Andrew Watson

Engineering Manager at UDEC Pty Ltd
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Greater Brisbane Area, AU

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Australia
    • Utilities
    • 1 - 100 Employee
    • Engineering Manager
      • Mar 2016 - Present

  • Macmahon Contractors
    • Queensland, Australia
    • Project Manager
      • Jul 2008 - Jul 2014

      Project Manager - Trangie Nevertire Irrigation Scheme, NSW Design and Build Contract undertaking construction of 59km of EPDM lined irrigation channel and 238km of pressurised stock and domestic water pipeline. Project consisted of 400,000m³ of bulk earthworks prior to lining with EPDM liner, installation of pipe crossings and remediation works to existing structures and new build upgrade of SCADA controlled Pump Station. Project Manager - GLNG A joint venture between Santos and LNG companies to process coal seam gas into LNG, located on Curtis Island, 2km offshore from Gladstone, Qld. Macmahon was subcontracted to Bechtel Australia Pty Ltd (Principal Contractor) for site civil works. The contract package included clearing for a 160 hectare greenfield site on the south west side of Curtis Island, including; over 7 million m³ of bulk earthworks, drill / blast and mechanical processing of rock, 850,000t pavement construction, road surfacing & sealing works, rock scour protection and drainage. Design Interface Manager - Tropicana Gold Mine Tropicana Gold project is a 10 year mining contract awarded to Macmahon to develop the Greenfields Gold Project, located 380km NE of Kalgoorlie, for the Tropicana Joint Venture between AngloGold - Ashanti Australia Ltd (AGAA) and Independence Group NL. The infrastructure works to operate the mine included design and construction of infrastructure/roads and 5 large workshop buildings and automated wash bay facilities to accommodate mining equipment such as CAT 793F Dump Trucks. Construction Manager - Wyaralong Dam A roller compacted concrete (RCC) gravity dam built on the Teviot Brook, Beaudesert. The project was designed and delivered under a project alliance agreement. Project was completed within budget and within the estimated project completion baseline programme. Coal Stream Alliance (TOC Phase) Construction Manager Show less

    • Project Manager / Director
      • Apr 1994 - May 2008

      Project management of RC works on numerous major civil engineering projects in the UK Appointed Safety and Contracts Director 1999 Project management of RC works on numerous major civil engineering projects in the UK Appointed Safety and Contracts Director 1999

    • Senior Project Engineer
      • May 1989 - Apr 1994

      Senior Project Engineer for various civil disciplines, including earthworks, drainage, pavements and structures / bridgeworks. Senior Project Engineer for various civil disciplines, including earthworks, drainage, pavements and structures / bridgeworks.

    • Site Engineer
      • Oct 1988 - May 1989

      Site engineer based on BNFL, Sellafield for major civil projects Site engineer based on BNFL, Sellafield for major civil projects

    • Site Engineer
      • Jun 1987 - Oct 1988

      Site engineer on a Bechtel EPCM PET Expansion Project Site engineer on a Bechtel EPCM PET Expansion Project

Education

  • Middlesex University
    Bachelor of Engineering (B.Eng.), Civil Engineering
  • Bolton Institute of Higher Education
    Higher National Diploma, Civil Engineering

Community

You need to have a working account to view this content. Click here to join now