Andrew Krieg

Leading hand E&I Technician at Eftech International
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Mount Barker Junction, South Australia, Australia, AU

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Australia
    • Oil and Gas
    • 1 - 100 Employee
    • Leading hand E&I Technician
      • Sep 2022 - Present

      Oil and gas project work in the Cooper basin - Beam pump construction - Installation of metering instruments and Tubing - Testing and QA - Hazardous areas installation and inspections Oil and gas project work in the Cooper basin - Beam pump construction - Installation of metering instruments and Tubing - Testing and QA - Hazardous areas installation and inspections

    • Australia
    • Facilities Services
    • 700 & Above Employee
    • Industrial Electrician
      • Jun 2020 - Jan 2023

      Bhp Olympic Dam Training • General site induction • Underground inductions • Level 1 isolator • Various area specific inductions • Job owner Responsibilities • Adhere to strict BHP safety and permit systems. • Working on various projects across multiple areas of site.  Reading and following site specific plans  QA, commissioning and inspections  Termination of panels and field devices  Installation of earthing systems  Cable ladder installation  SWA cable glanding and termination. Show less

    • Australia
    • Engineering Services
    • 700 & Above Employee
    • E&I technician
      • Jun 2018 - May 2020

      Electrical/Instrumentation technician Leading Hand – Cape Lambert / Karratha Gas Plant JUNE 2018 – PRESENT Woodside Training • PA (Permit Authority) – Hold permits to work and be responsible for the team performing the task at hand. Write new permits if required. • REO (Restricted Electrical Officer) – Perform and verify own electrical isolations. • RIC (Recipient in Charge) – Ability to hold permits under High Voltage isolations and control the work area. Responsibilities • Perform and verify own electrical isolations. • Hold permits to work, including HV access permits. • Ensure OH&S and safety standards are always adhered to. • Working within the constraints of work packs and all associated Hold Points. • Installation and Termination of switch boards. • Installation of cable tray. • Installation of power and lighting SWA cable. • Reading and following site specific plans. • Termination of Hazardous Area Rated Field equipment. • QA, commissioning and inspections. • Fault finding and start up. • Adhere to strict Woodside Permit to Work systems. • Working in and around live hazardous areas. • Glanding, lugging and terminations of large LV cabling (up to 500mm) to transformers and new switchboard feeders. • Being responsible for a team of up to 15 electrical personnel. • Bench testing of new MCC modules (ABB). • Stand-in electrical supervisor. Show less

    • Australia
    • Civil Engineering
    • 700 & Above Employee
    • Electrician
      • Jan 2016 - Jan 2018

      Electrician/Instrumentation technician – Wheatstone LNG Project APRIL 2016 – JAN 2018 Responsibilities • HV/LV and instrumentation cable install using winches, ropes, pulleys, sheathes, rigging equipment and rollers in challenging conditions along complicated cable routes • Working from scaffolding in strict "drop free" zones • Working at heights • Working in confined spaces • Stainless steel cable ladder and steel conduit fabrication and installation • Steel Wire Armour compression glanding • Power and instrument terminations • Switchboard / Junction box / Instrumentation Panel and Lighting install • Schematic and wiring diagram interpretation • Electrical paperwork and labelling • Testing and commissioning • Complete inspections of field instruments including valves, temperature sensors, pressure indicators etc. • Use of HART communicators • Calibration of sensitive equipment • Tube pressure testing using high pressure equipment • SWAGELOCK training to ensure the correct tubing practices were followed • Bench testing of equipment • Stroking of Valves in the field • Completing all associated paperwork including ITR's Show less

    • Australia
    • Industrial Machinery Manufacturing
    • 200 - 300 Employee
    • Electrician
      • Jun 2015 - Dec 2015

      Electrician – Roy Hill Iron Ore mine construction project MARCH 2015 – DECEMBER 2016 Responsibilities  Ensure OH&S and safety standards are always adhered to  Installation and Termination of switch boards  Installation of cable tray  Installation of power and lighting SWA cable  Reading and following site specific plans  QA, commissioning and inspections  Termination of panels and field devices  Installation of earthing systems  Steel conduit and anaconda installation Show less

Community

You need to have a working account to view this content. Click here to join now