Mohd Amizi Shah

Construction Interface Engineer & Migration at MMC-Gamuda (PDP SSP) | SSH Engineering Sdn Bhd at SSH Engineering Sdn Bhd
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
MY

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Malaysia
    • Truck Transportation
    • 1 - 100 Employee
    • Construction Interface Engineer & Migration at MMC-Gamuda (PDP SSP) | SSH Engineering Sdn Bhd
      • 2018 - Present

      SSH Engineering Sdn Bhd PROJECT 1: KVMRT PUTRAJAYA LINE (SUNGAI BULOH – PUTRAJAYA) As Supervisory Consultant at MMC-GAMUDA (PDP SSP) SDN BHD (Construction Interface & Migration Engineer): October 2018–Now Scope of Work: I was assigned as a Migration & Construction Interface for Migration Area and TRIP Phase 1 & 2 SSP Line and Underground. Migration Area: SUBD,KWDS, KASS, SUBS • Person in charge for Access planning permit and works schedule between Prasarana, Work Package Contractor and CRO for Operation Line KGL KVMRT. • Person In charge for Hour-by-Hour Programs for every Golden Possession until Final Golden Possession on Oct 2021. • Activities involves: Removing turnout rails and install permanent turnout rails for PYL Line, BLS Intertripping, Remove KGL switch machine and Install permanent switch machine for PYL line & Final Testing for Signalling, PA&PIDS, Radio, WDCS and PBDX Final Testing. TRIP Phase 1 & 2 SSP Line and Underground: • Responsible as construction interface for Phase 1 & Phase 2 TRIP – GoNoGo 750VDC • Responsible to monitor and supervise TRIP Phase 2 and Underground activities to maintain work standards, adhere to timelines and meet quality assurance targets. • Consolidate all planning and schedule for PHASE 1 TRIAL OPERATION SSP Putrajaya Line. • Person in charge to make sure all systems installation works completed before energization 750V DC. • Coordinate with Civil and System WPC for works on Trackside such as cable trough, cable hanger & cable pulling to BOH & inside station platform. • Part of Construction Railway Operation (CRO) for Work Train arrangement (planning) to allow all systems WPC do their installation and cable pulling at Trackside. Packages involved: Signalling (S&TCS), Trackwork, Power Supply & Distribution System (PS&DS), Communications (COMMS), Civil Package Team. Show less

    • Project Engineer
      • 2015 - 2018

      AFS ENGINEERING (MALAYSIA) SDN BHD PROJECT 1: KVMRT KAJANG LINE (SUNGAI BULOH – KAJANG) 2015 – 2018 Employment Duration: 3 years • System: Facilities SCADA (FSCADA) • Involves the MRT system at 37 stations. • 24 Elevator station, 7 Underground station & 6 Ancillary station Scope of Work: I was assigned to be Project Engineer (Installation Work) for FSCADA System who involved to handle Northern Station, Southern Station and Underground Station for KVMRT SBK Line. • Responsible to prepare schedule and planning activities for Sub- contractor, service team and equipment delivery. • Coordinate and install all panel equipment, base frame and all cable trunking inside/outside room • Coordinate and monitor cable tray installation works for cable routing and cable entry as per civil construction and cable routing drawing for FSCADA cables. • Person in charge to supervise for cable pulling & all cable termination for data/power cable inside cabinet. • Responsible to conduct testing for FAT, PICO, PAT and Installation testing. • In charge to prepare of documentation report for cable termination, PICO, RFI, Test Report & Method Statement PROJECT 2: TUDM DAMANSARA (EXTRA LOW VOLTAGE) Position: Project Engineer (September 2017) System : ELV system Building : 3 BLOCK Scope of Work: I was assigned to be Project Engineer for Installation, Testing & commissioning for Extra Low Voltage, Building Security & Audio Visual System. • Responsible to coordinate & prepare schedule and planning activities for Sub- contractor, service team and equipment delivery • Supervise and monitor progress of project, schedule of delivery equipment and status of dateline schedule. • Person in charge for all cable pulling for Data, Power & Fiber Optic cable for all equipment such as CCTV, Projector, SMATV cable, Speaker , Fireman Intercom, Card Reader & Electromagnetic Lock Door. • Supervise and coordinate for all installation cable tray, cabinet and panel equipment. Show less

    • Malaysia
    • Utilities
    • 700 & Above Employee
    • Internship Trainee
      • Jun 2014 - Sep 2014

      Position: Trainee (Control and Instrumentations) Duration: 9 June 2014 – 29 August 2014 Responsibilities : • Carry out instrumentation maintenance works of 8x100MW, Gas Turbine and 4x100MW Steam Turbine, Backup Diesel Engines auxiliaries • Responsible for equipment that used voltage less than 220Vdc which are Transmitter, control valves, switches, and sensors. Position: Trainee (Control and Instrumentations) Duration: 9 June 2014 – 29 August 2014 Responsibilities : • Carry out instrumentation maintenance works of 8x100MW, Gas Turbine and 4x100MW Steam Turbine, Backup Diesel Engines auxiliaries • Responsible for equipment that used voltage less than 220Vdc which are Transmitter, control valves, switches, and sensors.

    • Engineering Technician
      • May 2013 - Jul 2013

      Job Scope: • Install the ELV equipment • Do the wiring and termination Company Scope: Communication system for Offshore/Onshorre purposes. • Public Address System (PA) • CCTV Job Scope: • Install the ELV equipment • Do the wiring and termination Company Scope: Communication system for Offshore/Onshorre purposes. • Public Address System (PA) • CCTV

    • RIGGER/HELPER
      • Oct 2012 - Dec 2012

      Job Scope: - Produce the jacket for insulation - Painting & blasting pipe at Power Plant Company Scope: • Insulation for Hot & Cold • Industrial Blasting & Painting Job Scope: - Produce the jacket for insulation - Painting & blasting pipe at Power Plant Company Scope: • Insulation for Hot & Cold • Industrial Blasting & Painting

Education

  • Universiti Teknologi MARA
    Bachelor's degree, Electrical and Electronics Engineering
    2012 - 2015
  • Universiti Teknologi MARA
    Diploma of Education, Electrical and Electronics Engineering
  • Sekolah menengah teknik dungun
    Uitm shah alam, Electrical and Electronics Engineering

Community

You need to have a working account to view this content. Click here to join now