Alpesh Chavda

GAIL Surveillance - Lead Sr. Inspection Engineer at SGS
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Bhuj, Gujarat, India, IN
Languages
  • Gujarati -
  • Hindi -
  • English -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  •  Certified Welding Inspector ( CWI ) Course Completed
    -
    Jan, 2009
    - Nov, 2024
  •  ASNT - Level – II in Ultrasonic Testing, Radiography Testing, Liquid Penetration Testing, Magnetic Particle Testing. As per ASNT –SNT-TC-1A.
    Bagchi Institute of NDT
    Aug, 2008
    - Nov, 2024

Experience

    • Switzerland
    • Professional Services
    • 700 & Above Employee
    • GAIL Surveillance - Lead Sr. Inspection Engineer
      • Mar 2021 - Present

      Successfully Completed of Employment with SGS India Pvt. Ltd. as Lead Sr. Inspection Engineer & GAIL Surveillance In M/s. GAIL India Limited. Project at M/s MAN Industries India Pvt, Ltd. Khedoi, Anjar - Kutch. for March 2021 to Continues...1) Inspection of Bare Pipe API 5L Gr.X70, PSL 2, (LSAW) of 18” OD X 9.7mm, 11.8mm W.Thk Pipes For M/s. GAIL India Limited. (Dhamra to Haldia Pipeline Project) at M/s MAN Industries India Pvt, Ltd. Khedoi, Anjar - Kutch.2) Inspection of External 3LPE Coating & Enternal Liquide Epoxy Coating on API 5L Gr.X70, PSL 2, Bare pipe of 18” OD X 9.7mm, 11.8mm W.Thk Pipes For M/s. GAIL India Limited. (Dhamra to Haldia Pipeline Project) at M/s MAN Industries India Pvt, Ltd. Khedoi, Anjar - Kutch.

    • GAIL Surveillance - Sr. Inspection Engineer
      • Jan 2021 - Mar 2021

       Continues of Employment with M/s. SGS India Pvt. Ltd. as Sr. Inspection Engineer & GAIL Surveillance In M/s. GAIL India Limited. Project at M/s ARIO Infrastructure Private Limited. Ankot- Vagra to GNVFCL-Bharuch – Gujarat. for December 2020 to March 20211) Quality Surveillance of Pipeline LMC & Laying work - Ankot to GNVFCL Bharuch (GPRP Project, Part -B, 10" x 17.8 KM) Pipeline Laying all Activates Road, River, Canal Crossing by HDD & Mauling, Open Cut work, Trenching, Pipe Joint Welding, NDT Testing, Hydro & Pneumatic Test, Gauging & Pigging, Field Joint HSS Coating, Pipe Lowering & Back Filling, Cathodic protection Work, with Associated Facilities For LMC, SV Station Civil work, Skid Installation, Fire Protection System, Instrumentation Work. Ect For M/s. GAIL India Limited. (Laying & Construction Of Steel Gas Pipeline Along With Associated Facilities For Ankot top to GNFCVL Bharuch (AGPL) Pipeline Project In Western Region. (GPRP - Part B) at M/s ARIO Infrastructure Private Limited. Ankot- Vagra to GNVFCL-Bharuch – Gujarat.

    • GAIL Surveillance - Sr. Inspection Engineer
      • Dec 2020 - Jan 2021

      Quality Surveillance of Pipeline LMC & Laying work - M/s. Atul Chemical Pipeline Project In Ankleswar – Gujarat (GPRP Project, Part -B, 04" x 07 KM) Pipeline Laying all Activates Road, River, Canal Crossing by HDD Work, Trenching, Pipe Joint Welding, NDT Testing, Hydro & Pneumatic Test, Gauging & Pigging, Field Joint HSS Coating, Pipe Lowering & Back Filling, Cathodic protection Work, with Associated Facilities For LMC, SV Station Civil work, Skid Installation, Fire Protection System, Instrumentation Work Ect For M/s. GAIL India Limited. (Laying & Construction Of Steel Gas Pipeline Along With Associated Facilities For M/s. Atul Chemical Pipeline Project In Ankleswar – Gujarat. Western Region. (GPRP - Part B)

    • GAIL Surveillance - Sr. Inspection Engineer
      • Sep 2020 - Dec 2020

       Continues of Employment with M/s. SGS India Pvt. Ltd. as Sr. Inspection Engineer & GAIL Surveillance In M/s. GAIL India Limited. Project at M/s Kalptaru Power Transmission Limited. Bokaro to Petarbar to Gola to Ranchi – Jharkhand. for September 2020 to December 20201) Quality Surveillance of Pipeline Laying work - Bokaro to Ranchi (BAPL Section-I, 30" x 121.5 KM) Pipeline Laying all Activates Road, River, Canal Crossing by HDD & Mauling, Open Cut work, Trenching, Rock Blasting, Pipe Joint Welding, NDT Testing, Hydro & Pneumatic Test, Gauging & Pigging, Field Joint HSS Coating, Pipe Lowering & Back Filling, Cathodic protection Work, with Associated Facilities For LMC, IP & SV Station Civil work, Skid Installation, Fire Protection System, Instrumentation, Commissioning Work Ect & GAS In Process For M/s. GAIL India Limited. (Laying & Construction Of Steel Gas Pipeline Along With Associated Facilities For Bokaro to Angul section of Jagdishpur-Haldia-Bokaro-Dhamra Pipeline Project In Eastern Region. (JHBDPL-PH-II)) at M/s Kalptaru Power Transmission Limited. Bokaro to Petarbar to Gola to Ranchi – Jharkhand.

