André Fialho
Project Manager at Cobra Brasil- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Cobra Brasil
-
Brazil
-
Civil Engineering
-
400 - 500 Employee
-
Project Manager
-
Aug 2022 - Present
-
-
-
Voltalia
-
France
-
Renewable Energy Semiconductor Manufacturing
-
700 & Above Employee
-
-
Apr 2021 - Aug 2022
- Responsible for the development and structuring of greenfield projects (Wind and Solar)- Interface with different areas (Prospecting, Engineering, Real State, Environmental, Renewable Resources, Project Finance, among others) to optimization wind and solar layout- Portfolio management support- Support and coordination of M&A operations
-
-
-
Apr 2019 - Apr 2021
- Support in the preparation of documents to obtain Energy permission (Outroga - Aneel)- Energy Auctions Inscription- Support in the environmental conditions of LP, LI and LO phases, as permission by COMAER, DER, DNIT and PETROBRAS
-
-
-
May 2016 - Apr 2019
- Technical responsible for the GIS features to windpower, hydropower and solar energy projects- Environmental surveys and mapping of environmental restrictions for layouts- Positioning and dimension of Legal Reserves
-
-
-
-
GIS Analyst
-
Mar 2014 - Apr 2016
Projects developed: SAMARCO: Emergency Operation – Posto Regência, ES: - GIS specialist, responsible for Database handling, management and creation - Thematic maps creation - Digital Image Processing - Field surveys BP British Petroleum: WebGIS BP - Geodatabase management - Maps handling for WebGIS publication TBG Transportadora Brasileira Gasoduto Bolívia-Brasil: WebGIS TBG - HELP module development for WebGIS TNC The Nature Conservancy: Itaituba, Aveiro e Rurópolis - PA city mapping - Images and maps Georreferencing - Hydrography and road network vectoring from satellite images and Elevation Digital Model (DEM) - Satellite image equalization - Land use mapping - Topology corrections Show less
-
-
-
M.Berbert Consultoria Geoambiental
-
Seropédica
-
Geographer
-
Sep 2009 - Feb 2014
- Technical studies for Environmental (INEA) and Mineral (DNPM) Licensing - Calculation of ore deposit dimension, descriptive memorial of polygon vertices (DNPM) using AutoCAD - Participation in the development of Annual Mining Report (RAL), Environmental Management Plan (PCA), Economic Exploitation Plan (PAE), Research Final Report, Explanatory Memorial, Degraded Area Recovery Plan (PRAD), Mineral Exploration Plan - Field surveys inspections to obtain geographic coordinates (via GPS), mining progress monitoring reports and photos for reports - ART (Technical Responsibility Note - CREA) forms elaboration, describing the services performed. Show less
-
-
Education
-
Polytechnic School of UFRJ
Master of Business Administration - MBA, Gestão e Gerenciamento de Projeto -
Universidade Federal do Rio de Janeiro
Pós Graduação - MBE em Meio Ambiente da COPPE -
Universidade Federal Rural do Rio de Janeiro
Bacharelado em Geografia