Alyssa Edwards

Associate at Pritchard Francis
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Greater Perth Area, AU

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Dare to Lead Trained
    Dare to Lead™ Trained
    Oct, 2022
    - Nov, 2024

Experience

    • Australia
    • Civil Engineering
    • 1 - 100 Employee
    • Associate
      • Jul 2019 - Present

      Associate - 2021 - Current Byford Rail Extension - Non-Rail Infrastructure Design Manager - 2022 - Current Project Engineer - 2019 - 2021 Prichard Francis is a leading civil and structural engineering consultancy, with offices in Perth, Broome and Darwin. Responsibilities Include: - Asset auditing, including MRWA Level 1 and 2 inspections on various MRWA and LGA assets, apartments buildings, commercial building and other structures. This includes inspection, assessment and load rating of existing structures, and working with Clients, and other stakeholders, to determine safe and cost effective solutions. - Superintendent Services, including construction support, invoicing, stakeholder management, project management and assessment of variations - Bridge Design Services including tender, concept, 15%, 85%, IFC and IV design for road and pedestrian bridges. - Structural/Building design service including tender, concept, 15%, 85% and IFC for a variety of structural projects including hotels, tanks, culverts, building modifications and mining assets. - Multidisciplinary Tender Design, including Yanchep-Thornlie Rail Extension and Byford Rail Extension - Project management, including forecasting, invoicing, client relations, stakeholder management and resourcing. - Tendering. Show less

  • AECOM
    • Perth, Australia
    • Bridge Engineer
      • Jul 2015 - Jun 2019

      AECOM is a multinational firm, which provides design, consulting and management services to its clients. I worked within the Bridge Team. Projects Include – • Bridge Design Services Package (Main Roads WA) • Refuelling Shed Upgrade – RAAF Base Learmonth and HMAS Stirling – Construction Support and Supervision Services (DOD/Duratec) • Seconded to MRWA Structures Team • Priority Bridge Project and Heavy Vehicle Road Assessment (TMR) • Cultana Lincoln Highway Road Bridge Design (DOD) Responsibilities Included - • Inspection of existing timber, steel and concrete bridges • Load rating of existing timber and concrete bridges using TIMBAR, Spacegas, Strand7 and Autodesk Structural Bridge Design • Design of structural repairs as required • Design of bridges, or bridge replacements, including plank and Troff bridge, and culvert structures • Construction support services, including hold point sign off, RFI responses, and liaison with construction teams • Updating of existing spreadsheets to fix bugs and allow for various travel restrictions and vehicle loadings, including the writing of macros to automate the processes. Show less

    • Australia
    • Construction
    • 700 & Above Employee
    • Site Engineer
      • Jan 2013 - Jul 2015

      After completing my Bachelor of Engineering (Civil/Construction) in November 2012, I entered into the Leighton Contractors Graduate Program. The Graduate program allows for the opportunity to rotate to four different projects or business areas over a 2 year period, to ensure graduate obtain a variety of experiences. Rotation 4 – Gateway Alliance, Structures Team August 2014 – July 2015 Rotation 3 – Gorgon Civils and Underground (BWI), L4 and Planning Team February 2014 - August 2014 Rotation 2 – Gorgon Civils and Underground (Mainland), Precast Stormwater Drainage Team August 2013 – February 2014 Rotation 1 – Gorgon Civils and Underground (Mainland), Piping Prespooling Team February 2013 - August 2013 Responsibilities Include - • Manage the construction of Underpass 9389 and 9412 including understanding design documents, management of subcontractors, participation of QA inspections, management of budgets and L5 schedules and, compiling and submission of QA documentation • Working within Primavera (P6) to identify milestone works and completion dates, including introducing lags to activities, assigning predecessors and successors, creating new activities and assigning activities to project teams. • Participating in daily pre/post pour inspections to inspect and Sign off precast units for Quality and Logistical Release of 10,000 storm water drain units • Effectively communicated with Subcontractor to ensure product was delivered on time, and to a high quality, in relation to Australian and Project Standards. Liaised with Client, as required, resolving any issues with delivery or quality. • Reviewed and Compiled MDR documentation for submission (Quarantine documents, RLMs ect), in both hard and soft copy Show less

Education

  • Curtin University
    Bachelor’s Degree, Engineering
    2008 - 2012

Community

You need to have a working account to view this content. Click here to join now