    • Italy
    • Professional Services
    • 700 & Above Employee
    • GAIL Surveillance, Sr. Surveyor
      • Aug 2019 - Sep 2020

       Successfully Completed of Employment with RINA India Pvt. Ltd. as Sr. Surveyor & GAIL Surveillance In M/s. GAIL India Limited. Project at M/s Corrtech International Pvt. Ltd. Ranchi to Khuti to Muru to Rania to Lacharagardh to Gumla to Simdega to Angul – Jharkhand. for August 2019 to September 20201) Quality Surveillance Inspection of Pipeline Laying work - Ranchi to Angul (BAPL Section-II, 30" x 121.5 KM) Pipeline Laying all Activates Road, River, Canal Crossing by HDD & Mauling, Open Cut work, Trenching, Rock Blasting, Pipe Joint Welding, NDT Testing, Field Joint HSS Coating, Lowering, Back Filling, Cathodic protection Work, with Associated Facilities For LMC, IP & SV Station Civil work, Skid Installation, Fire Protection System, Instrumentation, Commissioning Work Ect & GAS In Process For M/s. GAIL India Limited. (Laying & Construction Of Steel Gas Pipeline Along With Associated Facilities For Bokaro to Angul section of Jagdishpur-Haldia-Bokaro-Dhamra Pipeline Project In Eastern Region. (JHBDPL-PH-II)) at M/s Corrtech International Pvt. Ltd. Ranchi to Khuti to Muru to Rania to Lacharagardh to Gumla to Simdega to Angul – Jharkhand.

    • GAIL Surveillance, Sr. Surveyor
      • Jul 2019 - Aug 2019

       Successfully Completed of Employment with RINA India Pvt. Ltd. as Sr. Surveyor & GAIL Surveillance In M/s. GAIL India Limited. Project at M/s Sopan O&M Co. Pvt. Ltd, (HZL) Chittorgadh - Rajasthan for July 2019 to August 2019 1) Quality Surveillance Inspection of Pipeline Laying work with Associated Facilities For LMC, Skid Commissioning, Fire Protection System Installation, Instrumentation Work For M/s. GAIL India Limited. (Laying & Construction of Steel Gas Pipeline Along With Associated Facilities for LMC to M/S. Hindustan Zink Limited (HZL) Chittorgadh – Rajasthan Pipeline Project In Northern Region) at M/s Sopan O&M Co. Pvt. Ltd, (M/s. HZL) Chittorgadh – Rajasthan.

    • India
    • Business Consulting and Services
    • 300 - 400 Employee
    • GAIL Surveillance, Sr. Surveyor
      • Apr 2019 - Jul 2019

       Successfully Completed of Employment with International Certification Services Pvt. Ltd. as Sr. Surveyor & GAIL Surveillance In M/s. GAIL India Limited. Project at M/s NRP Project Pvt. Ltd. (Banas River) –Banash Katha. for April 2019 to June 2019 1) Quality Surveillance Inspection of Pipeline Laying & Construction Of Steel Gas Pipeline Along With LPG 16” Live Line in with Split Sleeve & Tee Welding and Hot Tapping Work, Welding, Hydro & Pneumatic Test, Pigging, NDT, Fire & Cathodic Protection, Steel Structural, Piping & Mechanical Works Completion & New Line Gas In Process For M/s. GAIL India Limited. (Permanent Mitigation Measure of Pipe Exposed in Banas River Crossing and Adjacent Area of Jamnagar Loni LPG Pipeline Project. and 02 Years Itme Rate Contract For Pipeline And Rou Maintenance Works And Emergency Jobs Along Jamnagar-Loni LPG Pipline. Split Sleeve Welding On Pipeline At Gail Ch.372.3 Between Ip-1 To Ips-Aburoad Section) at M/s NRP Project Pvt. Ltd. (Banas River) –Banash Katha, Gujarat

    • GAIL Surveillance, Sr. Surveyor
      • Feb 2019 - Apr 2019

       Successfully Completed of Employment with International Certification Services Pvt. Ltd. as Sr. Surveyor & GAIL Surveillance In M/s. GAIL India Limited. Project at M/s ARIO Infrastructure Pvt. Ltd.(GNFC) – Bharuch for February 2019 to April 2019 1) Quality Surveillance Inspection of Pipeline Laying with Associated Facilities For LMC, Skid Commissioning, Fire Protection System Installation, Instrumentation Work For M/s. GAIL India Limited. (Laying & Construction of Steel Gas Pipeline Along With Associated Facilities for LMC to M/S. Gujarat Narmada Valley fertilizer & Chemicals Limited (GNFC) Bharuch. Under Replacement Pipeline Project In Gujarat Region) at M/s ARIO Infrastructure Pvt. Ltd.(GNFC) – Bharuch Successfully Completed of Employment with International Certification Services Pvt. Ltd. as Sr. Surveyor & GAIL Surveillance In M/s. GAIL India Limited. Project at M/s Corrtech International Pvt. Ltd. (SGIPL) – Jhagadiya – Ankleswar for February 2019 to April 20191) Quality Surveillance Inspection of Pipeline Laying with Associated Facilities For LMC, Skid Commissioning, Fire Protection System Installation, Instrumentation Work For M/s. GAIL India Limited. (Laying & Construction Of Steel Gas Pipeline Along With Associated Facilities For LMC To & M/s. Saint Gobain Pvt. Ltd. (SGIPL) - Jhagadiya Under Replacement Pipeline Project In Gujarat Region) at M/s Corrtech International Pvt. Ltd. (SGIPL) – Jhagadiya – Ankleswar

