Alvin Susanto
Pipeline Welding Operator Automatic Machine Double Tocrh at Global Petroprojects Services AG- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Global Petroprojects Services AG
-
Switzerland
-
Human Resources Services
-
100 - 200 Employee
-
Pipeline Welding Operator Automatic Machine Double Tocrh
-
Dec 2018 - Present
SWS expert in single and double torch automatic welding. SAW and Internal pipe welding mechanism. SWS expert in single and double torch automatic welding. SAW and Internal pipe welding mechanism.
-
-
-
aramco
-
Saudi Arabia
-
Oil and Gas
-
700 & Above Employee
-
-
Apr 2023 - May 2023
LTA 63
-
-
-
Dec 2022 - Mar 2023
First Cladding project for saudi with Saipem Endeavour, we scratch from zero build the clad weld system that can suistance for long term project and we did it 2 cald pipeline was smoth and good quality of weld so we awarded in 2023 for 100KM clad line
-
-
-
Qatargas
-
Qatar
-
Oil and Gas
-
700 & Above Employee
-
EPC for North Field Production Sustainability Offshore & Pipeline Project
-
Jun 2022 - Oct 2022
This Qatar Gas Project was very strict with weld defect, and come with new system that we must maintaince for pipe heat before weld even when in weld progress if pipe heat reader hit below 105 degree all weld machine will shutdown and can be start when minimun heat requirement achived, and then with great team work and alot of experice so can done the best production in one day we achieve 110 joint 32”. This Qatar Gas Project was very strict with weld defect, and come with new system that we must maintaince for pipe heat before weld even when in weld progress if pipe heat reader hit below 105 degree all weld machine will shutdown and can be start when minimun heat requirement achived, and then with great team work and alot of experice so can done the best production in one day we achieve 110 joint 32”.
-
-
-
Saipem
-
Italy
-
Engineering Services
-
700 & Above Employee
-
Baltic Pipe Project
-
May 2021 - Aug 2021
Baltic Pipe Project was doing well done by castorone with 36” 20mm thicknes pipe we can produce 89joint in 12 hour is the best production we can do in 1 sift that delivery 144km pipeline in almost 6 week. Baltic Pipe Project was doing well done by castorone with 36” 20mm thicknes pipe we can produce 89joint in 12 hour is the best production we can do in 1 sift that delivery 144km pipeline in almost 6 week.
-
-
-
Saipem
-
Italy
-
Engineering Services
-
700 & Above Employee
-
Alen Gas Monetization Project
-
Sep 2020 - Dec 2020
This is my last project on end of 2020 that make us getting very carefuly when mobilitation because of pandemic corona virus 2019 or local pirates even malaria in the beach pool area, but i work with the best company that make our travel and working area safety and sound, starting location project at Equatorial Guinea the project was smooth and perfectly fast laying pipe that make us finished before the schedule. This is my last project on end of 2020 that make us getting very carefuly when mobilitation because of pandemic corona virus 2019 or local pirates even malaria in the beach pool area, but i work with the best company that make our travel and working area safety and sound, starting location project at Equatorial Guinea the project was smooth and perfectly fast laying pipe that make us finished before the schedule.
-
-
-
Saipem
-
Italy
-
Engineering Services
-
700 & Above Employee
-
-
Dec 2018 - Jun 2019
This my first project in end of 2019 and early of 2020 that is make us work with extra time and extra effort wich is we fought with nature that adriatic ocean is very unpredictable that wave, wind come as often as they like, we have out of due date for finished this project but with this delay make us work more experianced, the client is stastified with the result after finished the tie in.
-
-
-
Dec 2018 - May 2019
Zohr Project was my first experiace in Saipem with Automatic SWSe Double Torch Machine, that tought me a tons of knowlage that’s make me become a profesional automatic double torch welder, thanks to the crew castorone, castorosei and to all my teammate that make Zohr project succesful finished with good result.
-
-
-
Saipem
-
Italy
-
Engineering Services
-
700 & Above Employee
-
Welder
-
Dec 2015 - Jun 2016
Starting become manual welder coded ASMI IX i’m quallified for Carbon Steel, Stainless Steel, Cupro Nickle, with GTAW and SMAW Process. My finished project was Jangkring Project and Kaombo Project with smooth and successful installed to the location. Starting become manual welder coded ASMI IX i’m quallified for Carbon Steel, Stainless Steel, Cupro Nickle, with GTAW and SMAW Process. My finished project was Jangkring Project and Kaombo Project with smooth and successful installed to the location.
-
-
-
pt encona inti industri
-
Civil Engineering
-
1 - 100 Employee
-
Welder GTAW 6G
-
Jan 2015 - May 2015
LOBP Shell Monas Project, we made a firefighting pipeline with ASME Sec IX standard and 10% Radiography Test, 99% joint pipeline welding with GTAW process. LOBP Shell Monas Project, we made a firefighting pipeline with ASME Sec IX standard and 10% Radiography Test, 99% joint pipeline welding with GTAW process.
-
-
-
Lioe Fabricator
-
Sunter Kemayoran, Jakarta Utara, Indonesia
-
Welder
-
Jan 2014 - Aug 2014
Fabricating construction with tubing and square tubing all process with SMAW in all position. Fabricating construction with tubing and square tubing all process with SMAW in all position.
-
-
Education
-
PPKKPL Condet
SMAW 6G Up & Down Hill, Welding -
PPKKPL Condet
GTAW 6G, Welding -
Universitas Tarumanagara (Untar)
Bachelor's Degree, Business/Managerial Economics -
Paskalis High School
High School, Economy