Amri Nurdin

Demand Planning with additional roles Production, Operational, TDG and Corporate Office EHS Officer at PT.PPG Indonesia
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Jakarta, Indonesia, ID

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Wholesale Building Materials
    • 700 & Above Employee
    • Demand Planning with additional roles Production, Operational, TDG and Corporate Office EHS Officer
      • Apr 2014 - Present

      • Planning and monitoring raw material for production • Planning for 5 segment of business unit of industrial coating: Protective Coatings, Marine Coatings, Wood, Coil Extruction and General Industries • Create production batch card, scheduling. • Interact with Oracle 11i and SAP for all jobs • Reporting operational matter to regional • Manage production to meet customer requirement and build stock • Ensure employee and environment at corporate office comply with EHS rules • Ensure PPG product comply with TDG (Transportation Dangerous Goods) rules Show less

    • United States
    • Paint, Coating, and Adhesive Manufacturing
    • 700 & Above Employee
      • Nov 2013 - Apr 2014

      • Arrange delivery schedule of warehouse• Controlling inventory in and out between 2 warehouse• Analyze inventory movement on every stock opname• Discuss with team for RA material and for the action in system• Planning and monitoring raw material for production• Planning for 3 segment of business unit of industrial coating: Wood, Coil Extruction and GI base on customer forecast• Manage production to meet customer requirement and build stock• Create production batch card, scheduling• Interact with Oracle 11i for all jobs Show less

      • Apr 2012 - Nov 2013

      • Handling customer for goods order• Create delivery docket and ensure it return to office for invoicing• Arrange delivery schedule of warehouse• Implement Export Control Compliance• Communicate with customer for invoicing and payment schedule monthly• Set AR Collection plan to Credit Team Asia Pacific and follow up • Communicate for offsetting with credit team Asia Pacific after received payment• Controlling inventory in and out between 2 warehouse• Analyze inventory movement on every stock opname• Prepare payment for some transaction for operational matter• Interact with Oracle 11i for all jobs Show less

      • May 2011 - Sep 2012

      • Handling customer for goods order• Create delivery docket and ensure it return to office for invoicing• Arrange delivery schedule of warehouse• Communicate with customer for invoicing and payment schedule monthly• Set AR Collection plan to Credit Team Asia Pacific and follow up • Communicate for offsetting with credit team Asia Pacific after received payment• Controlling inventory in and out between 2 warehouse• Analyze inventory movement on every stock opname• Discuss with team for RA material and for the action in system• Prepare payment for some transaction for operational matter• Planning and monitoring raw material for production• Planning for 3 segment of business unit of industrial coating: Wood, Coil Extruction and base on customer forecast• Manage production to meet customer requirement and build stock• Create production batch card base on system• Interact with Oracle 11i for all jobs Show less

    • Japan
    • Appliances, Electrical, and Electronics Manufacturing
    • 1 - 100 Employee
    • Part Production Planner
      • Feb 2011 - Apr 2011

      • Setup new software planning scheduling using Flexsche (Flexible Production Scheduler with ERP system basis) • Analysis inventory value daily and monthly • Arrange consumable material for shipment • Controlling and managing raw material • Manage planning and sales • Setup new software planning scheduling using Flexsche (Flexible Production Scheduler with ERP system basis) • Analysis inventory value daily and monthly • Arrange consumable material for shipment • Controlling and managing raw material • Manage planning and sales

    • United States
    • Appliances, Electrical, and Electronics Manufacturing
    • 700 & Above Employee
    • Planner and Warehouse
      • Aug 2004 - Jan 2011

      a. Planner, Sales and Warehouse Superintendent (July 2009 ~ January 2011) • Control part movement and inventory • Analysis inventory value daily and monthly • Analysis for aluminum usage and output • Arrange consumable material for shipment • Controlling and managing die-casting mold and budget • Manage planning and sales b. Improvement, Planning and Administration Head Section (14 March 2008 ~ July 2009) as Assistant Supervisor • Improve or make new system to make production run smoothly • Monitoring Parameter Setting for Die Cast Machine • Planning machine running as customer requirement • Handling administration and manpower arrangement • Support to make working instruction and procedure • Support as safety coordinator c. QA Senior Technician (1 July 2005 until March 2007) Responsibilities • Manage, lead and motive the team. • Finding solution and analyze the quality problem. • Make special CMM program for sorting dimension of on hold part • Hold internal quality meeting on quality matters. • Responsible to perform first article (FA) and raise first article report for new and modified parts. • Ensuring the team following QA procedure d. QA Technician (18 August 2004 – 30 June 2005) Responsibilities: • Ensuring the material is accepted following the requirement before production used. • Conduct the internal quality meeting on quality matters. • Do inspection using measurement gauge and CMM • Maintain and initiative to improve in process inspection system. Show less

    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • New Tooling Technician
      • Dec 2003 - Feb 2004

      a. Responsible to Engineering Supervisor. b. Finding the solution and analyze the engineering problem. c. Ensuring tooling made properly as customers technical drawing. d. Support tooling maintenance. a. Responsible to Engineering Supervisor. b. Finding the solution and analyze the engineering problem. c. Ensuring tooling made properly as customers technical drawing. d. Support tooling maintenance.

Education

  • Politeknik Negeri Semarang
    Diploma, Mechanical Engineering
    2000 - 2003

Community

You need to have a working account to view this content. Click here to join now