    • GAIL Surveillance, Sr. Surveyor
      • Jan 2019 - Feb 2019

       Successfully Completed of Employment with International Certification Services Pvt. Ltd. as Sr. Surveyor & GAIL Surveillance In M/s. GAIL India Limited. Project at M/s Sopan O&M Co. Pvt. Ltd, (OPAL) Dahej - Bharuch for January 2019 to February 2019 1) Quality Surveillance Inspection of Pipeline Laying & Construction of Steel Gas Pipeline Along With Associated Facilities for LMC, Skid & And Hot bath heater Installation, Fire Protection System, Instrumentation Work For M/s. GAIL India Limited. (Laying & Construction Of Steel Gas Pipeline Along With Associated Facilities For LMC To M/S. ONGC Petro Additive Limited (OPAL) Dahej Under Replacement Pipeline Project In Gujarat Region) at M/s Sopan O&M Co. Pvt. Ltd, (OPAL) Dahej – Bharuch

    • GAIL Surveillance, Lead Sr. Surveyor
      • Aug 2018 - Jan 2019

       Successfully Completed of Employment with International Certification Services Pvt. Ltd. as Lead Sr. Surveyor & GAIL Surveillance In M/s. GAIL India Limited. Project at M/s MAN Industries India Pvt, Ltd. Khedoi, Anjar - Kutch. for August 2018 to January 20191) Inspection of Bare Pipe API 5L Gr.X70, PSL 2, (LSAW & HSAW) of 30” OD X 12.50mm, 14.8mm, 18.50mm & 17.50mm W.Thk Pipes For M/s. GAIL India Limited. (Bokaro-Angul Pipeline Section under Jagdispur-Haldia-Bokaro-Dhamra Pipeline Project, JHBDPL Phase - II) at M/s MAN Industries India Pvt, Ltd. Khedoi, Anjar - Kutch.2) Inspection of External 3LPE Coating & Enternal Liquide Epoxy Coating on API 5L Gr.X70, PSL 2, Bare pipe of 30” OD X 12.50mm, 14.8mm, 18.50mm & 17.50mm W.Thk Pipes For M/s. GAIL India Limited. (Bokaro-Angul Pipeline Section under Jagdispur-Haldia-Bokaro-Dhamra Pipeline Project, JHBDPL-II) at M/s MAN Industries India Pvt, Ltd. Khedoi, Anjar - Kutch.3) Inspection of Bare Pipe API 5L Gr.X70, PSL 2, (LSAW & HSAW) of 36” OD X 15.90mm W.Thk & 30” OD X 14.80mm & 20.6mm W.Thk Pipes For M/s. GAIL India Limited. (Dhobi-Durgapur-Haldia Pipeline Section along with Spurlines under JHBDPL Project) at M/s MAN Industries India Pvt, Ltd. Khedoi, Anjar - Kutch.4) Inspection of External 3LPE Coating & Enternal Liquide Epoxy Coating on API 5L Gr.X70, PSL 2, Bare pipe of 36” OD X 15.90mm W.Thk & 30” OD X 14.80mm & 20.6mm W.Thk Pipes For M/s. GAIL India Limited. (Dhobi-Durgapur-Haldia Pipeline Section along with Spurlines under JHBDPL Project) at M/s MAN Industries India Pvt, Ltd. Khedoi, Anjar - Kutch.

    • Belgium
    • Public Safety
    • 700 & Above Employee
    • Lead Sr. Surveyor & Incharge of Kutch Region
      • Feb 2018 - Aug 2018

       Successfully Completed of Permanent Employment with Vinçotte International India Assessment Services Pvt. Ltd. as Lead Sr. Surveyor In M/s. Caitan S.P.A & M/s. Saipem S.P.A Project at M/s Jindal Saw Limited, Mundra - Kutch. for February 2018 to August 20181) Inspection of Bare Pipe API 5L Gr.X65, PSL 2, (LSAW) of 36” OD X 9.53, 12.70mm & 14.27mm W.Thk Pipes For M/s. Caitan S.P.A & M/s. Saipem S.P.A (BHP Conveyance System Of Desalinated Water Supply For Spence Growth Options Project In Chile Pipe Line Project) at M/s Jindal Saw Limited, Mundra - Kutch.2) Inspection of 02 Pipe Bare Pipe (12Mtr + 12Mtr) Jointer of 36” OD X 9.53, 12.70mm & 14.27mm W.Thk Pipes For M/s. Caitan S.P.A & M/s. Saipem S.P.A (BHP Conveyance System Of Desalinated Water Supply For Spence Growth Options Project In Chile Pipe Line Project) at M/s Jindal Saw Limited, Nana kapaya - Mundra - Kutch.3) Inspection of External 3LPE Coating & Internal Liquid Epoxy Coating on API 5L Gr.X65, PSL 2, Bare pipe of 36” OD X 9.53, 12.70mm & 14.27mm W.Thk Pipes For M/s. Caitan S.P.A & M/s. Saipem S.P.A (BHP Conveyance System Of Desalinated Water Supply For Spence Growth Options Project In Chile Pipe Line Project) at M/s Jindal Saw Limited, Nana kapaya - Mundra - Kutch. Successfully Completed of Permanent Employment with Vinçotte International India Assessment Services Pvt. Ltd. as Lead Sr. Surveyor In M/s. Gail India Ltd (GAIL) & M/s. Kalpataru Power Transmission Limited, (KPTL) Project at M/s Welspun Corporation Limited - Anjar - Kutch. & M/s. PSL Ltd – Varsana, Kutch for February 2018 to May..20181) Inspection of CS Line Pipe 6D (20° to 110°) LR Hot Induction Bends as per MSS-SP-75. And Mecon Spec No.:MEC/TS/05/62/015, Rev-1, of 24” OD X 15.9 mm W.Thk Bends For M/s. Gail India Ltd (GAIL) & M/s. Kalpataru Power Transmission Limited, (KPTL) (Kochi Kattnad Mangalore Pipeline Project. Sec- II-B, II-A & III-A) at M/s Welspun Corporation Limited - Anjar - Kutch. & M/s. PSL Ltd – Varsana, Kutch.

