Andrea Ortega
architect at SLCE Architects- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
SLCE Architects
-
United States
-
Architecture and Planning
-
1 - 100 Employee
-
architect
-
Jun 2012 - Present
-
-
-
-
architect
-
2010 - Dec 2012
-
-
-
-
Job Captain
-
Aug 2005 - Sep 2010
High End Residential Houses; ; 3 stories & Cellar average of 8,000 SF each. Develop and produce DOB set from design concepts and complete production and coordination for CD and Bid phases. Assist the project manager in coordination meetings with external consultants. One York, New York City. High End/High Rise Residential project designed by Enrique Norten. (2005-2008); 13 stories 119,000 SF, currently under TCO & CO process. In charge of preparation of DOB, Bid and Construction Documents, Condo Plans, Fire Protection plans & Tax Lot Plans. Responsible for coordinating and leading the production team to develop detailed construction documents set. Assist the Project Manager with project administration tasks and regular meetings; Maintain updated electronic drawing files. In charge of coordination process with multiple team members, external consultants and client to ensure designs concept, New York City Building Codes and ADA guidelines are respected throughout the process. Revise and approve Shop Drawings & punch list for client.; 30 stories high, 148,500 SF. Develop design concept to bid & construction documents. Responsible for MEP & Structural coordination.; 12 stories high, 55,800 SF. Take design concept to prepare Bid documents for core & shell. Show less
-
-
-
Ismael Leyva Architects
-
United States
-
Architecture and Planning
-
1 - 100 Employee
-
PROJECT ARCHITECT
-
Jun 2005 - Aug 2005
-
-
-
-
Designer Architect
-
May 2001 - Jul 2005
Develop architectural plans from schematic to design development. Elaboration of bid and construction documents. The station is currently open and fully functioning.22Nd St. Station: Construction Documents, responding to RFI, reviewing and evaluating Change Orders and compiling As Built drawing set.
-
-
designer architect
-
Jun 2001 - May 2005
Dey St. Passageway conceptual design to connect Broadway subway line to WTC Path. The proposed passageway included the incorporation of ADA access to Fulton St. Station and Cortland St Station.Conceptual design for GCT-IRT Link passageway to Penn Station. Site evaluation, coordination meetings and developed of three options. Transit Maintenance Facilities, throughout New Jersey and New York 2003Development of conceptual design, final layout and construction documents.
-
-
designer architect
-
Jun 2001 - May 2005
Site evaluations and final design of safety and health issues for 8 Newark public schools. In charge of Final design and construction documents for Disaster Recovery Room, Dayton Street School.230 Broadway Media Center: develop architectural plans from schematic to bid phase.
-
-
-
-
Research/ Teacher Assistant
-
Jan 2001 - May 2001
for Master Infrastructure Planning Program. Develop of Pleasentville Master Plan Phase II. for Master Infrastructure Planning Program. Develop of Pleasentville Master Plan Phase II.
-
-
-
-
Project Manager
-
Jan 2000 - Jul 2000
for site evaluation and survey of the downtown area. Building Code review and incorporation of design guidelines for renovation of historical buildings.Evaluation and designation of historical buildings and landmarks to be incorporated into the National Historical Record."Review of the Industrial Uses Study"
-
-
Urban architect
-
Jan 1996 - Jul 2000
-
-
Project Manager
-
Mar 1998 - Jun 2000
Project manager for Santiago's Land Use Plan and Building Code modification.Responsible to manage and coordinate a multidisciplinary team.In charge of research and create environmental and sustainable building design conditions, which were introduced for the first time to new small industrial uses.Responsible to present the project to the community, local authorities and board, and industrial and commercial commissions. This modification went through the local government approval as well as the national level; currently still in effect. Show less
-
-
-
-
Project Manager
-
Feb 1996 - Jul 2000
-
-
-
-
architetc
-
Mar 1998 - Dec 1998
-
-
-
-
Project architect
-
May 1997 - Feb 1998
in charge of assessment of existing building and public landmark. Responsible as well of establish building conditions that preserved the historical character as the main traffic and commercial route of Santiago, Chile's capital. Urban and Management Studies office in charge of assessment of existing building and public landmark. Responsible as well of establish building conditions that preserved the historical character as the main traffic and commercial route of Santiago, Chile's capital. Urban and Management Studies office
-
-
-
-
Architect coordinator
-
Feb 1996 - Mar 1997
Design contest to change and revitalized the foundational square "Armas" for the new Milenio, preserving its nature as the most important landmark of the capital. Design contest to change and revitalized the foundational square "Armas" for the new Milenio, preserving its nature as the most important landmark of the capital.
-
-
Education
-
New Jersey Institute of Technology
Master, Infraestructure Planning -
Universidad Andres Bello
-
Universidad Andres Bello
-
Las Teresianas
-
Pontificia Universidad Católica de ChileSchool of Management and Economy
Post, Urban Economy