Andrea Sesenna

Project Manager at Webuild
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Washington, District of Columbia, United States, US
Languages
  • Spanish -
  • English -
  • Italian -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Italy
    • Construction
    • 700 & Above Employee
    • Project Manager
      • Apr 2021 - Present

      North East Boundary Tunnel project - The NEBT is the biggest component of DC Water’s Clean Rivers Project and it will increase the capacity of the District’s sewer system, significantly mitigating the frequency, magnitude, and duration of sewer flooding. It will also help improve the water quality of the Anacostia River. The project is characterized by the installation of 26,700 foot long tunnel, 90 to 180 feet below ground, and 7 deep shafts with diameter variable from 25 to 55 feet. Concrete works also include the construction of several Ventilation control facilities to regulate air flow and diversion facilities along the tunnel alignment. Show less

    • Italy
    • Construction
    • 700 & Above Employee
    • Construction manager
      • Apr 2018 - Apr 2021

      North East Boundary Tunnel project - The NEBT is the biggest component of DC Water’s Clean Rivers Project and it will increase the capacity of the District’s sewer system, significantly mitigating the frequency, magnitude, and duration of sewer flooding. It will also help improve the water quality of the Anacostia River.The project is characterized by the installation of 26,700 foot long tunnel, 90 to 180 feet below ground, and 7 deep shafts with diameter variable from 25 to 55 feet.Concrete works also include the construction of several Ventilation control facilities to regulate air flow and diversion facilities along the tunnel alignment. Show less

    • Construction manager
      • Apr 2017 - Apr 2018

      Anacostia River Tunnel project - The Anacostia River Tunnel project, part of the Clean Rivers project of DC Water, involves the construction of an hydraulic tunnel 3.8 km long with 7 m diameter and 6 water capture wells, approximately 30 m deep with variable diameter from 9 to 22 m.Concrete works also include the construction of 5 Odor control unit and Approach Channel, 1 Diversion Chamber, 3 connection between the shaft and the main tunnel, Electromechanical works and minor connection to the existing infrastructures. Show less

    • Senior Concrete Engineer
      • Sep 2015 - Apr 2017

      Anacostia River Tunnel project - The Anacostia River Tunnel project, part of the Clean Rivers project of DC Water, involves the construction of an hydraulic tunnel 3.8 km long with 7 m diameter and 6 water capture wells, approximately 30 m deep with variable diameter from 9 to 22 m.Concrete works also include the construction of 5 Odor control unit and Approach Channel, 1 Diversion Chamber, 3 connection between the shaft and the main tunnel, Electromechanical works and minor connection to the existing infrastructures. Show less

    • Concrete Engineer
      • Mar 2011 - Sep 2015

      Panama Canal - Third Set of Locks - The construction of the Third Set of Locks of the Canal will allow the passage of ships of greater tonnage called Post Panamax, with a capacity of up to 12,000 TEUs, a length of 366 meters, a width of 49 meters, a draft of 15 meters. Each of the three rooms is 55 meters wide, 427 meters long, 18.3 meters deep, and are equipped with systems bulkheads sliding horizontally, that overcome the height difference of 27 meters between the ocean and Lake Gatun .

    • Civil Engineering
    • 400 - 500 Employee
    • Project Manager
      • Aug 2010 - Mar 2011

      Ruwais expansion refinery

    • Project Manager
      • Jul 2009 - Aug 2010

      Second phase of the industrial port Shahid Rajaee, in Bandar Abbas (Iran) characterized by 505 diaphragm walls T shape of 36.2 m depth and anchor diaphragms of 13.2 m depth.

    • Assistant Project Manager
      • Nov 2008 - Jul 2009

    • Italy
    • Construction
    • 300 - 400 Employee
    • Assistant Site Manager
      • Nov 2005 - Nov 2008

      Construction of Hydroelectric Project Mazar (Ecuador) characterized by a rock dam, 183 m in height and 5 million cubic meters of volume of rock, facing upstream with waterproof concrete and an underground station with two turbines with a capacity of 194 MW Construction of Hydroelectric Project Mazar (Ecuador) characterized by a rock dam, 183 m in height and 5 million cubic meters of volume of rock, facing upstream with waterproof concrete and an underground station with two turbines with a capacity of 194 MW

    • Assistant Site Manager
      • May 2004 - Nov 2005

      Construction of high-speed rail system, the Milan - Naples, on the Milano - Bologna, construction lot 1.4 Construction of high-speed rail system, the Milan - Naples, on the Milano - Bologna, construction lot 1.4

Education

  • Università degli Studi di Parma
    Engineer's degree, Civil Engineer
    1998 - 2004

Community

You need to have a working account to view this content. Click here to join now