Amaia Aldalur Izuzquiza

Key Account Manager at Softeca
  • Claim this Profile
Contact Information
Location
Burgos, Castilla and Leon, Spain, ES

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Spain
    • IT Services and IT Consulting
    • 1 - 100 Employee
    • Key Account Manager
      • Mar 2023 - Present
    • Switzerland
    • Machinery Manufacturing
    • 700 & Above Employee
    • Project Manager
      • Mar 2017 - Feb 2023

      Responsible for managing pumping solutions for water, oil and gas, power, chemicals and most industrial segments, prime contribution within this role is to • Manage project planning ensuring on time delivery meeting quality requirements and Lead-time • Coordinate different departments (engineering, procurement, production, logistics, etc) involved in the project • Monthly reports on project status to Management and customer • Lead weekly meetings with Procurement, Production and Engineering to prioritise work and review pending issues • Establish and reinforce positive relationship both with supplier and customer ensuring proposed solutions meet customer’s expectations Show less

    • United Kingdom
    • Utilities
    • 700 & Above Employee
    • Senior Planner
      • Mar 2014 - Oct 2016

      Research Sites Restoration Ltd and Magnox Ltd merged to form a single organization 1st April 2015. Responsible for planning the Decommissioning and Close-Out of Harwell Site Critical Path projects, prime contribution within this role is to - Provide a project controls support to Project Managers, encompassing planning and scheduling in compliance with relevant company procedures. - Lead business assurance in the area of planning & scheduling to ensure robustness, credibility and compliance - Assist Project Managers in conducting interactive planning sessions, capturing output to form the basis of project plans. Review float erosion, perform Critical Path analysis and provide PM status on perceived likelihood of delivering a portfolio of more than £200M - Ensure regular review of the project trend and issue logs. Preparation of project Baseline Change Proposals and supporting information - Ensure schedule contingencies and mitigation activities are identified following risk analysis - Conduct full and detailed Earned Value analysis and subsequent root cause analysis, followed by provision of narrative, recommendations & recovery plans Show less

    • Maintenance Planner
      • Apr 2013 - Mar 2014

      Future Strategic Tanker Aircraft (FSTA) Programme, prime contribution within this role is to - Liaise with customer and supplier in order to ensure aircrafts are maintained and available to meet the RAF air-to-air refuelling capability programme - Develop and provide bespoke weekly reports on project status meeting internal and client reporting requirements such as Earned Value, risk, manning, cost and progress reports - Chair and ensure planning meetings are held to discuss each input and associated workload with all the departments concerned - Tracking manpower productivity and analysing time booked to projects including resource usage vs. planned, resource constraints, etc. and make any relevant recommendations to the Project Manager - Collate performance data for use within management reporting Show less

    • United Kingdom
    • Defense and Space Manufacturing
    • 700 & Above Employee
    • Senior Production Controller
      • Jul 2011 - Apr 2013

      Plan, track and champion the conversion of the wings and centre tank for two standard Airbus A330 into a military multirole tanker transport (MRTT) with an air-to-air refuelling capability for the Voyager Programme - Developed logic linked project schedules providing planning support to Production Managers ensuring availability of personnel, material, equipment, data and facilities to support work activities for a £400M project - Performed critical path analysis and advised the Production Managers of possible actions and/or needed adjustments to daily work activities - Organised and scheduled the issue of work packages ensuring tasks are in the most efficient and productive manner. Controlled work packages issued to Engineers maintaining records of all work cards issued and returned. Ensured all work packs are completed and certified correctly - Provided regular reports on project status meeting internal and client reporting requirements - Responsible for leading and directing a team of 8 FTEs Show less

    • Mexico
    • Software Development
    • Planning Engineer
      • Feb 2010 - Jul 2011

      Plan, track and lead the conversion of the wings and centre tank for three standard Airbus A330 into a military multirole tanker transport (MRTT) with an air-to-air refuelling capability for the UAE Programme, responsible for leading and directing a team of 3 FTEs - Coordinated schedule input from Engineering, Production and suppliers to develop an integrated master schedule for a £450M project - Developed project monitoring processes, such as KPI´s, Earn Value and resource profile based upon planning best practice - Managed the supply of parts liaising with supplier and provided weekly reports regarding component supply status Show less

    • Project Engineer
      • Jun 2009 - Dec 2009

      First experience of operating within an internal design consultancy role, delivered a “Design a Factory” project investigating and analysis defining construction elements in order to maximise the effective materialisation and execution of industrial construction. The project covered: - Identify location and study ground, relevant to envisage usage - Translate usage in production layout - Advise on material to be used, office design, security, workstations plus full unit costing/drawing supplied Show less

Education

  • Universidad de Navarra
    Master's degree, Industrial Engineering
    2001 - 2007
  • Universidad de Navarra / University of Navarra
    Master's degree, Engineering Management
    2007 - 2009
  • Universidad de Burgos
    Master's degree, Enoturismo
    2016 - 2017

Community

You need to have a working account to view this content. Click here to join now