Amal Chand

Project Engineer - DESIGN, BUILD, OPERATE AND MAINTAIN OF MUSAIMEER PUMPING STATION AND OUTFALL at PORR QATAR CONSTRUCTION
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Doha, Qatar, QA
Languages
  • English Full professional proficiency
  • Hindi Professional working proficiency
  • Malayalam Native or bilingual proficiency
  • Tamil Professional working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Alexios K.

Mr Amal, myself and team worked together for 4 years in a key project in Doha(MPSO -pumping station and 10 Km tunnel delivering 20m3/sec of surface and underground water in the seabed. He is competent in achieving tasks, has very good technical background, understands the requirements set in management meetings and commits himself in achieving results. He showed excellent coordination with design department and participated actively in proposing construction methods to improve and succeed in time and cost savings. He could be a value to any project as he relies on his strength, adapts fast to the project specific requirements and prioritize commitment to his tasks.

LinkedIn User

Extremely efficient is the phrase that comes to mind when I think about Amal Chand. I have had the pleasure of working with Amal for about many years at the AUCC QATAR , collaborating on several projects & teams across Qatar. His ability to juggle multiple projects is unlike any I’ve seen before and makes a dramatic difference in the productivity level of our team. As a team member or a leader, Amal earns my highest recommendation.

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • UPDA/MMUP
    Ministry of Municipality and Environment, Qatar
    Jun, 2021
    - Nov, 2024
  • APPOINTED PERSON - LIFTING OPERATION
    TÜV SÜD
    Jun, 2019
    - Nov, 2024
  • Confined Space Entry
    DISS
    Feb, 2019
    - Nov, 2024
  • CCRM (Construction Commissioning and Rail Management) Level III - Work Party Supervisor
    Mitsubishi Heavy Industries
    Dec, 2017
    - Nov, 2024
  • CCRM (Construction Commissioning and Rail Management) Level II
    Mitsubishi Heavy Industries
    Nov, 2017
    - Nov, 2024
  • CRO (Construction Railway Operation) Level III (Person in Charge)
    Mitsubishi Heavy Industries
    Jun, 2017
    - Nov, 2024
  • CRO (Construction Railway Operation ) Level I
    Mitsubishi Heavy Industries
    May, 2017
    - Nov, 2024
  • Engineer- A grade
    Government of Kerala
    Mar, 2016
    - Nov, 2024

Experience

    • Qatar
    • Construction
    • 1 - 100 Employee
    • Project Engineer - DESIGN, BUILD, OPERATE AND MAINTAIN OF MUSAIMEER PUMPING STATION AND OUTFALL
      • Feb 2019 - Present

      The construction of pumping station with 10 pumps and auxiliary facilities. The pumping station will be located at the end of Mesaimeer Tunnel south of Hamad International Airport. The project also includes the construction of a 10-kilometer tunnel with a 3.7 meters diameter. The pumping station will operate at a capacity of 19.7 cubic meters per second, its function is to pump water from Mesaimeer TunnelResponsibilities:• Mobilization and Initial site arrangements. Setting up of temporary site offices and site facilities.• Utility diversion.• Jet grouting and dewatering well establishment.• Excavation and lining of shafts -38m below ground for TBM launch and logistics.• NATM tunnel for TBM launch• Excavation and lining for pumping station in 25 m radius and 38 m depth.• Seepage water management• Water proofing with Sika along the shotcrete wall.• Reinforcement for 2m raft slab and 2m wide walls.• Shuttering with Doka systems, large area form work Doka Top50, Load bearing platforms Doka D3, Dam Formwork D22, Climbing formwork Doka MF240.• Reinforcement and casting of 22m wall with Doka Top 50 and Doka D3 in 3 stages.• Reinforcement and casting of 36 m and 40m wall with Doka D22 and MF 240 systems respectively.• Precast beam and slabs logistics and placement.• Blockworks and plastering in accordance with QCS 2014• Backfilling• Wet and dry Utilities• Construction and Pavement and side walks• Construction of permanent Asphalt Road• Understanding the design and design reports and executing the excavation and structural works ensuring Quality and Safety.• Preparing working drawings.• Preparing Method statements• Preparing Field change reports.• Planning the works and executing in safe way meeting quality requirements.• Overseeing all General and structural works.• Training subordinates to get familiar with the design and drawings.

    • Civil Engineer
      • Oct 2016 - Jan 2019

      Completed Tunnel invert, Station infill and HMSS project in Doha Metro, Completed Primary containment installation for Thales in Doha Metro. Now in Meseimeer Pumping station and Outfall (MPSO) project.Duties and Responsibilities- Reporting the day to day productions to the Construction manager.- Allocating manpower and responsibilities.- Ensuring SAFETY and QUALITY.- Attending Inspection sessions with PMC.

    • Project Engineer
      • Sep 2014 - Sep 2016

      Responsible for a multidiscipline design team embedded within a project, supporting both front end design and onsite installation and commissioning. Also in charge of day to day allocation and supervision of work including contract technical specifications and their implementation as well as promoting the highest standards of safety onsite all times.Duties- Reporting on contract progress and advising on actions needed to keep to the agreed programme.- Allocating roles, responsibilities and production activities within the team.- Providing mentoring and encouragement to others to help them achieve their maximum level of performance.- Dealing with internal and client technical queries and requests.- Producing calculations and drawings.- Attending public meetings.

    • Site Engineer
      • Jul 2013 - Aug 2014

      -Responsible for planning and day to day allocation of works- Allocation of works and helping the workers and colleagues to achieve the goals- Estimation of materials and labors.-Attending meetings with Structural Consultants-Ensuring Quality and Safety-Handling interfaces -Responsible for planning and day to day allocation of works- Allocation of works and helping the workers and colleagues to achieve the goals- Estimation of materials and labors.-Attending meetings with Structural Consultants-Ensuring Quality and Safety-Handling interfaces

    • Designer
      • May 2013 - Jul 2013

      Responsible for the design and execution of structures. Allocation of works and ensuring maximum output of design teams and the workers. Multitasking and frequent visit on several sites in a day. Responsible for the design and execution of structures. Allocation of works and ensuring maximum output of design teams and the workers. Multitasking and frequent visit on several sites in a day.

    • Jr. Architect (Part-time)
      • Sep 2007 - Apr 2009

      Responsible for all the architectural and structural designs. Responsible for all the architectural and structural designs.

Education

  • Annamalai University
    Bachelor's degree, Civil Engineering
    2009 - 2013
  • University of Kerala
    Diploma, Architecture
    2004 - 2007

Community

You need to have a working account to view this content. Click here to join now