ANA NATAL RODILLA

Head of Procurement at Grupo Cerro
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Chile, CL
Languages
  • Spanish Native or bilingual proficiency
  • English Full professional proficiency
  • French Elementary proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Carlos Felipe G.

Ana tiene una fuerza y capacidad de negociación admirable, su integridad, ética y compromiso a toda prueba, una visión de negocio clara y concreta, ha sido un agrado navegar por distintos momentos en cuales nos tocó compartir reuniones como mi cliente.

Melchor Gamarro Guijarro

Ana es una excelente profesional de compras, metódica, ordenada, responsable y con capacidad organizativa.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Chile
    • Electric Power Generation
    • 1 - 100 Employee
    • Head of Procurement
      • Oct 2022 - Present

      Developing and implementing the procurement procedures to meet all the requiremens relating to O&M of our solar and hydroelectric plants: - 110 MW Concentrated solar power CERRO DOMINADOR plant based in Antofagasta region. - 100 MW PV plant based in Antofagasta region. - 11 hydroelectric plants ( 60 MW) based in O´Higgings and La Araucanía regions. Developing and implementing the procurement procedures to meet all the requiremens relating to O&M of our solar and hydroelectric plants: - 110 MW Concentrated solar power CERRO DOMINADOR plant based in Antofagasta region. - 100 MW PV plant based in Antofagasta region. - 11 hydroelectric plants ( 60 MW) based in O´Higgings and La Araucanía regions.

    • Spain
    • Renewables & Environment
    • 500 - 600 Employee
    • Procurement Manager Chile, Peru & Argentina
      • Oct 2018 - Aug 2022

      Developing, implementing and executing country based procurement strategy. Leading and developing the procurement team according to company policies. Leading negotations of the main equipment and subcontractors. Driving superiorvalue through SAP implementation. International logistic Photovoltaic plants & Wind Farms EPC projects CHILE - PTFV 180 MW Andes IIB. Owner: Aes Gener - PTFV 240 MW y SET Sol del Desierto. Owner: Atlas Renewable Energy. - PTFV 80 MW Andes IIA. Owner: Aes Gener. - PTFV y SET 100 MW San Pedro I y IV. Owner: Global Power Generation (Naturgy). ARGENTINA - WF 97,2 MW Vientos Los Hercules . Owner: Total Eren&Mitsui. - WF 50 MW Garcia del Rio y Vientos del Secano. Owner: Envision Show less

    • Chile
    • Renewable Energy Semiconductor Manufacturing
    • 1 - 100 Employee
    • Procurement Manager ISOTRON CHILE. ISASTUR GROUP.
      • Jul 2013 - Jul 2018

      Responsible for the organization and leadership of the contracts, procurement and logistic operations: strategic sourcing, tenders, RFQ’s, negotation, contract administration. Communication with suppliers and engineers in order to achieve required service and meet project needs. Projects: Electric installation and industrial measuring technology of an hydroelectric power plant in Angostura. Client: Alstom Power Hydro. Electric installation and industrial measuring technology of a Lithium factory in Antofagasta. Client: Rockwood Lithium. Engineering, Procurement and Construction of electric substations and interconnection facilities for a 100 MW Photovoltaic power plant in Llano de Llampos. Client: Sun Edison. Engineering, Procurement and Construction of electric substation and interconnection facilities for a 50 MW Photovoltaic power plant in San Andrés. Client: Sun Edison. Juan Pablo Terra's wind farm in Artigas (Uruguay). Civil works of the plant (excavation, fundations, landfill,...), ewngineering, procurement and constuction of electric substation and interconnectios facilities. Client: Nordex. EPC of electrical lift and Tap-off substations for Taltal wind farm in Antofagasta (Chile). 99 MW. Client: CJR Wind. EPC of electric substation for a 70 MW Photovoltaic power plant in M Elena (Calama). Client: Sun Edison EPC of electric substation for a 30 MW San Pedro PV plant closed to Calama and 32 Km 2X220 KV high voltage transmission line . Client: Rijn Capital. EPC Los Loros 40 MW PV plant , electric substation and 1X220 KV high transmission line . Client: Solaire Direct. Show less

    • Canada
    • Civil Engineering
    • 700 & Above Employee
    • Buyer
      • Apr 2013 - Jul 2013

      Mining&Metallurgy Division. Timna Project Israel. Forms and issues purchase orders by performing the following: -Prepares bidder's list. -Prequalifies bidders. -Forms bid packages. -Issues bid requests. -Coordinates bidder's questions. -Receives bids. -Prepares Commercial Bid Summary and Recommendation Letter (LOR). -Prepares and maintains control and status reporting documents. Mining&Metallurgy Division. Timna Project Israel. Forms and issues purchase orders by performing the following: -Prepares bidder's list. -Prequalifies bidders. -Forms bid packages. -Issues bid requests. -Coordinates bidder's questions. -Receives bids. -Prepares Commercial Bid Summary and Recommendation Letter (LOR). -Prepares and maintains control and status reporting documents.

    • Construction
    • 1 - 100 Employee
    • Construction Manager on Site
      • Sep 2006 - Jun 2011

      Responsible for managing the assigned staff and all construction activities on site including the seeking, hiring and overseeing of sub-contractors, stakeholders and material deliveries. Ensuring project is completed on schedule, within a budget and according to building regulations and Health and Safety legislation as well as other legal requirements. Proposing corrective actions in order to minimize the project cost and enhance value for money. Liaising and chairing meetings with clients, architects and sub-contractors, regulatory agencies and gubernamental authorities. Monitoring and tracking detailed reports to Management. Show less

    • HSE Engineer
      • Feb 2006 - Sep 2006

      Responsible for monitoring the proper implementation of the projected Health, Safety and Environmental Plan on construction sites within applicable laws and regulations Responsible for monitoring the proper implementation of the projected Health, Safety and Environmental Plan on construction sites within applicable laws and regulations

    • Spain
    • Construction
    • Procurement Manager
      • Nov 2002 - Nov 2005

      Responsible for all technical purchases (mechanical & electric equipment). Development and implemention of purchasing procedures in accordance with company policy as well as negociating price, terms and contract conditions. Creation of new tool for potential supplier evaluations. Creation of global agreements with the main suppliers. Up-dating supplier records. Responsible for project budgeting launched by the Engineering Department. Liaising with assembly team in order to ensure compliance with standards and legislation. Strong implication with Marketing and Finance Department. Projects involved: Waste Water Treatment Plants, Gas Regulation and Measurement Station, Fire Protection Systems, Solar Heating, Mining mechanical and Electrical maintenance. Show less

Education

  • Universidad Adolfo Ibáñez
    Diplomado Strategic Sourcing
    2022 - 2022
  • Universidad de Oviedo
    Mining Engineer.Majoring in energy, Energy
  • Oviedo University
    Mining Engineer, Energy and fuels.

Community

You need to have a working account to view this content. Click here to join now