    • United States
    • Oil and Gas
    • 200 - 300 Employee
    • Reliance PMC Sr. Surveyor
      • Dec 2017 - Feb 2018

       Successfully Completed of Contractual Employment with Reliance PMC - Intecsea Worley Parsons Company as Sr. Surveyor In M/s. Reliance Industries Ltd Project at M/s Welspun Corporation Limited - Anjar - Kutch. for December 2017 to February 20181) Inspection of Bare Pipe ISO 3183, DNV 450 DF (SAWL) Main Pipeline for 457.2, 462.94 & 469.34mm OD X 31.80, 28.60, 26.40 & 34.67mm W.Thk, Pipe For M/s. Reliance Industries Ltd. (R Cluster Development In Block KG-DWN-98/3 (KG-D6) Pipe Line Project) at M/s Welspun Corporation Limited – Varsamedi, Anjar, Kutch.

    • Germany
    • Public Safety
    • 700 & Above Employee
    • Sr. Surveyor
      • Oct 2017 - Dec 2017

       Successfully Completed of Contractual Employment with TUV Sud South Asia Pvt. Ltd (TUV Sud) as Sr. Surveyor In M/s. GSPL India Gasnet Limited (GIGL) & M/s. L&T Hydrocarbon Engineering Limited (LTHE) Project at M/s Welspun Corporation Limited – Varsamedi, Anjar, Kutch. for October 2017 to December…20171) Inspection of Bare Pipe API 5L (X70M) PSL 2 (HSAW) Main Pipeline for 30” OD X 10.8, 13.0, 15.5, & 15.7mm W.Thk, Guarat & Rajsthan Region Pipe For M/s. GSPL India Gasnet Limited (GIGL) & M/s. L&T Hydrocarbon Engineering Limited (LTHE) (Mahesana Bhatinda Gas Pipe Line Project) at M/s Welspun Corporation Limited – Varsamedi, Anjar, Kutch. Successfully Completed of Contractual Employment with TUV Sud South Asia Pvt. Ltd (TUV Sud) as Sr. Surveyor In M/s. Indian Oil Corporation Limited (IOCL) Project at M/s Venus Pipe & Tubes Pvt. Ltd – Dhaneti, Bhuj. for November 2017 to December 20171) Inspection of SS Seamless Pipe as per A-312/312M, Gr. TP-304. for 01 NPS OD X SCH 40S W.Thk, X 4 to7 Mtrs. Random Length Pipe For M/s. Indian Oil Corporation Limited (IOCL) (Panipat Refinery EP Plant Project) at M/s Venus Pipe & Tubes Pvt. Ltd – Dhaneti, Bhuj. Successfully Completed of Contractual Employment with TUV Sud South Asia Pvt. Ltd (TUV Sud) as Sr. Surveyor In M/s. L&T Construction Limited (LTCL) Project at M/s Jindal Saw Limited, Samaghoga - Mundra - Kutch. for October 2017 to November 20171) Inspection of Ductile Iron (DI) Pipes Class K7 Pipe as per IS 8329:2000, Gr. Class K7 DN for Dia 100mm & 200mm OD X 5.0 W.Thk, X 5.50 Mtrs. Length Pipe For M/s. L&T Construction Limited (LTCL) (WS-Development IT City Mohali Project) at M/s Jindal Saw Limited, Samaghoga - Mundra - Kutch.

    • Belgium
    • Public Safety
    • 700 & Above Employee
    • Lead Sr. Surveyor
      • Sep 2017 - Oct 2017

       Successfully Completed of Contractual Employment with Vinçotte International India Assessment Services Pvt. Ltd. as Lead Sr. Surveyor In M/s. Gail India Ltd (GAIL) & M/s. Kalpataru Power Transmission Limited, (KPTL) Project at M/s PSL Limited - Varsana - Kutch. for September 2017 to October 20171) Inspection of CS Line Pipe 6D Radius (20° to 110°) LR Hot Induction Bends as per MSS-SP-75. And Mecon Spec No.:MEC/TS/05/62/015, Rev-1, of 24” OD X 11.9 mm W.Thk Bends For M/s. Gail India Ltd (GAIL) & M/s. Kalpataru Power Transmission Limited, (KPTL) (Kochi Kattnad Mangalore Pipeline Project. Sec- II-B) at M/s PSL Limited - Varsana - Kutch.

