Amando IV Reyes

Project Lead - Front-End Engineering Design at Silangan Mindanao Mining Co. Inc.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Metro Manila, National Capital Region, Philippines, PH
Languages
  • English -
  • Tagalog -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Project Lead - Front-End Engineering Design
      • Oct 2021 - Present

      Planning and leading the technical study team to implement and realize results of the definitive feasibility study. Works with external consultants to enhance project design and execution. Planning and leading the technical study team to implement and realize results of the definitive feasibility study. Works with external consultants to enhance project design and execution.

  • Silangan Mindanao Mining Co., Inc.
    • Mandaluyong City, Philippines
    • Technical Study Team - Mining Engineer
      • Jan 2013 - Oct 2021

      – Manages a team of young mining engineers – Coordinates with lead consultants on the progress of the feasibility study – Liaises with government personnel in the conduct of securing the necessary government requirements for the project to operate – Prepares the board presentation materials – Safety officer and Business Continuity Plan lead in the head office – Manages a team of young mining engineers – Coordinates with lead consultants on the progress of the feasibility study – Liaises with government personnel in the conduct of securing the necessary government requirements for the project to operate – Prepares the board presentation materials – Safety officer and Business Continuity Plan lead in the head office

    • Philippines
    • Mining
    • 300 - 400 Employee
    • Corporate Engineering - Mining Engineer
      • Jan 2012 - Jan 2013

      – Headed technical team of mine valuation for acquiring mining projects – Member of Adhoc Engineering Team in addressing Padcal TSF 3 accident – Headed technical team of mine valuation for acquiring mining projects – Member of Adhoc Engineering Team in addressing Padcal TSF 3 accident

    • Technical Assistant
      • Aug 2010 - Jan 2012

      – Submits Technical Reports pertinent to PMDC Operations as required by the President. – Visits mine sites and assists site personnel in handling technical concerns in mining. – Submits Technical Reports pertinent to PMDC Operations as required by the President. – Visits mine sites and assists site personnel in handling technical concerns in mining.

    • Philippines
    • Mining
    • 100 - 200 Employee
    • Technical Assistant to the VPO
      • Feb 2010 - Jul 2010

      – Submits Technical Reports pertinent to Nickel Operations as required by the VPO and perform duties deemed necessary for the progress of the project. – Submits Technical Reports pertinent to Nickel Operations as required by the VPO and perform duties deemed necessary for the progress of the project.

    • United States
    • Equipment Rental Services
    • 200 - 300 Employee
    • Project Manager
      • Apr 2007 - Feb 2010

      Project Manager – RCC Bulacan Project (September 2009 to February 12, 2010) – Ensures the safe and smooth limestone quarry operations from drilling and blasting activity to crusher delivery. – Improved Grade Control System – Plans and designs pit slice based on annual mine plan. Page2 Project Manager – RCC Teresa Project (July 2008 to September 2009) – Ensures the safe and smooth limestone quarry operations from drilling and blasting activity to crusher delivery. – Established Grade Control System – Plans and designs pit slice based on annual mine plan. Project Engineer – BAAC Project (April 2007 to June 2008) – Helped settle unpaid billings approximately PhP40M. – Recovered PhP2.5M in Volume Survey reconciliation. – Systematized computations of Quarry Materials movements. – OIC in the last four months. Show less

    • Philippines
    • Mining
    • 300 - 400 Employee
    • Ore Extraction Engineer / Draw Control Engineer
      • Jul 2006 - Dec 2006

      – Forecasts production and implements Draw Point plans and procedures in block caving – Monitors ore grades and supervises ore sampling. – Commissions and decommissions production lines based on cut-off grades. – Computes per-shift production and makes Daily Production Reports submitted directly to the VPO for daily line-ups – Forecasts production and implements Draw Point plans and procedures in block caving – Monitors ore grades and supervises ore sampling. – Commissions and decommissions production lines based on cut-off grades. – Computes per-shift production and makes Daily Production Reports submitted directly to the VPO for daily line-ups

    • Supervisor - Mine Operations
      • Feb 2006 - May 2006

      - Supervises the quarry operations and engineering. - Enforces safety. - Supervises the quarry operations and engineering. - Enforces safety.

  • Monark Constructors Corporation
    • Teresa, Rizal, Philippines
    • Quarry Supervisor
      • Nov 2005 - Feb 2006

      - Supervises the quarry operations and engineering. - Enforces safety - Supervises the quarry operations and engineering. - Enforces safety

Education

  • University of the Philippines
    Bachelor’s Degree, Mining Engineering
    1997 - 2005

Community

You need to have a working account to view this content. Click here to join now