amin chohan

MEP Site Engineer at Nishat Hotels & Properties Limited
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Lahore District, Punjab, Pakistan, PK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Pakistan
    • Hospitality
    • 200 - 300 Employee
    • MEP Site Engineer
      • Dec 2014 - Present

      Site execution • Chiller Operation and Maintenance. • Supervising of all type of Chiller maintenance and pump work • Installed Refrigeration System for cooled storage • Pre-Commissioning cautions • Setting the parameters • Detailed study of the Scope of the Tender, Drawings • Mobilization of manpower equipment for execution of the project. • Coordination with all other services like Architectural & Electrical, etc. towards successful completion of project. • Participating in site meetings with client / consultant. • Floating Request for Inspection of installations to Consultant and rectifying if any snag works / comments. • Updating and verification of as built drawings. • Actively participating with third party during Testing and commissioning of Mechanical system. • Execute the Hydro Testing of completed piping. • HVAC (Heating, Ventilating and Air Conditioning):- Experienced in Central Plant, Package unit and Split Air-conditioning unit installation works, also comprising planning, scheduling, Co-coordinating with main Clients, contractors, Sub-contractors, interacting with consultants, Heat Load Estimation , Equipment selection, Duct Design & Sizing as per (ASHRAE, BS, SMACNA), CHW Pipe Design & Sizing (BS, ASHRAE), ESP Calculation, Pump Head Calculation, Workshop Drawing,Package Unit, Chillers, CHW Pumps, BMS Control and Control Valves etc. • Plumbing: Water Supply, Drainage and Storm water: - Workshop Drawing and material submittal Preparation, Pump Head calculations, Pump, water Heater and sanitary items selection, loading Unit Calculations & Pipe Sizing, Materials, Fittings and Valves quantity take off and Execution of Installation, Testing and Commissioning of Water Supply Pipeline, Drainage Pipe Line, Storm Water Pipeline, Water Tank, Water Heater, Booster Pump, Transfer Pump, Sump Pump and controls etc. • Fire Fighting: Sprinkler System Show less

  • Mecsol Pakistan
    • Lahore, Pakistan
    • Managing Engineer
      • Sep 2013 - 2014

      My greatest strength is consistency and greatest skills are problem solving of the chiller, Selection of the chiller, Installation, Operation and maintenance & Commissioning , Marketing: • Interaction with Clients and Consulting • Supervising of all type of Chiller maintenance works • Preparing quotations along with chiller selection • Got involved in work assigned to the design team. • Follow Up on inquiries. o Identifying target and potential customers. o Analyzing marketing trends and making appropriate recommendation to the higher management. o Tender negotiation. o Identification of the target and potential customer. o Carrying out self and competitor’s analysis. o Making customers familiar with the concept of “solution sales” instead of typical demand sales. o Preparation of sales report, sales forecast, and detail of upcoming projects. o Analyzing marketing and buying trends and making recommendations to the principals to do the needful. o Making invoice, offers and sending information to the customers. Show less

    • Retail Office Equipment
    • 1 - 100 Employee
    • Project Engineer
      • Jul 2012 - Sep 2013

      Making customers familiar with the concept of “solution sales” instead of typical demand sales. Calculation of the Building Load and selection of the suitable machine in economically, efficient in all respect.Cooling tower design and calculation according to machine. Prepared the presentation of the chiller and all other equipment. Making customers familiar with the concept of “solution sales” instead of typical demand sales. Calculation of the Building Load and selection of the suitable machine in economically, efficient in all respect.Cooling tower design and calculation according to machine. Prepared the presentation of the chiller and all other equipment.

    • Pakistan
    • Appliances, Electrical, and Electronics Manufacturing
    • 1 - 100 Employee
    • Project Engineer
      • Apr 2006 - Jun 2012

      • Interaction with Clients and Consulting • Supervising of all type of Chiller maintenance works • Got involved in work assigned to the design team. o Analyzing marketing trends and making appropriate recommendation to the higher management. o Tender negotiation. o Carrying out self and competitor’s analysis. o Analyzing marketing and buying trends and making recommendations to the principals to do the needful. • Interaction with Clients and Consulting • Supervising of all type of Chiller maintenance works • Got involved in work assigned to the design team. o Analyzing marketing trends and making appropriate recommendation to the higher management. o Tender negotiation. o Carrying out self and competitor’s analysis. o Analyzing marketing and buying trends and making recommendations to the principals to do the needful.

Education

  • University of Engineering and Technology, Lahore
    Bachelor of Technology - BTech, HVACR
    2009 - 2013

Community

You need to have a working account to view this content. Click here to join now