amgad shawky

Project Manager at ASGC
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
AE
Languages
  • English -
  • French -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • OSHA construction industry safety & health standards
    inventor

Experience

    • United Arab Emirates
    • Construction
    • 700 & Above Employee
    • Project Manager
      • Apr 2018 - Present

      Abu Dhabi sea world Guggunhim museum project Abu Dhabi sea world Guggunhim museum project

    • Egypt
    • Construction
    • 700 & Above Employee
    • Technical office Cheif engineer
      • Sep 2017 - Present

      Main Duties & responsibilities: - Review tender proposals, technical and financial documents. - Represent the firm at all necessary meetings and work sessions with the Design Team and Client to gather and disseminate Mechanical systems information on a project. - Manage & coordinate all technical matters related to Mechanical works (technical office & site). - Manage my staff for the tasks required. - Follow up and accelerate the activities of the sub-contractors to handover the project on the contracted end date. - Negotiate with suppliers and subcontractors to obtain optimum quality, cost & terms - Manage & coordinate all of the above responsibilities with the all project departments. - Develop overall mechanical project schedules, coordinating and integrating the Design Team’s efforts with construction schedules. - Review the cost estimates, value engineering, schedules, subcontractor qualifications and proposals with the P reconstruction Manager(s) prior to submission to Clients and Design Team. - Plan and prepare all needed resources and follow up with the related department for supplying the required resources on time. Any difficulty to be reported to Project Manager / Area Manager. - Prepare with my team on site the required technical material submittals.

  • ORASCOM Construction Industries (OCI)
    • Golden Dome Hotel (GDH) PROJECT-NASR CITY
    • team leader mechanical engineer
      • Feb 2014 - Present

      Project Description: The Project is consisting of 2 Basements including a parking for 715 car, Ground floor ,1st Floor, Mechanical Floor and 8 Typical Floors with total Built up area of 94,600 (fully finished) with MEP Project Value 483.5 M EGP  Mall: o 60 retail. o 2 food court o 2 cinema .  Hotel: o 296 Room o 32 suit o 16 royal suit o 2 ball rooms  Chalets o 20 day use chalets  Leisure & Service areas o 2 Floors Garage o Swimming Pool o Courts , Project Cooling Load 16,460 KW. Responsibilities:  Preparing HVAC , plumping networks , Swimming pools, fountains and firefightning shop drawings for all project including mechniacal rooms.  Preparing all Mech. and HVAC material submittal .  Preparing and Review monthly invoices for consultant and sub-contractors technically and financially.  Create the necessary method of statement.  Co-ordination between HVAC , plumping , firefightning Design dept. and porcurment dept and Quantity survey .  Co-ordination between HVAC & CSD to get best soluation.  Checking IFC drawings and send raise RFI to the engineer to clarify technical iusses.  General Technaical Studies.  Attending mechanical workshop design weekly meeting with the Client.  As Built Team leader for Redline/As Built Drawings.  Preparing Dcouments required for QCD File.  Preparing equipment schedule, tagging .  Review vibration isolation & seismic restraints calculations for all equipment. (Cooling tower,chiller,boiler,AHU,pumps,fans, fire pump , mechnical room)

    • Team leader mechanical engineer
      • Feb 2014 - Present

       Preparing HVAC , plumping networks , Swimming pools, fountains and firefightning shop drawings for all project including mechniacal rooms.  Preparing all Mech. and HVAC material submittal .  Preparing and Review monthly invoices for consultant and sub-contractors technically and financially.  Create the necessary method of statement.  Co-ordination between HVAC , plumping , firefightning Design dept. and porcurment dept and Quantity survey .  Co-ordination between HVAC & CSD to get best soluation.  Checking IFC drawings and send raise RFI to the engineer to clarify technical iusses.  General Technaical Studies.  Attending mechanical workshop design weekly meeting with the Client.  As Built Team leader for Redline/As Built Drawings.  Preparing Dcouments required for QCD File.  Preparing equipment schedule, tagging .  Review vibration isolation & seismic restraints calculations for all equipment. (Cooling tower,chiller,boiler,AHU,pumps,fans, fire pump , mechnical room)

    • Egypt
    • Construction
    • 700 & Above Employee
    • team leader mechanical engineer
      • Feb 2014 - Feb 2015

      Responsibilities:  Resbonsile for Create the design for Plumbing system.  HVAC & Coordination layouts for main Mechanical rooms .  External static pressure calculations for AHU's & Fan's.  Preparing all Mech. and HVAC material submittal Also Quantity survey, and make purchase orders.  External louver (weather louver) and acoustic louver Size's Required & fixation detail .  Strong coordination between electrical, civil and mechanical activities to Get the best progress and avoid any confusion...  Coordination between mechanical & BMS and smoke Mangment system.  Slove problems related to technical issue and submit proposal To be complying with (ASHRAE) Standards.

Education

  • Ain Shames University , Egypt .
    Bachelor’s Degree, Mechanical Power Engineering Department (2006)
    2001 - 2006

Community