Nikolaos Andrinopoulos
Mechanical Engineer at TERNA S.A.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Competencia básica profesional
-
Greek Competencia bilingüe o nativa
Topline Score
Bio
Experience
-
TERNA S.A.
-
Greece
-
Construction
-
400 - 500 Employee
-
Mechanical Engineer
-
sept. de 2022 - - actualidad
-
-
-
Cyfield Group
-
Cyprus
-
Construction
-
1 - 100 Employee
-
Mari 260 MW CCGT Power Plant, Site Manager
-
jul. de 2021 - sept. de 2022
-
-
-
Conspel Qatar WLL
-
Qatar
-
Construction
-
200 - 300 Employee
-
Senior Mechanical Project Engineer
-
oct. de 2017 - jul. de 2021
JPAC JV Qatar Foundation Stadium JPAC JV Qatar Foundation Stadium
-
-
-
-
Head of Plant Layout & Piping Dept.
-
jun. de 2006 - sept. de 2017
EPC Projects: -Vasilikos Power Station - Phase III, Unit 4 Combined Cycle Gas Turbine Electricity Authority of Cyprus-Vasilikos Power Station - Phase IV, Unit 5 Combined Cycle Gas Turbine Electricity Authority of Cyprus-450 MW Deir-Aamar Power Plant II (Incomplete) Mimistry of Energy & Water, Republic of Lebanon-Malta, Delimara, LNG receiving, storage, and regasification facilities Enemalta Coropration-Detailed Engineering, Procurement of Materials & Construction of the third LNG tank on Revithoussa, Island Hellenic Gas Transmission System Operator (DESFA)Main Offers:-Vasilikos Power Station - Phase IV, CCGT Unit 6 (18/07/2011) Electricity Authority of Cyprus-ΑΗΣ ΑΓ. ΔΗΜΗΤΡΙΟΥ, ΜΟΝΑΔΑ V – ΠΡΟΜΗΘΕΙΑ ΚΑΙ ΕΓΚΑΤΑΣΤΑΣΗ ΣΥΣΤΗΜΑΤΟΣ ΑΠΟΘΕΙΩΣΗΣ ΚΑΥΣΑΕΡΙΩΝ (07/06/2012)-Combined Cycle Gas Turbine Lichterfelde Block A Engineering, Procurement, construction and commissioning as weel as maintenance of the CCGT plant Lichterfelde (CC-CHP) Vattenfall Europe Warme AG-JORDAN - AQABA OIL TERMINAL-PROJECT (IRAQ)BISMAYAH 2 Mass global Investment
-
-
Cost Estimation engineer
-
abr. de 2005 - may. de 2006
-
-
Site Manager
-
jun. de 2004 - mar. de 2005
Project: Thessaloníki CCPP 390 MW Power Plant. Erection of one 9GE FA Gas Turbine and Auxiliaries of 260 MW. Client: ENERGIAKI THESSALONIKIS SA Main Contractor: VA TECH HYDRO GmbH (Austria)
-
-
Cost Estimation Engineer
-
mar. de 2003 - may. de 2004
Projects:- Motor Oil (Hellas) –Corinth Refineries S.A. UPGRD Project Year 2005- Motor Oil (Hellas) –Corinth Refineries S.A. Waste Water Treatment Plant. Revamping and Implementation of Existing WWT Plant.- Public Gas Corporation of Greece (DEPA) S.A. Greek Natural Gas Transmission System. High Pressure Pipeline 14” Construction from Mavroneri to Antikyra.- Public Gas Corporation of Greece (DEPA) S.A. Greek Natural Gas Transmission System. Επέκταση δικτύου Φυσικού Αερίου για Βιομηχανικούς καταναλωτές στο νομό Ευβοιας.- Public Gas Corporation of Greece (DEPA) S.A. Greek Natural Gas Transmission System. Construction of High Pressure Gas Pipeline 36” From the Greek – Turkish Borders to Alexandroupolis (Anthia).- Electricity Authority of Cyprus Vasilikos Power Station – Phase III Unit No.4 Combined Cycle gas Turbine.- Συντήρηση του Σταθμού Υγροποιημένου Φυσικού Αερίου στη Ρεβυθούσα.- Public Gas Corporation of Greece (DEPA) S.A. Greek Natural Gas Transmission System. Detailed Engineering, Procurement of Materials and Installation Works for the Remote Control of High Pressure Pipeline Valves of the Natural Gas Transmission Network in Greece- Violex – Bic S.A. Rearrangement of the Production Lines at Buildings A, C and D at the Athens Site in Anixi–Attiki
