Amir Azam Khan
Electrical and Instrumentation Supervisor A at Ministry of Electricity and Water- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Ministry of Electricity and Water
-
Kuwait
-
Oil and Gas
-
700 & Above Employee
-
Electrical and Instrumentation Supervisor A
-
Aug 2022 - Present
-
-
-
ABB
-
Switzerland
-
Automation Machinery Manufacturing
-
700 & Above Employee
-
Maintenance Engineer
-
Jan 2018 - Nov 2022
-
-
Maintenance Engineer
-
Jan 2018 - Jul 2022
ABB 800xA SystemCheck System Alarm List. Solve reasons for alarm messages and acknowledge the messages. System Event List. Have a closer look at all messages and check in detail the reasons behind. Check System Status Viewer for error states, solve possible. Check if RNRP shows all Interface connections without any error messages. Unclear situations and acknowledge all components. Check if all 800xA services and redundancies are running in correct state. Afw Service Status viewer. Check history state. Check if history servers are in redundant mode and are synchronized. Check if history scanner services are up and running.Server & Workstation Visual Inspection Check for loose screws, plugs or connectors, unusual odour or discoloration, cracks, damage, deformation, or excessive rust, abnormal sound or vibration e.g. by fan, discoloration due to overheating, damaged surface of wires and cables and others. Check Disk LEDs for correct state. Check Front Panel Server Status. Shutdown and Clean Server and Workstations. Check if antivirus updates are imported correctly via central distribution. Check the Operator Workplace and observe if process values are alive. Check OPC logs. Collect and store the OPC logs by 800xA system diagnostic tools for unusual messages. Do this check on Servers CS0011 and CS0012.Controller AC 800MVisual Inspection Check for loose screws, plugs or connectors, unusual odour or discoloration, cracks, damage, deformation, or excessive rust. Check indicators. Yellow or red indicators or according to system messages should be maintained. Check Controller Redundancy Primary and Dual Light on controller. Exchange PM861 internal Battery if required. Check Controller Log files for unusual Error Messages.Controller IOs & Comm. Modules Visual Inspection Check for loose screws, plugs or connectors, unusual odour or discoloration, cracks, damage, Check indicators. Yellow or red indicators or according to system messages should be maintained. Show less
-
-
Site Supervisor
-
Jan 2013 - Dec 2017
• As Site Supervisor take care all site activities on side. Handling the testing activities of Power cables termination, energizing the low Voltage panels & MV Switchgear after conducting the proper pre commissioning checks for the start up.Medium Voltage 11KV Panels: Perform the tests in presence of the client and maintain cordial relation with them so as to understand the requirements of them and make necessary modifications if required on site.• Check-Lists preparation and submission to client; taking care of approvals,• Excellent working knowledge and understanding of inverters, battery unit and UPS systems. • Performing the Hi-Pot Test for the 11KV Power cables.• Testing of the interlocks between Upstream 11KV Switchgear to Downstream 11KV switchgear and 440V Switchgear.• Performing the Polarity test for the CT on 11KV & 440V Switchgear.• Verification of the various signals from the switchgear to DCS station.• Testing of Universal Motor Controllers.• Testing of Variable speed drives.• Testing & Commissioning 11 KV Model C175 Two set Caterpillar Generator. Daily tank & Weekly tank fuel system, Radiator coolant system & synchronization.• Testing & Commissioning Mocotech Soft Starter. Make necessary modifications. Calibration of temperature sensors for the soft starters.• Hand over all spare parts Electrical & instrumentation Control system MEW store.• Handling the operation of chemical chlorinators, evaporators, and NaoH Dilution units.• Operation & Maintenance of AC & DC UPS systems.• Installation extra pump motor production system all 8 pump commissioning & testing. Show less
-
-
Electrical Supervisor
-
Sep 2009 - Dec 2012
Doha East Power Station: Unit 2 Main, Turbine and Boiler Removal of Exiting Old system and installation of new ABB switchgear & Re glanding of exiting Cable and Termination Testing and Commissioning.Shuwaikh Power & Water Distillation: Station: C-Station- 3.3KV jeety Pump New ABB Switchgear Instlation Commissing & Testing.B-Station- Boiler-12B,12C,12D & Coomen Exiting old system Removing & Installation New ABB MCC Panels, Modification. Internal Wiring Testing & Commissing. Maintenance Of Transformer, Batteries, Inviters, UPS. Show less
-
-
-
Integral Service Company, Kuwait
-
Kuwait
-
Construction
-
100 - 200 Employee
-
Cable jointer
-
Jan 2006 - Jun 2009
• Supervision and execution of erection and commissioning of Electrical works based on specifications and detailed installation drawings for the following items: • Two 11/0.415kV 2MVA and one 500kVA power supply transformers • 11kV and 415V Switchgears and 415 V Bus Duct and LV MCCs Panels • 20KVA UPS and Battery banks • Earthing system including cad weld and neutral grounding resistor • Soft Starter Unit for HT motors • Laying and termination of HV, LV and Control cables up to size 630 sq mm • HV cable insulation resistance test and Hi pot test up to 30kv • Modification works in existing HV Switchgear • Cable Trays for Power and Control Cables • Industrial conduit work for Emergency and Exit lights • control panel for HV Diesel Generator • Change-over procedure of LV Distribution Switchgear and LV MCCs • MOVs, DCVs erection, testing and commissioning works • Installation of GPS and Fiber optic cable laying. • Erection and commissioning of electrical equipments in SF6 GIS. • Local control panels, protection panel, marshalling panel and coupling transformer relay panel, Disturbance Recorder and common Alarm panels. • Control and power cable laying and Termination Show less
-
-
-
Saudi Electricity Company
-
Saudi Arabia
-
Utilities
-
700 & Above Employee
-
Cable jointer
-
Mar 2003 - Oct 2005
• Termination and commissioning of M V & LV cables • Maintenance and operation of electrical motors, heaters, power press machine • Installation of power distribution board and LV control panels • Trouble shooting and rectification of electrical circuits • Operation and maintenance of industrial indoor and outdoor lighting system • Termination and commissioning of M V & LV cables • Maintenance and operation of electrical motors, heaters, power press machine • Installation of power distribution board and LV control panels • Trouble shooting and rectification of electrical circuits • Operation and maintenance of industrial indoor and outdoor lighting system
-
-
Education
-
Al kabir polytechnic
Diploma, Electrical Engineering