Amr Harb

Electrical Engineer at Arab Petroleum Pipelines Company
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Egypt, EG

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Egypt
    • Oil and Gas
    • 1 - 100 Employee
    • Electrical Engineer
      • Nov 2007 - Present

      1- Electrical & Cathodic protection engineer - Engineering Sector. (August 2017) Achievements: * Leading a team of electrical engineers to carry out the following activities: a- Supervision of all electrical installations (Tank farm, pumping stations and electrical substations). b- Review of all design basis and operation philosophy, drawings, Equipment’s Specifications and wiring diagrams. c- Inspection (pre-commissioning & commissioning activities) of the following: Medium voltage switch-gears. Low voltage switch-gears. (Ex & unclassified) Medium and low voltage Variable Frequency Drives. Transformers. Electrical heat tracing system. Diesel generators. Firefighting panels. Power factor correction panels (M.V). UPS & battery chargers. Cable trays. Medium and low voltage motors. (Ex & unclassified) Internal cathodic protection of tanks. External cathodic protection of tanks and pipelines. 2- Electrical Maintenance engineer. (November 2007 – July 2017) •Sidi Kerir Terminal . •Achievements: Perform all Maintenance Activities in accordance to Computerized Maintenance Management System Maximo such as : Preventive Maintenance (PM), Corrective Maintenance (EM), Condition Based Maintenance (CBM), Reliability Center Maintenance (RCM), Predictive Maintenance and Spare parts Availability & Control • Major overhaul Project performed a) Installation of 2 medium voltage variable speed drive for 2.5 MW induction motors. b) Commissioning and startup of electrical equipment and grounding system for six floating roof storage tank of capacity >110000 m3 c) Replacement of low voltage MCC switchgear 400V 3200A d) Replacement of low voltage MCC switchgear 400V 2500A e) Replacement of eight EX de IIB T4 400 V outdoor distribution panels f) Replacement of battery banks up to 1000 AH 110V for UPS and rectifiers g) Supervision of replacement of five 220KV Circuit breakers and 12 220kV Isolators in the main substation in Sidi Kerir terminal Show less

    • Business Consulting and Services
    • 700 & Above Employee
    • Project enginer
      • Aug 2006 - Oct 2007

      Project engineer for offshore projects Project engineer for offshore projects

    • Ireland
    • Oil and Gas
    • 700 & Above Employee
    • Service and testing Engineer
      • Nov 2005 - Jul 2006

      Service and testing engineer in Weatherford services Electric submersible pumps (ESP) Branch Tasks: -Complete installation of 2 wells onshore and other offshore with their surface equipment. -Troubleshooting more than 10 wells in red sea area and west desert in Egypt. - In the work shop : i) Testing more than 20 complete sets of down hole equipment and surface equipment. (Note: testing including running in testing well in the workshop ) ii) Inspection and cable repair of more than 60,000 ft of ESP MV cables Show less

Education

  • Arab Academy for Science, Technology and Maritime Transport
    Master of Business Administration - MBA, Business Administration and Management, General
    2012 - 2015
  • Arab Academy for Science, Technology and Maritime Transport
    post graduate diploma, Electrical and Electronics Engineering
  • Alexandria University
    2000 - 2005

Community

You need to have a working account to view this content. Click here to join now