Andrew Jess

Senior Architect at Oberlanders Architects
  • Claim this Profile
Online Presence
Contact Information
Location
Edinburgh, UK

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • United Kingdom
    • Architecture and Planning
    • 1 - 100 Employee
    • Senior Architect
      • May 2023 - Present

      Edinburgh, Scotland, United Kingdom

    • Canada
    • Architecture and Planning
    • 700 & Above Employee
    • Senior Architect
      • May 2022 - May 2023

      Glasgow, Scotland, United Kingdom Key projects: Prestwick Spaceport, South Ayrshire Council, Prestwick. Senior Architect / Project Lead. - Type: Transport/Aviation - Value: £24m - Start on Site: First Launch 2024 The Baird Family Hospital and The ANCHOR Centre, Aberdeen. Senior Architect / Project Lead. - Type: Healthcare - Value: £244.8m - Start on Site: January 2021, Construction Completion: June 2023 (ANCHOR), Summer 2024 (Baird)

    • United Kingdom
    • Architecture and Planning
    • 1 - 100 Employee
    • Senior Architect
      • Sep 2020 - May 2022

      Edinburgh, Scotland, United Kingdom Key projects: 224 Mayfield Road, Edinburgh. Senior Project Architect. - Type: 148 bed Student Residential (Modular Construction), - Value: £9.8m approx - Start on Site: July 2021, Completion: August 2022 200 Mayfield Road, Edinburgh. Senior Project Architect. - Type: 111 bed Student Residential (Modular Construction), - Value: £7.4m approx - Start on Site: July 2021, Completion: August 2022 Lanark Road, Edinburgh. Senior Project Architect. -… Show more Key projects: 224 Mayfield Road, Edinburgh. Senior Project Architect. - Type: 148 bed Student Residential (Modular Construction), - Value: £9.8m approx - Start on Site: July 2021, Completion: August 2022 200 Mayfield Road, Edinburgh. Senior Project Architect. - Type: 111 bed Student Residential (Modular Construction), - Value: £7.4m approx - Start on Site: July 2021, Completion: August 2022 Lanark Road, Edinburgh. Senior Project Architect. - Type: 134 bed Student Residential (Modular Construction), - Value: £8.8m approx - Start on Site: Autumn 2021, Completion: Autumn 2022 Show less

    • United Kingdom
    • Architecture and Planning
    • 1 - 100 Employee
    • Member of Council
      • May 2020 - May 2022

      Edinburgh, Scotland, United Kingdom

    • United Kingdom
    • Architecture and Planning
    • 1 - 100 Employee
    • Project Architect
      • Mar 2016 - Sep 2020

      Edinburgh, United Kingdom Key projects: Dumbarton Harbour Phase 3, Dumbarton. Project Architect. - Type: Residential, - Value: £5.0m - Start on Site: February 2020, Completion: June 2021 . All Saints and Rochsolloch Primary Schools. Project Architect. - Type: Education, - Value: £1.0m - Start on Site: March 2020, Completion: July/August 2020. Dumbarton Harbour Phase 1 & 2, Dumbarton. Project Architect. - Type: Residential, - Value: £15.0m - Start on Site:… Show more Key projects: Dumbarton Harbour Phase 3, Dumbarton. Project Architect. - Type: Residential, - Value: £5.0m - Start on Site: February 2020, Completion: June 2021 . All Saints and Rochsolloch Primary Schools. Project Architect. - Type: Education, - Value: £1.0m - Start on Site: March 2020, Completion: July/August 2020. Dumbarton Harbour Phase 1 & 2, Dumbarton. Project Architect. - Type: Residential, - Value: £15.0m - Start on Site: November 2017, Completion: June 2020 . Elgin High School, Elgin. Architect. - Type: Education, - Value: £28.8m - Start on Site: September 2015, Completion: October 2017(Phase 1)June 2018(Phases 2 & 3). Higgs Centre for Innovation, Royal Observatory, Edinburgh. Architect. - Type: Mixed use/Office, - Value: £5.3m - Start on Site: January 2016, Completion: December 2017.

