cooperation with operations and planners to ensure effective delivery of scope. - Compliance of all necessary requirement of approved quality procedure. - Supervision in NDT & hydrotest piping • Task after every project completion - Personnel Utilization – Tracking for how long sub-contractors (lifting and civil) usage. - Consumable Utilization- Tracking for how many insulation materials, painting materials and general usage. - Equipment & Tool Utilization – Tracking for how long equipment (forklift, crane, hiab) usage. - Daily Summary Sheet Show less

    • United States
    • Oil and Gas
    • 700 & Above Employee
    • Field Operation Professional / Field Engineer
      • Dec 2016 - Jun 2020

      Field experience in oil and gas industry from pumping and coiled-tubing operations such as well killing, acid stimulation, fishing, shifting plugs, nitrogen etc. • Maintenance on the equipment and temporary pipe work under supervision. • Tracking on every equipment and temporary pipe work with valid certification. • Strict compliance with all regulations and applicable company agreed procedures and policies to maintain safe operations with quality standard. • Documentation of permits and job safety analysis for each assigned tasks, safety focuses area by on-site hazard identification and risk assessment. • Pipework management which includes Piping & Instrumental Diagram (P&ID) • Quality check on fluid end product from chemical mixing -setting time/ viscosity / pH Valve • Data extraction and archiving from software program and produce post report from job operation. • Set-up software such as IFS, IWI for operation practice. • Set-up laboratories and develop finished products. Show less

    • Brunei Darussalam
    • Oil and Gas
    • 1 - 100 Employee
    • Student Internship
      • Jul 2015 - Sep 2015

      Main responsibilities are to undergo an Industrial Attachment Programme with Amrtur Sdn Bhd as an internship student. Learned how to perform inspection on the deep drilling pipe. Such as MPI, Pressure testing, Ultra Testing). Achieved Health Safety Environment quality standards and agreed procedures. Main responsibilities are to undergo an Industrial Attachment Programme with Amrtur Sdn Bhd as an internship student. Learned how to perform inspection on the deep drilling pipe. Such as MPI, Pressure testing, Ultra Testing). Achieved Health Safety Environment quality standards and agreed procedures.

Education

  • University of Birmingham
    Master's degree, Mechanical Engineering
    2014 - 2016
  • Taylor's University
    Bachelor's degree, Mechanical Engineering
    2011 - 2014

Community

You need to have a working account to view this content. Click here to join now