Aminul Alam

Construction Manager at Al Hassanain
  • Claim this Profile
Contact Information
Location
Bahrain, BH

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • Bahrain
    • Construction
    • 1 - 100 Employee
    • Construction Manager
      • Dec 2019 - Present
    • senior Engineer - Civil
      • Jan 2017 - Present
    • United Kingdom
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Inspector (Civil)
      • Jan 2013 - Jan 2017

      2013- Inspector (Civil) – Middle East Water and Environment Division, Abu Dhabi Current Projects/ Scope of works: 4613 Priority 2 – Water Station North This project comprises construction following 3 nos. 5 Mg capacity Ground Storage Tanks (GST)and 1 no. 1 Mg capacity Elevated Service Reservoir (ESR) at NBNT Distribution Station 1 no. 5 Mg capacity Reinforced Concrete Ground Storage Reservoir (GSR) and Pumping station along with necessary associated work at Seef Distribution Station. At other site 1 no. ESR along with necessary associated work 1 no. pump and associated works at Salmabad Forwarding Station 3 nos. (2D+1S) new pump (group II) and associated works at Buquwah Forwarding Station Installation of flow control valve, pressure relief valve and associated works at Seef Blending Station Internal Road works approx. 2 km 4614 – Water Stations Elevated Service Reservoirs The project comprises the construction and supervision for the following 1 no. 1.5 Mg capacity steel ESR and all associated appurtenances at West Riffa’a II Blending Station 1 no. 1.0 Mg capacity ESR, pipeline. chambers and all associated works at Hamala A Station 1 no. 1.0 Mg capacity ESR. Guard house, chlorine building, road work and all associated works at Hawrat A’Ali Distribution Station 1 no. 1.0 Mg capacity ESR, Guard house, chlorine building, road work, pipeline and all associated works at Arad Distribution Station 1 no. 1.0 Mg capacity ESR ,office building, pipeline and all associated works at Hoora Blending Station 1 no. 1.0 Mg capacity ESR ,pipeline, LV room and all associated works at Salmaniya Blending Station Internal Road works Show less

    • Norway
    • Architecture and Planning
    • 1 - 100 Employee
    • INSPECTOR (CIVIL)
      • 2013 - 2014

Education

  • American international university
    Bachelor's degree, Civil Engineering
    2007 - 2009

Community

You need to have a working account to view this content. Click here to join now