Ananth Raja

Manager Civil at AMISTAD ONGPC
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Abu Dhabi Emirate, United Arab Emirates, AE

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Arab Emirates
    • Construction
    • 1 - 100 Employee
    • Manager Civil
      • Mar 2020 - Present

       EPC FOR GREENFIELD LIQUID TERMINAL AT KALIFA PORT IN ABU DHABI (PHASE-1A/B)  HAMRIYAH IPP 1800MW CCPP PROJECT – Civil Work’s UNIT 1,2 & 3  EPC FOR GREENFIELD LIQUID TERMINAL AT KALIFA PORT IN ABU DHABI (PHASE-1A/B)  HAMRIYAH IPP 1800MW CCPP PROJECT – Civil Work’s UNIT 1,2 & 3

    • Singapore
    • Engineering Services
    • 700 & Above Employee
    • Senior Civil Engineer Cum Civil Lead
      • Jun 2013 - Nov 2020

       Fujairah Oil Terminal  VLCC Jetty No. - 1  SEOOT Phase 7A Polyols Storage and Handling  EPCL Project Refinery Expansion Tankage Facilities  Fujairah Oil Terminal  VLCC Jetty No. - 1  SEOOT Phase 7A Polyols Storage and Handling  EPCL Project Refinery Expansion Tankage Facilities

    • Saudi Arabia
    • Construction
    • 1 - 100 Employee
    • Civil Site Manager
      • Dec 2008 - Dec 2012

       Bin Mahmood S/S Qatar Transmission system expansion phase X Substations Packages S3 & S4, 66/11kV Substations and 40MVA Cable Tranche’s, Sock way lines, Septic tank, Pump Room & Fire water tank.  LUSAIL Super – 2 S/S Qatar Transmission system expansion phase VIII Substations package S-3-2  400kV, 220kV, 132kV&66/11kV Substations and 800MVA, 200MVA, 60MVA&40MVA Cable Tranche’s, Sock way lines, Pump Room & Fire water tank, GIS Foundation  Bin Hajier Super S/S - Qatar Transmission system expansion phase VIII Substations  220kV,132kV&66/11Kv Building And Transformer foundation 315MVA,40MAV, Cable Tranche, Sock way lines, Boundary wall, Pump Room & Fire water tank, GIS Foundation Show less

    • South Korea
    • Shipbuilding
    • 700 & Above Employee
    • Senior Civil Engineer
      • Mar 2007 - Nov 2008

       Crude Export Facilities Project (The Hyundai Heavy Industries Company, Limited is engaged with the KUWAIT OIL COMPANY -Crude Export Facilities Project in Ahmadi, Kuwait. 19 Reinforced Concrete Tank Foundations each having a diameter of 92 meters with individual Outlet/Valve Pit structures, Pipe Sleeper, Pipe Support, Stair Access Foundation, Platform Foundation, Retaining Wall Perimeter Fence, Inlet Structures and a Main Gravity & Filling Manifolds  Crude Export Facilities Project (The Hyundai Heavy Industries Company, Limited is engaged with the KUWAIT OIL COMPANY -Crude Export Facilities Project in Ahmadi, Kuwait. 19 Reinforced Concrete Tank Foundations each having a diameter of 92 meters with individual Outlet/Valve Pit structures, Pipe Sleeper, Pipe Support, Stair Access Foundation, Platform Foundation, Retaining Wall Perimeter Fence, Inlet Structures and a Main Gravity & Filling Manifolds

    • Kuwait
    • Oil and Gas
    • 700 & Above Employee
    • Civil Engineer
      • Jun 2004 - Dec 2006

       Modifications in Tank Vapor System, Crude Tank Filling Pipe Work & Reconstruction of Tanks at SEK GCs  Joint Operation (JO) – Water Disposal Phase III Drain Recalling Facility, Wafra  Operation & Maintenance of Sludge handling & treatment Facility for KNPC Refineries.  Modifications in Tank Vapor System, Crude Tank Filling Pipe Work & Reconstruction of Tanks at SEK GCs  Joint Operation (JO) – Water Disposal Phase III Drain Recalling Facility, Wafra  Operation & Maintenance of Sludge handling & treatment Facility for KNPC Refineries.

Community

You need to have a working account to view this content. Click here to join now