    • Part II Architectural Assistant
      • Dec 2014 - Mar 2016

      Edinburgh, United Kingdom I joined the practice in 2014 and have been successfully involved on a range of project types including residential, commercial, and a number of education projects, delivered through the hubco model. Key projects: - Elgin High School, Elgin. (Education) - St Andrews Drive, Glasgow. (Residential) - Higgs Centre for Innovation, Royal Observatory, Edinburgh. (Commercial/Science)

    • United Kingdom
    • Architecture and Planning
    • 1 - 100 Employee
    • Part II Architectural Assistant
      • Apr 2013 - Dec 2014

      Edinburgh, United Kingdom I joined Smith Scott Mullan (SSM) in Edinburgh, on a fulltime basis, in April 2013. During my time at SSM I gained considerable experience in the design and delivery of various building types from bespoke new build houses for private clients, to large scale residential developments, and education projects. Key projects: - Raploch Site 4A, Stirling. (Residential) - Thistle Phase 2, Edinburgh. (Residential) - St Barnabas Court, Edinburgh. (Residential) - Kirkliston Nursery… Show more I joined Smith Scott Mullan (SSM) in Edinburgh, on a fulltime basis, in April 2013. During my time at SSM I gained considerable experience in the design and delivery of various building types from bespoke new build houses for private clients, to large scale residential developments, and education projects. Key projects: - Raploch Site 4A, Stirling. (Residential) - Thistle Phase 2, Edinburgh. (Residential) - St Barnabas Court, Edinburgh. (Residential) - Kirkliston Nursery, Edinburgh. (Education) Show less

    • United Kingdom
    • Construction
    • 1 - 100 Employee
    • Part II Architectural Assistant
      • Jan 2013 - Apr 2013

      Banchory, Aberdeenshire Part-time position with a local practice based in Banchory, Aberdeenshire. Worked alongside the practice director on domestic alterations and extensions in accordance with Scottish Building Regulations. Key projects: - Raemoir House Hotel, Banchory. (Interior/Fit-out) - Kirkton Barn, Perth. (Residential) Roles included: - Dimensional and ground level surveys of existing sites and buildings. - Preparation of Planning Consent and Building Warrant Applications. -… Show more Part-time position with a local practice based in Banchory, Aberdeenshire. Worked alongside the practice director on domestic alterations and extensions in accordance with Scottish Building Regulations. Key projects: - Raemoir House Hotel, Banchory. (Interior/Fit-out) - Kirkton Barn, Perth. (Residential) Roles included: - Dimensional and ground level surveys of existing sites and buildings. - Preparation of Planning Consent and Building Warrant Applications. - Taking responsibility for the organization of drawn and written information relating to projects. - Preparing concept drawings in 2D, 3D and photographic renders. Show less

    • United Kingdom
    • Architecture and Planning
    • 1 - 100 Employee
    • Part I Architectural Assistant
      • Sep 2009 - Sep 2010

      Bangor, Northern Ireland I undertook my 4th year placement with this medium sized practice based in Bangor, Northern Ireland gaining exposure in a variety of projects (under direction of the Project Architect) ranging in scale and complexity from modest home extensions to small town masterplans. Key projects: - Masterplan Newtownards Road, Donaghadee. (Masterplan) - Hillside Park, Comber. (Residential) - First Presbyterian Church, Bangor. (Ecclesiastical) Roles included: - Conducting site… Show more I undertook my 4th year placement with this medium sized practice based in Bangor, Northern Ireland gaining exposure in a variety of projects (under direction of the Project Architect) ranging in scale and complexity from modest home extensions to small town masterplans. Key projects: - Masterplan Newtownards Road, Donaghadee. (Masterplan) - Hillside Park, Comber. (Residential) - First Presbyterian Church, Bangor. (Ecclesiastical) Roles included: - Conducting site surveys and preparing record drawings. - Planning meetings with clients to formulate and refine project requirements. - Developing concept drawings of design proposals in 2D, 3D as well as photographic renders. - Assisted with Listed Building and Conservation Area Consent Applications. - Prepared Tender, Building Warrant and Construction drawing packages. - Physical model production. - Material sourcing and arrangement of samples for office/client use. Show less

    • Part I Architectural Assistant
      • Jun 2008 - Sep 2008

      Bangor, Northern Ireland Summer position with a local practice based in Bangor, Northern Ireland. Projects that I assisted with included bespoke designs for private clients alongside housing association schemes. Key projects: - Old Bangor Road, Bangor. (Residential) Roles included; - Conducting site surveys. - Preparing design proposals for Planning and Building Warrant applications. - Attending client meetings. - Attending site inspections and recording comments for design ammendments.

Education

  • The Robert Gordon University
    Master of Architecture (M.Arch.), Architecture
    2010 - 2012
  • The Robert Gordon University
    Bachelor of Science (BSc), Architecture
    2006 - 2010
  • Campbell College Belfast
    A Levels, Art & Design, Geography, Spanish
    1999 - 2006

Community

You need to have a working account to view this content. Click here to join now