Andrew James
Rigger at Advanced Cranes And Rigging- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
0
/5.0 / Based on 0 ratingsFilter reviews by:
Credentials
-
Advanced Rigging
- -
CO Slew Crane
- -
EWP
- -
First Aid & CPR
- -
Forklift
- -
IRATA Rope Access Level 1
- -
Tower Rescue
- -
Working at Heights
-
Experience
-
-
Rigger
-
Sep 2020 - Present
-
-
-
Professional Wind Services
-
Australia
-
Services for Renewable Energy
-
1 - 100 Employee
-
Wind turbine technician / main install lead
-
Mar 2020 - Aug 2020
Main install lead building vestas V150 , organising preparation work for main installing, dogging duel crane lifts with a LG1750, lifting of blades with a blade gripper, planing lifts and tag line positioning, developing swms & permit control. Main install lead building vestas V150 , organising preparation work for main installing, dogging duel crane lifts with a LG1750, lifting of blades with a blade gripper, planing lifts and tag line positioning, developing swms & permit control.
-
-
-
Global Wind Service
-
Denmark
-
Wind Electric Power Generation
-
700 & Above Employee
-
Lead Wind Turbine Technician / rigger
-
Nov 2018 - Mar 2020
Main installation & lead Pre installation team lead erecting senvion 3.XM planning works, assembling full rotors of 144m diameter lifting and directing tag lines, lifting nacelles , setting aliment & installing the rack system , setting rigging gear, preparation of tower sections , dogging cranes, duel lifts , dogging tower sections over the rack, planning & laying out components on pads, installing platforms and mechanical completions Main installation & lead Pre installation team lead erecting senvion 3.XM planning works, assembling full rotors of 144m diameter lifting and directing tag lines, lifting nacelles , setting aliment & installing the rack system , setting rigging gear, preparation of tower sections , dogging cranes, duel lifts , dogging tower sections over the rack, planning & laying out components on pads, installing platforms and mechanical completions
-
-
-
Hays
-
United Kingdom
-
Staffing and Recruiting
-
700 & Above Employee
-
Rigger / Gantry crane operator
-
Sep 2018 - Nov 2018
Rigging up pre cast panels lifting from casting beds,racking panels & loading trucks. Operating over head crane for panel lifting and loading. Rigging up pre cast panels lifting from casting beds,racking panels & loading trucks. Operating over head crane for panel lifting and loading.
-
-
-
Contract Resources Pty Ltd
-
Australia
-
Oil and Gas
-
400 - 500 Employee
-
Leading Hand Rigger / Turbine Install Technician
-
Feb 2018 - Aug 2018
Installation lead/rigger Conduct prestart meetings & daily shift reports Levelling & installing TBR Installing transformer & assembling controller Dogging door section over DTA & stacking tubes Torquing bolts as per specifications Dogging in Nacelle, hub & blades, torqueing and part turning Installing & operating single blade turning tool Installing & commissioning power climber lift Completing QA paperwork for tower & power climber Installation lead/rigger Conduct prestart meetings & daily shift reports Levelling & installing TBR Installing transformer & assembling controller Dogging door section over DTA & stacking tubes Torquing bolts as per specifications Dogging in Nacelle, hub & blades, torqueing and part turning Installing & operating single blade turning tool Installing & commissioning power climber lift Completing QA paperwork for tower & power climber
-
-
-
-
Rigger & Precast Installer
-
May 2017 - Feb 2018
Dogging Liebherr LR1280 with super lift Installing precast panels, super T’s, planks Platform modules & formwork Operating Dieci Pegasus, telescopic handlers & forklifts General construction lifts Surface and tunnel based operations Lifting high rail equipment on & off rail and earthmoving equipment in & out of box Dogging Liebherr LR1280 with super lift Installing precast panels, super T’s, planks Platform modules & formwork Operating Dieci Pegasus, telescopic handlers & forklifts General construction lifts Surface and tunnel based operations Lifting high rail equipment on & off rail and earthmoving equipment in & out of box
-
-
-
Laing O'Rourke
-
Construction
-
700 & Above Employee
-
Rigger
-
Jan 2014 - Mar 2017
Dogging cranes 40-1350t Assembling & disassembling Liebherr crawler cranes 300t and 280t with luffing fly Stick building structural steel modules Installing delivered modules Rigging & installing pipes Laying out steel wall plates with vac lifters Setting up lifts, following lift plans & studies Assembling & lifting roof pedals and suspended decks Lifting & installing precast concrete Installing shutters & slipform modules Operating & working from EWP up to 150ft and scissor lift Torquing bolts with high torque and flogging spanners Reading drawings Dogging crane from man cage Quarterly test & tagging of lifting gear & heights equipment Show less
-
-
Education
-
Dungog High School