-
-
Health and Safety Engineer, Site Engineer
-
may. de 2001 - feb. de 2003
Project: Komotini Combined Cycle Power Station of 480 MW in Greece Erection of two Gas turbines (2x160 MW) and one steam turbine (1X160 MW) with auxiliaries. Client: Public Power corporation of Greece Main Contractor: ABB Alstom Power
-
-
Construction Manager- Piping works
-
may. de 2000 - abr. de 2001
Project: Thessaloníki Polypropylene Plant – 190 KT. Client: EKO Refinery S.A. Main Contractor: Technimont
-
-
-
-
Head Maintenance Engineer
-
feb. de 1998 - mar. de 2000
Position: Head of Mechanical Maintenance dpt Leading a team of 26 people.Company: BIC – VIOLEX S.A. (Manufacture and distribution of razor blades, razors, shaving apparatus, cigarette lighters and stationery products, including ball-point pens )Projects: - Completion of new factory in Anixi, Attiki - Design – Execution of new projects - Mechanical maintenance (HVAC Systems, Refrigerators, Chillers, Pumps, Cooling Towers, Boilers, Air Compressors, Fire fighting systems, Air handler units, Hydraulic systems)
-
-
-
-
Site Manager
-
ene. de 1997 - ene. de 1998
RODAX S.A. Position: Mechanical Engineer at the Engineering Department of the company, Site managerProjects: - Construction of new factory of BIC – VIOLEX S.A. in Anixi, Attiki - Detail design, Isometric drawings, Material supply, Piping prefabrication and erection, Equipment installation RODAX S.A. Position: Mechanical Engineer at the Engineering Department of the company, Site managerProjects: - Construction of new factory of BIC – VIOLEX S.A. in Anixi, Attiki - Detail design, Isometric drawings, Material supply, Piping prefabrication and erection, Equipment installation
-
-
-
-
Site Engineer
-
jul. de 1995 - ene. de 1996
Position: Mechanical Engineer at the Engineering Department of the company, Site EngineerProjects: - CONSTRUCTION OF PPC AGHIOS DIMITRIOS SES UNIT V (350 MWe & 70 MWth. - Detail design, Isometric drawings, Equipment installation Position: Mechanical Engineer at the Engineering Department of the company, Site EngineerProjects: - CONSTRUCTION OF PPC AGHIOS DIMITRIOS SES UNIT V (350 MWe & 70 MWth. - Detail design, Isometric drawings, Equipment installation
-
-
-
-
Site Engineer
-
feb. de 1994 - ene. de 1995
Projects: - EKO REFINARY, SIDENOR and other plants in Thessaloniki area. - Installation of fire fighting systems, Steel structure constructions, Chemical and mechanical cleaning of exchangers, Maintenance works during shutdown, Piping erection works. Projects: - EKO REFINARY, SIDENOR and other plants in Thessaloniki area. - Installation of fire fighting systems, Steel structure constructions, Chemical and mechanical cleaning of exchangers, Maintenance works during shutdown, Piping erection works.
-
-
-
EKO Hellas
-
Greece
-
Oil and Gas
-
100 - 200 Employee
-
Quality Control
-
jun. de 1993 - ago. de 1993
-
-
Education
-
Aristotle University of Thessaloniki (AUTH)
Master of Science (MSc), Mechanical Engineering, Faculty of Engineering, School of Mechanical Engineering -
Hellenic Open University
Master of Business Administration - MBA, Business Administration and Management, General