    • Business Consulting and Services
    • 1 - 100 Employee
    • Lead Sr. Surveyor
      • Aug 2017 - Sep 2017

       Continues of Contractual Employment with Vinçotte International India Assessment Services Pvt. Ltd. as Lead Sr. Surveyor In M/s. Oman Gas Company S.A.O.C (OGC & M/s. Arabian Industrial Project LCC (AIP) Project at M/s Jindal Saw Limited, Nana kapaya - Mundra - Kutch. for August 2017 to October 20171) Inspection of 90 deg. 5D Hot Induction Bend Mfg. CS, ISO 3183 Gr. L450 / API 5L Gr.X65M, PSL 2, (LSAW) In accordance with DEP 31.40.20.33 Gen. / DEP 31.40.20.37 Gen. And External Bare with Internal Epoxy Flow Coating on 90 , 5D, Bends as per PCS-12 of SP-1246 (Part 1 to 5) and DEP 31.40.30.35 Gen of 28” OD X 13.8 mm & 12” OD X 9.53 mm W.Thk Bends For M/s. Oman Gas Company S.A.O.C (OGC) & M/s. Arabian Industrial Project LCC (AIP) (EPC Works for Modification & Extension at Sohar GSS and New IBRI GSS Pipe Line Project) at M/s Jindal Saw Limited, Nanakapaya & Samaghoga - Mundra - Kutch.2) Inspection of External 3LPE Coating as per DEP 31.40.30.31 Gen and Internal Epoxy Flow Coating as per PCS-12 of SP-1246 (Part 1 to 5) and DEP 31.40.30.35 Gen of 28” OD X 13.8 mm & 13.3 mm W.Thk Pipes For M/s. Oman Gas Company S.A.O.C (OGC) & M/s. Arabian Industrial Project LCC (AIP) (EPC Works for Modification & Extension at Sohar GSS and New IBRI GSS Pipe Line Project) at M/s Jindal Saw Limited, Nana kapaya - Mundra - Kutch.3) Inspection of CS Line Bare Pipe ISO 3183 Gr. L450 / API 5L Gr.X65M, PSL 2, (LSAW) In accordance with DEP 31.40.20.37-Gen. and HIC & SSC Tested and meet Sour Services Requirements’ as per SP-2041, DEP 30.10.02.16-Gen. / DEP 39.01.10.12.-Gen, and NACE MR 01-75 / ISO 15156, of 28” OD X 13.8 mm & 13.3 mm W.Thk Pipes For M/s. Oman Gas Company S.A.O.C (OGC) & M/s. Arabian Industrial Project LCC (AIP) (EPC Works for Modification & Extension at Sohar GSS and New IBRI GSS Pipe Line Project) at M/s Jindal Saw Limited, Nana kapaya - Mundra - Kutch.

    • India
    • Oil and Gas
    • 1 - 100 Employee
    • Sr. Surveyor
      • Mar 2017 - Aug 2017

       Successfully Completed of Contractual Employment with Meenaar (Global) Consultants Pvt. Ltd as Sr. Surveyor In M/s. Indian Oil Corporation Limited (IOCL) Project at M/s Bhushan Steel Limited – Khopoli - Mumbai. for July 2017 to August 20171) Inspection of Bare Pipe API 5L L320M (X70M) PSL 2 (HFERW) Main Pipeline for 18” OD X 6.35, 7.92, 9.53, 11.13mm W.Thk, Station Pipe For M/s. Indian Oil Corporation Limited (IOCL) (Koyali – Ahmed Nagar - Solapur Pipe Line Project) at M/s Bhushan Steel Limited – Khopoli - Mumbai. Successfully Completed of Contractual Employment with Meenaar (Global) Consultants Pvt. Ltd as Sr. Surveyor In M/s. Indian Oil Corporation Limited (IOCL) Project at M/s Ratnamani Metal Tubes Limited - Bhimashar - Kutch. for April 2017 to July…20171) Inspection of Bare Pipe API 5L L320M (X46M) PSL 2 (HFERW) Main Pipeline for 12” OD X 6.35, 7.92, 9.53, 11.13mm W.Thk, Station Pipe for 10”, 12” & 16” OD X 9.27, 9.53mm W.Thk and Casing Pipe 18” OD X 7.92mm W.Thk Pipes For M/s. Indian Oil Corporation Limited (IOCL) (Jaipur Panipat Naphtah Pipe Line Project) at M/s Ratnamani Metal Tubes Limited - Bhimashar - Kutch. Successfully Completed of Contractual Employment with Meenaar (Global) Consultants Pvt. Ltd as Sr. Surveyor In M/s. GAIL India Limited (GAIL) Project at M/s Essar Steel Limited, Hazira - Surat. for March 2017 to April 20171) Inspection of External 3LPE Coating and Internal Liquied Epoxy Coating for 18” OD X 9.50mm W.Thk Pipes For M/s. GAIL India Limited (GAIL) (Gorakhpur Spurline of Phulpur Haldiya Pipe Line Project- Phase 1B) at M/s Essar Steel Limited, Hazira - Surat.

    • Sr. Surveyor
      • Dec 2016 - Feb 2017

       Successfully Completed of Contractual Employment with Meenaar (Global) Consultants Pvt. Ltd as Sr. Surveyor In M/s. GAIL India Limited (GAIL) Project at M/s Jindal Saw Limited, Nana kapaya - Mundra - Kutch. for December 2016 to February 20171) Inspection of External 3LPE Coating and Internal Liquied Epoxy Coating for 24” OD X 11.10 mm W.Thk Pipes For M/s. GAIL India Limited (GAIL) (Auraiya - Thulendi Phulpur Section of (VAPPL) Pipe Line Project) at M/s Jindal Saw Limited, Nana kapaya - Mundra - Kutch.2) Inspection of Bare Pipe API 5L L485M (X70M) PSL 2 (HSAW) for 762mm OD X 12.70mm W.Thk Pipes For M/s. GAIL India Limited (GAIL) (Phulpur Haldiya Pipe Line Project- Phase 1B) at M/s Jindal Saw Limited, Samaghoga - Mundra - Kutch.

