Ameer Muhammad Khan
Senior Manager Engineering Operations at Pharmatec Pakistan (Private) Limited- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Pharmatec Pakistan (Private) Limited
-
Pakistan
-
Pharmaceutical Manufacturing
-
200 - 300 Employee
-
Senior Manager Engineering Operations
-
Apr 2022 - Present
-
-
-
GASCO Engineering Pvt Ltd
-
Pakistan
-
Oil and Gas
-
200 - 300 Employee
-
Project Manager
-
Jun 2016 - Apr 2022
-
-
-
Descon Engineering Limited
-
Pakistan
-
Construction
-
700 & Above Employee
-
Site Manager
-
May 2014 - Jun 2016
Client: GASCOEngineering: NAMA Mott MacDonald (NMM)Project: HDD1 Project “Habshan Direct Depressurization” GASCO, Habshan, U.A.EScope: Scope includes installation of depressurization lines along with relevant civil, structural and E&I work in Habshan-0, 1 & 2 and tie in different units of Habshan-0, 1 & 2 in these lines in order to route depressurized gas to FEED gas & MP compressors
-
-
Lead Project Engineer
-
Sep 2011 - Apr 2014
Client: Borouge- Abu Dhabi Polymers CompanyEngineer & supervisor: TSJ, Joint Venture of Tecnimont & Samsung Project: Borouge-3 Project “Polyolefin’s Unit” Mechanical Works Package P3A. Ruwais Abu Dhabi (UAE)Scope: Scope includes construction of Polyolefin’s (PO) unit having a production capacity of 350,000 t/y low density polyethylene (LDPE) along with supported utilities.
-
-
Area Engineer
-
Sep 2009 - Sep 2011
Client: ELIXIER, Joint venture of Linde & ADNOC UAEEngineer & supervisor: Linde Engineering Middle East LLCProject: Elixier-2 Project “Air Separation Plant For Nitrogen Generation” Mirfa-1, Abu Dhabi (UAE)Scope: Scope includes construction of two trains of Air Separation unit having Nitrogen generation capacity of 660,000 Nm3/h at a pressure of 40bars along with supported utilities
-
-
Area Engineer
-
Mar 2009 - Sep 2009
Client: Ruwais Fertilizer Industries (FERTIL)Project:EPC Work for Urea DebottleneckingScope: Scope of work comprises of Modification in Existing Urea Plant; installation of 400 MTPD CO2 Recovery unit, 2500 MTPD granulation unit & required utilities to support the aforementioned additions and modification.
-
-
-
ABS Engineering Corporation (Pvt.) Limited
-
Pakistan
-
Construction
-
1 - 100 Employee
-
Area In Charge
-
Apr 2008 - Mar 2009
Client: Al-Tuwairqi Group of companiesProject: Tuwairqi Steel Mill Project “DRI Plant”, Karachi (Pakistan)Scope: Scope of includes construction of direct reduction iron plant having capacity of producing 1,000,000 tons of steel per year.
-
-
Area Planner
-
Apr 2007 - Mar 2008
Client: Century Paper and Board Mills Ltd.Project: PM-7 Project “Century Paper and Board Mills”, Lahore (Pakistan)Scope: Scope of includes construction of board mill capable of producing 130,000 M. Tons / annum of premium quality Coated Duplex Board in substance range 200 – 400 g /m 2
-
-
Education
-
NED University of Engineering and Technology
Bachelor of Engineering (B.E.), Industrial Engineering