Amir Peydayesh

Project Manager / Senior Estimator at DBD | Design | Build | Develop
  • Claim this Profile
Contact Information
Location
AU
Languages
  • English Full professional proficiency
  • Farsi Native or bilingual proficiency

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Credentials

  • Professional Civil Engineer
    Engineers Australia
    May, 2017
    - Sep, 2024

Experience

    • Australia
    • Architecture and Planning
    • 1 - 100 Employee
    • Project Manager / Senior Estimator
      • Jan 2021 - Present

      • Coordinate internal resources and third parties/vendors for the flawless execution of multiple projects • Ensure that all projects are delivered on-time, within scope and within budget • Ensure resource availability and allocation • Develop a detailed project plan to monitor and track progress • Manage changes to the project scope, project schedule, and project costs using appropriate verification techniques • Manage the relationship with the client and trades/suppliers • Meet with clients to take detailed ordering briefs and clarify specific requirements of each project • Delegate project tasks based on junior staff members' individual strengths, skill sets, and experience levels • Meet budgetary objectives and make adjustments to project constraints based on financial analysis • Procurement, including raising purchase orders for materials & labor

    • Estimator/ Contract Administrator
      • Sep 2017 - Jan 2021

      • Analysing working drawings & specifications • Preparing estimates for D&C and ready design projects • Adhere to strict project timelines for submitting estimates considering stipulated prices • Preparing detailed BOQ (bill of quantities) for each project • Monitoring progress, requisition change orders and identify any potential risks • Ensure site personnel are provided with proper documentation related to project • Maintaining strong relationship with sub-contractors and clients • Providing and maintaining unit pricing and database for material and labor costing • Formulate cost break down from estimates and for project progress • Procurement, including raising purchase orders for materials & labor • Conducting site visits (including QC/QA controls) and checking nonconformities with drawings and specifications and submitting NCR’s if required

    • United States
    • Apparel & Fashion
    • Project Engineer
      • May 2017 - Sep 2017

      Project: Construction of main and subsiding water supply network including all infrastructure and facilities of over 4000 hectares in EPC form Key Responsibilities: • Analysed project documents (contract, scope of works, working drawings, etc) • Prepared & submitted CMS (Construction Method Statement) • Prepared & submitted ITP (Inspection & Test plan) • Determined the project time frame, scheduled construction works in logical steps and time • allocation required to meet the deadlines • Monitored progress throughout the construction process, compared actual status with the project schedule baseline and recommended preventive or corrective actions • prepared MTO, purchase orders for suppliers & sub-contractors • Cost estimate for the variations occurred during the project & submitted to the client with all supportive documents • Balanced cash flow of the project to assure budget is allocated properly to activities especially critical tasks • Prepared & submitted MDR (Manufacturer Data Report) • Prepared & submitted daily & weekly reports to client & main office

    • Iran
    • Civil Engineering
    • 1 - 100 Employee
    • Estimator/Project Engineer
      • May 2013 - May 2017

      Project: Construction of Iran Mall Shopping Center & Hotel Project (https://www.iranmall.com) Key Responsibilities: • Project planning and control, including setting up baselines and critical path • Tracked the progress of all activities and comparing them with their baseline values • Applied Risk Assessment procedure including identifying risks, qualitative and quantitative risk analysis, and planning/implementing risk responses • Controlling concrete and steel shop drawings • Prepared and delivered invoices to the client, based on the volume of completed works with considering variations occurred during the project • Developed project schedules and updated project plans for concurrent subprojects into MS-Project Server • Monitored progress throughout the construction process, compared actual status with the project schedule baseline and recommended preventive or corrective actions • Prepared and submitted CMS (Construction Method Statement), ITP (Inspection and Test Plan), MDR (Manufacturer Data Report) • MTO (Material Take-off) & Procurement including ordering materials & POs to subcontractors • Preparing dry & wet punchlist • Provided the clients with daily, weekly, and monthly status reports formatting

    • Project Engineer/Estimator
      • Aug 2012 - May 2013

      SADAF Building Project(Five-storey residential building) Responsibilities: • Prepared construction detailed drawings to simplify the construction specs for sub-contractors using AutoCAD • Estimated the construction costs including labour, machinery and material costs • Primarily was responsible for tendering processes, negotiating with suppliers, contractors and liaising with the client • Procurement including raising POs for materials & labor • Preparing BOQ • Provided progress claims, cost control and financial reports • Tracked, monitored and updated the project schedule and provided weekly reports. • Q/A & Q/C according to national standards and national building codes using relevant testing procedures • Check supplier’s & sub-contractor’s invoices • Preparing daily, weekly & monthly reports

    • Estimator/Designer
      • Dec 2010 - Aug 2012

      Kosar-Garmaz Water transmission line Azad Shahr Wastewater network 7th Tehran treatment plant Responsibilities • Studied the topography of construction sites by deploying software including ARC GIS and Civil3D. • Designed water transmission lines by means of WaterGems software. • Prepared working drawings for water pipelines and sewerage reticulation system using AutoCAD software. • Assisted project manager in pre-tender estimation phase (doing accurate TO, working out cost of resources including materials & labor) • Project planning/scheduling including tracking the schedule, monitoring the progress, extracting delays and their impact on the schedule & report to project manager

Education

  • University of Tabriz
    Bachelor's degree, Civil Engineering
    2005 - 2010

Community

You need to have a working account to view this content. Click here to join now