    • India
    • IT Services and IT Consulting
    • 700 & Above Employee
    • Principal Surveyor
      • Feb 2017 - Mar 2017

       Successfully Completed of Contractual Employment with Larsen & Toubro Ltd. as Principal Surveyor In M/s. Larsen & Toubro Limited, Hzira (Chhabra Project) at M/s Ratnamani Metal Tubes Limited (SS Division) - Bhimashar - Kutch. for February 2017 to March 20171) Inspection of Stainless Steel Welded, Cold Worked, (Bead Rolled) Bright Annealed Straight Tubes Conforming to as per SA – 249M ASME Sec. II Part - A Edition 2013, Gr. TP 304 and Size: 22.225mm OD X 0.711mm, 0.889mm & 1.245 mm W.Thk Tube For M/s. Larsen & Toubro Limited Project at M/s Ratnamani Metal Tubes Limited (SS Division) - Bhimashar - Kutch.

    • United Kingdom
    • International Trade and Development
    • 700 & Above Employee
    • Sr. Surveyor
      • Jun 2016 - Dec 2016

       Successfully Completed of Contractual Employment with Intertek Moody International India Pvt. Ltd. as Sr. Surveyor In M/s. Kuwait Oil Company (KOC) and M/s. Petrofac International Ltd with M/s. Consolidated Contractors Group S.A.L (Offshore) (CCC) Project at M/s Jindal Saw Limited, Nana kapaya - Mundra - Kutch. for June 2016 to December…20161) Inspection of Bare Pipe API 5L L415MS (X60MS) PSL 2 (LSAW) for 24”& 36” OD X 14.27, & 11.91mm W.Thk Pipes For M/s. Kuwait Oil Company (KOC) and M/s. Petrofac International Ltd with M/s. Consolidated Contractors Group S.A.L (Offshore) (CCC) (Lower Fars Heavy Oil Development Program Phase – I (60 MBOPD), Kuwait Pipe Line Project) at M/s Jindal Saw Limited, Nana kapaya - Mundra - Kutch.

    • United Arab Emirates
    • Oil and Gas
    • 1 - 100 Employee
    • Sr. Surveyor
      • May 2016 - Jun 2016

       Successfully Completed of Contractual Employment with Prime 4 Inspection L.C.C. as Sr. Surveyor In M/s. Tecnimont S.p.A and M/s. Abu Dhabi Company for Onshore Petroleum Operation Limited. (ADCO) Project at M/s Man Industries (India) Ltd, Khedoi - Anjar - Kutch for May 2016 to June 20161) Inspection of Bare Pipe L415MS / L415MO PSL 2 (LSAW) for 20”, 24”& 28” OD X 10.30, 14.30, 15.90, 17.50, 19.10, 20.60, 22.20, 27.0 & 31.80 mm W.Thk Pipes For M/s. Tecnimont S.p.A and M/s. Abu Dhabi Company for Onshore Petroleum Operation Limited. (ADCO) (Al Dabb’iya Surface Facilities Phase – III Project, BAE 3844 OT Abu Dhabi (UAE) EPC-ADCO Pipe Line Project) at M/s Man Industries (India) Ltd, Khedoi - Anjar - Kutch.2) Inspection of External 3LPE Coating and DFBE Coating for 20”, 24”& 28” OD X 10.30, 14.30, 15.90, 17.50, 19.10, 20.60, 22.20, 27.0 & 31.80 mm W.Thk Pipes For M/s. Tecnimont S.p.A and M/s. Abu Dhabi Company for Onshore Petroleum Operation Limited. (ADCO) (Al Dabb’iya Surface Facilities Phase – III Project, BAE 3844 OT Abu Dhabi (UAE) EPC-ADCO Pipe Line Project) at M/s Man Industries (India) Ltd, Khedoi - Anjar - Kutch.

    • India
    • Oil and Gas
    • 1 - 100 Employee
    • Sr. Surveyor
      • Apr 2016 - May 2016

       Successfully Completed of Contractual Employment with Meenaar (Global) Consultants Pvt. Ltd as Sr. Surveyor In M/s. Indian Oil Corporation Limited (IOCL) Project at M/s Welspun Corp Limited, Varshamedi - Anjar - Kutch. for April 2016 to May 20161) Inspection of Bare Pipe API5L Gr.X42M & BM, PSL2 (LSAW) for 24”, 30”, 36”, 42”, 48”,& 52” OD X 12.7, 17.48, & 19.05mm W.Thk Pipes For M/s. Indian Oil Corporation Limited (IOCL) (Laying of 42” crude oil pipeline from Chennai Port to CPCL, Manali Refinery Pipe Line Project) at M/s Welspun Corp Limited, Varshamedi - Anjar – Kutch2) Inspection of External 3LPE Coating for 42” OD X 12.7 mm W.Thk Pipes For M/s. Indian Oil Corporation Limited (IOCL) (Laying of 42” crude oil pipeline from Chennai Port to CPCL, Manali Refinery Pipe Line Project) at M/s Welspun Corp Limited, Varshamedi - Anjar – Kutch

    • Germany
    • Consumer Services
    • 700 & Above Employee
    • Sr. Surveyor
      • Apr 2016 - Apr 2016

