Ameer Muhammad Khan

Senior Manager Engineering Operations at Pharmatec Pakistan (Private) Limited
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
United Arab Emirates, AE

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Pakistan
    • Pharmaceutical Manufacturing
    • 200 - 300 Employee
    • Senior Manager Engineering Operations
      • Apr 2022 - Present

    • Pakistan
    • Oil and Gas
    • 200 - 300 Employee
    • Project Manager
      • Jun 2016 - Apr 2022

    • Pakistan
    • Construction
    • 700 & Above Employee
    • Site Manager
      • May 2014 - Jun 2016

      Client: GASCOEngineering: NAMA Mott MacDonald (NMM)Project: HDD1 Project “Habshan Direct Depressurization” GASCO, Habshan, U.A.EScope: Scope includes installation of depressurization lines along with relevant civil, structural and E&I work in Habshan-0, 1 & 2 and tie in different units of Habshan-0, 1 & 2 in these lines in order to route depressurized gas to FEED gas & MP compressors

    • Lead Project Engineer
      • Sep 2011 - Apr 2014

      Client: Borouge- Abu Dhabi Polymers CompanyEngineer & supervisor: TSJ, Joint Venture of Tecnimont & Samsung Project: Borouge-3 Project “Polyolefin’s Unit” Mechanical Works Package P3A. Ruwais Abu Dhabi (UAE)Scope: Scope includes construction of Polyolefin’s (PO) unit having a production capacity of 350,000 t/y low density polyethylene (LDPE) along with supported utilities.

    • Area Engineer
      • Sep 2009 - Sep 2011

      Client: ELIXIER, Joint venture of Linde & ADNOC UAEEngineer & supervisor: Linde Engineering Middle East LLCProject: Elixier-2 Project “Air Separation Plant For Nitrogen Generation” Mirfa-1, Abu Dhabi (UAE)Scope: Scope includes construction of two trains of Air Separation unit having Nitrogen generation capacity of 660,000 Nm3/h at a pressure of 40bars along with supported utilities

    • Area Engineer
      • Mar 2009 - Sep 2009

      Client: Ruwais Fertilizer Industries (FERTIL)Project:EPC Work for Urea DebottleneckingScope: Scope of work comprises of Modification in Existing Urea Plant; installation of 400 MTPD CO2 Recovery unit, 2500 MTPD granulation unit & required utilities to support the aforementioned additions and modification.

    • Pakistan
    • Construction
    • 1 - 100 Employee
    • Area In Charge
      • Apr 2008 - Mar 2009

      Client: Al-Tuwairqi Group of companiesProject: Tuwairqi Steel Mill Project “DRI Plant”, Karachi (Pakistan)Scope: Scope of includes construction of direct reduction iron plant having capacity of producing 1,000,000 tons of steel per year.

    • Area Planner
      • Apr 2007 - Mar 2008

      Client: Century Paper and Board Mills Ltd.Project: PM-7 Project “Century Paper and Board Mills”, Lahore (Pakistan)Scope: Scope of includes construction of board mill capable of producing 130,000 M. Tons / annum of premium quality Coated Duplex Board in substance range 200 – 400 g /m 2

Education

  • NED University of Engineering and Technology
    Bachelor of Engineering (B.E.), Industrial Engineering
    2002 - 2006

Community

You need to have a working account to view this content. Click here to join now