Andrew Gauld

Surveyor at Fox Geospatial
  • Claim this Profile
Contact Information
Location
AU

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Australia
    • Construction
    • 1 - 100 Employee
    • Surveyor
      • Jan 2021 - Present
    • Senior Surveyor
      • Jun 2018 - Jan 2021

      Currently working on the Melbourne Metro Rail Project as a tunnel surveyor Currently working on the Melbourne Metro Rail Project as a tunnel surveyor

    • Australia
    • Real Estate
    • Civil surveyor
      • Jun 2016 - Jun 2018
    • Australia
    • Architecture and Planning
    • 1 - 100 Employee
    • Construction Surveyor
      • Jan 2016 - Jun 2016

      • Sole Surveyor on 3 Tower High Rise Development (Coorparoo Square $130 million dollar project) • Height Certificates (Form 16’s) • High Rise Setout. (Walls, Grids, Columns, Wet Areas, Lifts etc) • As-Built Services relating to High Rise Development. • Survey Calculations from plans and DWG files. • Use of Magnet Surveying Software. • Use of Trimble S8 and TSC3 • Sole Surveyor on 3 Tower High Rise Development (Coorparoo Square $130 million dollar project) • Height Certificates (Form 16’s) • High Rise Setout. (Walls, Grids, Columns, Wet Areas, Lifts etc) • As-Built Services relating to High Rise Development. • Survey Calculations from plans and DWG files. • Use of Magnet Surveying Software. • Use of Trimble S8 and TSC3

    • United States
    • Environmental Services
    • 1 - 100 Employee
    • Engineering Surveyor
      • Apr 2015 - Dec 2015

      • Project Boundary Set out • Clearing Limits Set out • Sediment Basin Set out and as built • Environment Drain as built • Cadastral Fence setout and GIP location Surveys • Batter set outs and Conformance • Use of Leica Total Station and Viva GPS • Use of 12D field • Project Boundary Set out • Clearing Limits Set out • Sediment Basin Set out and as built • Environment Drain as built • Cadastral Fence setout and GIP location Surveys • Batter set outs and Conformance • Use of Leica Total Station and Viva GPS • Use of 12D field

    • Australia
    • Business Consulting and Services
    • 1 - 100 Employee
    • Engineering/Construction Surveyor
      • Feb 2015 - Apr 2015

      Change in Cirumstances require new position • House and Townhouse set-outs • Medium Density Building set-outs • DTM’s • Sewer and Stormwater set-out and as-built • Kerb and Road set-out. • Use of Trimble S8 and Trimble DGPS Change in Cirumstances require new position • House and Townhouse set-outs • Medium Density Building set-outs • DTM’s • Sewer and Stormwater set-out and as-built • Kerb and Road set-out. • Use of Trimble S8 and Trimble DGPS

    • Australia
    • Surveying and Mapping Services
    • 200 - 300 Employee
    • Contract Surveyor
      • Oct 2014 - Feb 2015

      Contract construction surveyor working in the Ichthys Gas Project. • HDPE/GRE (water and sewer) as built and set out • Pedestal and bolts as built and set out • Trench Conformance checks • Use of Trimble S8 and Trimble DGPS • Knowledge and use of Liscad Contract construction surveyor working in the Ichthys Gas Project. • HDPE/GRE (water and sewer) as built and set out • Pedestal and bolts as built and set out • Trench Conformance checks • Use of Trimble S8 and Trimble DGPS • Knowledge and use of Liscad

    • Mine Surveyor
      • Apr 2012 - Jun 2014

      Mine Closure forced redundancy • Use of Micromine software for survey data • Independently managed survey activities on a daily basis for the mine • Established and maintained data record keeping processes, initiated and implemented a job register of work completed, job accountability and file management • Maintained safe working environment through use of JHA’s • Use of Leica Total Station and Leica Viva GPS for the following: o Daily Mine Production surveys including but not limited to: TBM’s, Blast DTM’s, Blast Pattern Set out and Pick Up, Blast Volume Calculations, Ore Block Mark Outs, Crest/Toe Mark Outs and Pick Ups o Grade Control Pattern Set Outs and Pick Ups o Weekly Pit Plan Updates o End of Month Surveys and Volume Calculations (Pits, Stockpiles and Waste Dumps) o Maintaining and updating Site Plans including Infrastructure and Services

    • Surveyor
      • Jan 2010 - Jan 2012

      • Perform surveys using Topcon Total Stations and Sokkia GPS in a broad range of practice contexts, construction set out surveys of townhouse slabs, civil construction set out including internal road centrelines, kerb (cut and fill), sewer and stormwater, as constructed surveys and detail surveys • Lead and execute calculations and reductions for a range of field surveys, using Civilcad survey software • Oversee the drafting of survey plans and implement quality assurance processes • Liaise with a range clients and stakeholders regarding the status of projects • Regularly test, calibrate and maintain survey equipment

Education

  • USQ
    Associate's Degree, Spatial Science
    2008 - 2012
  • Griffith University
    Bachelor's Degree, Education
    1996 - 2000

Community

You need to have a working account to view this content. Click here to join now