       Successfully Completed of Contractual Employment with TUV India Private Limited (TUV Nord) as Sr. Surveyor In M/s. Reliance Industries Limited Project at M/s Surya Global Steel and Tubes Limited, - Bhuvad, Anjar, Kutch, Gujarat, India for April 2016 to April 20161) Inspection of Bare Pipe Electric Resistance Welded Carbon Steel Conforming to as per IS – 1239, FE 330 for 02”, 04”, 06”, 10” & 16” OD Pipes For M/s. Reliance Industries Limited Project. (CPT Reliance at Nagothane Site NMD Project) at M/s Surya Global Steel and Tubes Limited, - Bhuvad, Anjar, Kutch, Gujarat, India.  Successfully Completed of Contractual Employment with TUV India Private Limited (TUV Nord) as Sr. Surveyor In M/s. Mahesh Oil Industries Project at M/s Venus Pipes and Tubes Private Limited – Dhaneti, Bhuj - Kutch. for April 2016 to April 20161) Inspection of Austenitic Stainless Steel Welded Pipes Conforming to as per ASTM A – 312, Gr. TP 304 and Size: 2.1/2” NB, 01” NB OD X SCH 10S & SCH 40S W.Thk Tube For M/s. M/s. Mahesh Oil Industries Project at M/s Venus Pipes and Tubes Private Limited – Dhaneti, Bhuj – Kutch.

    • Sr. Surveyor
      • Apr 2016 - Apr 2016

       Successfully Completed of Contractual Employment with TUV India Private Limited (TUV Nord) as Sr. Surveyor In M/s. Indian Farmers Fertilizer Co-Operative Limited (IFFCO) Project M/s Ratnamani Metal Tubes Limited (SS Division) - Bhimashar - Kutch. for April 2016 to April 20161) Inspection of Bare Pipe Stainless Steel Welded, Beveled End, Pipes Conforming to as per ASTM – A312 & 358 CL-2, ASME B36.10, Gr. TP 304 & 304L and Size: 02”, 08”, 12” & 20” NPS OD X SCH 10S, SCH 40S & SCH XS W.Thk Pipes For M/s Indian Farmers Fertilizer Co-Operative Limited (IFFCO), (ANOLA – I PLANT Site Project) at M/s Ratnamani Metal Tubes Limited (SS Division) - Bhimashar - Kutch2) Inspection of Bare Pipe Stainless Steel Welded, Beveled End, Pipes Conforming to as per ASTM – A312, ASME B36.10, Gr. TP 304 & 304L and Size: 02”, 08” & 12” NPS OD X SCH 10S & SCH 40S W.Thk Pipes For M/s. Indian Farmers Fertilizer Co-Operative Limited (IFFCO), (ANOLA – II & PHULPUR PLANT Site Project) at M/s Ratnamani Metal Tubes Limited (SS Division) - Bhimashar - Kutch Successfully Completed of Contractual Employment with TUV India Private Limited (TUV Nord) as Sr. Surveyor In M/s. TC Concept and M/s. Ashben Sourcing and Logistics Pvt. Ltd. Project at M/s Surya Global Steel and Tubes Limited, - Bhuvad, Kutch, for April 2016 to April 20161) Inspection of Bare Pipe MS ERW GALVANIZID AND BLACK PIPES Conforming to as per EN 10255:2004 +A1:2007, Gr. S195T and Size: ¾” , 01”, 1½” , 1¼” , 02” , 2½” , 2¼” , 03” & 04” NB OD X L1 & L2 W.Thk Pipes For M/s. TC Concept and M/s. Ashben Sourcing and Logistics Pvt. Ltd. Project at M/s Surya Global Steel and Tubes Limited, - Bhuvad, Kutch2) Inspection of Bare Pipe MS ERW RED-OXIDE PAINTED PIPES Conforming to as per EN 10255:2004 +A1:2007, Gr. S195T and Size: ¾” , 01”, 1½” , 1¼” , 02” , 2½” , 2¼” & 03” NB OD X L1 & L2 W.Thk Pipes For M/s. TC Concept and M/s. Ashben Sourcing and Logistics Pvt. Ltd. Project at M/s Surya Global Steel and Tubes Limited, - Bhuvad, Kutch

    • Norway
    • Public Safety
    • 700 & Above Employee
    • Sr. Surveyor
      • Mar 2016 - Apr 2016

       Successfully Completed of Contractual Employment with M/s. DNVGL India Pvt. Ltd. as Sr. Surveyor In M/s. Petrofac Qatar W.L.L. Project at M/s Surya Global Steel and Tubes Limited, - Bhuvad, Anjar, Kutch, Gujarat, India for April 2016 to April 20161) Inspection of Bare Pipe Helical Seam Submerge Arc Welded (HSAW) as API5L Gr.B PSL1 for 20”, 24”, 30”, 32”, 36”, 40”, 44”, 48” & 60” OD X 11.8, & 18.0mm W.Thk Pipes For M/s. Petrofac Qatar W.L.L. (Khalifa Stadium Energy Centre and Office Building Project) at M/s Surya Global Steel and Tubes Limited, - Bhuvad, Anjar, Kutch, Gujarat, India.  Successfully Completed of Contractual Employment with M/s. DNVGL India Pvt. Ltd. as Sr. Surveyor In M/s. Mideast Pipeline Products and M/s Gail India Limited Project at M/s Jindal Tubular India Limited, - Varsana, Kutch, Gujarat, India for March 2016 to April 20161) Inspection of Hot Induction Bend Pipe with 5d Radius as API5L Gr.X70M PSL2 (Non Sour) for 18” OD X 14.30mm W.Thk Pipes For M/s. Mideast Pipeline Products and M/s Gail India Limited. (KG–BASIN Pipe Line Replacement Phase-II Project) at M/s Jindal Tubular India Limited, - Varsana, Kutch, Gujarat, India.

