amgad shawky
Project Manager at ASGC- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English -
-
French -
Topline Score
Bio
Credentials
-
OSHA construction industry safety & health standards
inventor
Experience
-
ASGC
-
United Arab Emirates
-
Construction
-
700 & Above Employee
-
Project Manager
-
Apr 2018 - Present
Abu Dhabi sea world Guggunhim museum project Abu Dhabi sea world Guggunhim museum project
-
-
-
Orascom Construction PLC
-
Egypt
-
Construction
-
700 & Above Employee
-
Technical office Cheif engineer
-
Sep 2017 - Present
Main Duties & responsibilities: - Review tender proposals, technical and financial documents. - Represent the firm at all necessary meetings and work sessions with the Design Team and Client to gather and disseminate Mechanical systems information on a project. - Manage & coordinate all technical matters related to Mechanical works (technical office & site). - Manage my staff for the tasks required. - Follow up and accelerate the activities of the sub-contractors to handover the project on the contracted end date. - Negotiate with suppliers and subcontractors to obtain optimum quality, cost & terms - Manage & coordinate all of the above responsibilities with the all project departments. - Develop overall mechanical project schedules, coordinating and integrating the Design Team’s efforts with construction schedules. - Review the cost estimates, value engineering, schedules, subcontractor qualifications and proposals with the P reconstruction Manager(s) prior to submission to Clients and Design Team. - Plan and prepare all needed resources and follow up with the related department for supplying the required resources on time. Any difficulty to be reported to Project Manager / Area Manager. - Prepare with my team on site the required technical material submittals.
-
-
-
ORASCOM Construction Industries (OCI)
-
Golden Dome Hotel (GDH) PROJECT-NASR CITY
-
team leader mechanical engineer
-
Feb 2014 - Present
Project Description: The Project is consisting of 2 Basements including a parking for 715 car, Ground floor ,1st Floor, Mechanical Floor and 8 Typical Floors with total Built up area of 94,600 (fully finished) with MEP Project Value 483.5 M EGP Mall: o 60 retail. o 2 food court o 2 cinema . Hotel: o 296 Room o 32 suit o 16 royal suit o 2 ball rooms Chalets o 20 day use chalets Leisure & Service areas o 2 Floors Garage o Swimming Pool o Courts , Project Cooling Load 16,460 KW. Responsibilities: Preparing HVAC , plumping networks , Swimming pools, fountains and firefightning shop drawings for all project including mechniacal rooms. Preparing all Mech. and HVAC material submittal . Preparing and Review monthly invoices for consultant and sub-contractors technically and financially. Create the necessary method of statement. Co-ordination between HVAC , plumping , firefightning Design dept. and porcurment dept and Quantity survey . Co-ordination between HVAC & CSD to get best soluation. Checking IFC drawings and send raise RFI to the engineer to clarify technical iusses. General Technaical Studies. Attending mechanical workshop design weekly meeting with the Client. As Built Team leader for Redline/As Built Drawings. Preparing Dcouments required for QCD File. Preparing equipment schedule, tagging . Review vibration isolation & seismic restraints calculations for all equipment. (Cooling tower,chiller,boiler,AHU,pumps,fans, fire pump , mechnical room)
-
-
-
-
Team leader mechanical engineer
-
Feb 2014 - Present
Preparing HVAC , plumping networks , Swimming pools, fountains and firefightning shop drawings for all project including mechniacal rooms. Preparing all Mech. and HVAC material submittal . Preparing and Review monthly invoices for consultant and sub-contractors technically and financially. Create the necessary method of statement. Co-ordination between HVAC , plumping , firefightning Design dept. and porcurment dept and Quantity survey . Co-ordination between HVAC & CSD to get best soluation. Checking IFC drawings and send raise RFI to the engineer to clarify technical iusses. General Technaical Studies. Attending mechanical workshop design weekly meeting with the Client. As Built Team leader for Redline/As Built Drawings. Preparing Dcouments required for QCD File. Preparing equipment schedule, tagging . Review vibration isolation & seismic restraints calculations for all equipment. (Cooling tower,chiller,boiler,AHU,pumps,fans, fire pump , mechnical room)
-
-
-
Orascom Construction PLC
-
Egypt
-
Construction
-
700 & Above Employee
-
team leader mechanical engineer
-
Feb 2014 - Feb 2015
Responsibilities: Resbonsile for Create the design for Plumbing system. HVAC & Coordination layouts for main Mechanical rooms . External static pressure calculations for AHU's & Fan's. Preparing all Mech. and HVAC material submittal Also Quantity survey, and make purchase orders. External louver (weather louver) and acoustic louver Size's Required & fixation detail . Strong coordination between electrical, civil and mechanical activities to Get the best progress and avoid any confusion... Coordination between mechanical & BMS and smoke Mangment system. Slove problems related to technical issue and submit proposal To be complying with (ASHRAE) Standards.
-
-
Education
-
Ain Shames University , Egypt .
Bachelor’s Degree, Mechanical Power Engineering Department (2006)