Andrew James

Rigger at Advanced Cranes And Rigging
  • Claim this Profile
Contact Information
Location
Greater Melbourne Area, AU

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Credentials

  • Advanced Rigging
    -
  • CO Slew Crane
    -
  • EWP
    -
  • First Aid & CPR
    -
  • Forklift
    -
  • IRATA Rope Access Level 1
    -
  • Tower Rescue
    -
  • Working at Heights
    -

Experience

    • Rigger
      • Sep 2020 - Present
    • Australia
    • Services for Renewable Energy
    • 1 - 100 Employee
    • Wind turbine technician / main install lead
      • Mar 2020 - Aug 2020

      Main install lead building vestas V150 , organising preparation work for main installing, dogging duel crane lifts with a LG1750, lifting of blades with a blade gripper, planing lifts and tag line positioning, developing swms & permit control. Main install lead building vestas V150 , organising preparation work for main installing, dogging duel crane lifts with a LG1750, lifting of blades with a blade gripper, planing lifts and tag line positioning, developing swms & permit control.

    • Denmark
    • Wind Electric Power Generation
    • 700 & Above Employee
    • Lead Wind Turbine Technician / rigger
      • Nov 2018 - Mar 2020

      Main installation & lead Pre installation team lead erecting senvion 3.XM planning works, assembling full rotors of 144m diameter lifting and directing tag lines, lifting nacelles , setting aliment & installing the rack system , setting rigging gear, preparation of tower sections , dogging cranes, duel lifts , dogging tower sections over the rack, planning & laying out components on pads, installing platforms and mechanical completions Main installation & lead Pre installation team lead erecting senvion 3.XM planning works, assembling full rotors of 144m diameter lifting and directing tag lines, lifting nacelles , setting aliment & installing the rack system , setting rigging gear, preparation of tower sections , dogging cranes, duel lifts , dogging tower sections over the rack, planning & laying out components on pads, installing platforms and mechanical completions

    • United Kingdom
    • Staffing and Recruiting
    • 700 & Above Employee
    • Rigger / Gantry crane operator
      • Sep 2018 - Nov 2018

      Rigging up pre cast panels lifting from casting beds,racking panels & loading trucks. Operating over head crane for panel lifting and loading. Rigging up pre cast panels lifting from casting beds,racking panels & loading trucks. Operating over head crane for panel lifting and loading.

    • Australia
    • Oil and Gas
    • 400 - 500 Employee
    • Leading Hand Rigger / Turbine Install Technician
      • Feb 2018 - Aug 2018

      Installation lead/rigger Conduct prestart meetings & daily shift reports Levelling & installing TBR Installing transformer & assembling controller Dogging door section over DTA & stacking tubes Torquing bolts as per specifications Dogging in Nacelle, hub & blades, torqueing and part turning Installing & operating single blade turning tool Installing & commissioning power climber lift Completing QA paperwork for tower & power climber Installation lead/rigger Conduct prestart meetings & daily shift reports Levelling & installing TBR Installing transformer & assembling controller Dogging door section over DTA & stacking tubes Torquing bolts as per specifications Dogging in Nacelle, hub & blades, torqueing and part turning Installing & operating single blade turning tool Installing & commissioning power climber lift Completing QA paperwork for tower & power climber

    • Rigger & Precast Installer
      • May 2017 - Feb 2018

      Dogging Liebherr LR1280 with super lift Installing precast panels, super T’s, planks Platform modules & formwork Operating Dieci Pegasus, telescopic handlers & forklifts General construction lifts Surface and tunnel based operations Lifting high rail equipment on & off rail and earthmoving equipment in & out of box Dogging Liebherr LR1280 with super lift Installing precast panels, super T’s, planks Platform modules & formwork Operating Dieci Pegasus, telescopic handlers & forklifts General construction lifts Surface and tunnel based operations Lifting high rail equipment on & off rail and earthmoving equipment in & out of box

    • Construction
    • 700 & Above Employee
    • Rigger
      • Jan 2014 - Mar 2017

      Dogging cranes 40-1350t Assembling & disassembling Liebherr crawler cranes 300t and 280t with luffing fly Stick building structural steel modules Installing delivered modules Rigging & installing pipes Laying out steel wall plates with vac lifters Setting up lifts, following lift plans & studies Assembling & lifting roof pedals and suspended decks Lifting & installing precast concrete Installing shutters & slipform modules Operating & working from EWP up to 150ft and scissor lift Torquing bolts with high torque and flogging spanners Reading drawings Dogging crane from man cage Quarterly test & tagging of lifting gear & heights equipment Show less

Education

  • Dungog High School
    2004 - 2009

Community

You need to have a working account to view this content. Click here to join now