    • France
    • Environmental Services
    • 700 & Above Employee
    • Sr. Serveyor
      • Mar 2016 - Mar 2016

       Continues of Contractual Employment with Bureau Veritas India Pvt. Ltd. as Sr. Serveyor In M/s. United Drilling Tools Limited – KSEZ. (ONGC) Casing Pipes Project for March 2016 to Cont…20161) Inspection of Bare Pipe API5L Gr.X56 L360 PSL1 (LSAW) for 18” & 20” mm OD X 25.40 mm W.Thk Pipes For M/s. M/s. United Drilling Tools Limited – KSEZ. (ONGC Casing Pipes Project) at M/s Welspun Corporation Limited, - Dahej, Bharuch, Gujarat, India.  Continues of Contractual Employment with Bureau Veritas India Pvt. Ltd. as Sr. Serveyor In M/s. United Drilling Tools Limited – KSEZ. (ONGC) Casing Pipes Project for March 2016 to Cont…20161) Inspection of Bare Pipe API5L Gr.X56 L360 PSL1 (LSAW) for 18” & 20” mm OD X 25.40 mm W.Thk Pipes For M/s. M/s. United Drilling Tools Limited – KSEZ. (ONGC Casing Pipes Project) at M/s Welspun Corporation Limited, - Dahej, Bharuch, Gujarat, India.

    • Belgium
    • Public Safety
    • 700 & Above Employee
    • Lead Sr. Inspection Enginee
      • Feb 2016 - Mar 2016

        Successfully Completed of Contractual Employment with Vinçotte International India Assessment Services Pvt. Ltd. as Lead Sr. Inspection Engineer: In M/s. Public Authority for Electricity & Water (PAEW) and M/s. Egyptian Contracting Co. & Partner L.L.C (E.C.C.P) Project for February 2016 to Cont…20161) Inspection of Bare Pipe Helical Seam Submerge Arc Welded Line Pipe (HSAW) for 48” & 64” mm OD X 12.70, 17.48 & 20.62 mm W.Thk Pipes For M/s. Public Authority for Electricity & Water (PAEW) and M/s. Egyptian Contracting Co. & Partner L.L.C (E.C.C.P) (Water Transmission Pipeline from Water Treatment Plant of Wadi Dayqah Darn at Mazari in Wilayat Qurayyat to Deem Reservoir in Muscat Governorate Pipe Line Project) at M/s Jindal Saw Ltd, Samaghoga - Mundra - Kutch.2) Inspection of External 3LPE Coating and Internal Solvent Free Liquid Epoxy Coating for 48” & 64” mm OD X 12.70, 17.48 & 20.62 mm W.Thk Pipes For M/s. Public Authority for Electricity & Water (PAEW) and M/s. Egyptian Contracting Co. & Partner L.L.C (E.C.C.P) (Water Transmission Pipeline from Water Treatment Plant of Wadi Dayqah Darn at Mazari in Wilayat Qurayyat to Deem Reservoir in Muscat Governorate Pipe Line Project) at M/s Jindal Saw Ltd, Samaghoga - Mundra - Kutch.

    • India
    • Construction
    • 700 & Above Employee
    • Principal Surveyor
      • Jan 2016 - Feb 2016

       Successfully Completed of Contractual Employment with Larsen & Toubro Ltd. as Principal Surveyor In M/s. Larsen & Toubro Limited, Powia Project at M/s Ratnamani Metal Tubes Limited (SS Division) - Bhimashar - Kutch. for Jan 2016 to February 20161) Inspection of Stainless Steel Welded, Cold Worked, Bright Annealed ‘U’ Tubes Conforming to as per SA – 688M ASME Sec. II Part - A Edition 2013, Gr. TP 304 and Size: 15.9 mm OD X 2.2 mm & 2.6 mm W.Thk Tube For M/s. Larsen & Toubro Limited Project at M/s Ratnamani Metal Tubes Limited (SS Division) - Bhimashar - Kutch.

    • Singapore
    • Oil and Gas
    • 300 - 400 Employee
    • Lead Sr. Inspection Engineer / Expeditor
      • Sep 2015 - Jan 2016

       Successfully Completed of Four Month Contractual Employment with Swiber Offshore Construction India Pte, Ltd. as Lead Sr. Inspection Engineer / Expeditor In M/s. ONGC Project (1) Pipe Replacement Project Season IV (PRP4) Pipe Line Project, (2) Daman Development Pipe Line Project and (3) Cluster C-26 Pipe Line Project for September 2015 to January 2016.1) Inspection of Bare Pipe API5L Gr.X52 & X60 PSL2 (LSAW) for 16”, 18" & 24" OD X 19.1, 20.6, 23.8, 22.2, & 34.9 mm W.Thk Pipes as per ONGC Spec. FS-2020D. For M/s ONGC (PRP-IV, Daman Development and Cluster C-26 Pipe Line Project) at M/s Jindal Saw Limited – Nanakapay & Samaghoga - Mundra - Kutch.2) Inspection of External 3LPPE coating and CWC coating and Bracelet Type Anode Installation on 6”, 8”, 10”, 12”, 14”, 16”, 18”, 20”, & 24” DIA. Pipes as Per ONGC Spec. FS-2012A. For M/s ONGC (PRP-IV, Daman Development and Cluster C-26 Pipe Line Project) at M/s Jindal Saw Ltd, Nanakapaya & Samagoga - Mundra.3) Inspection of API 5L Gr.X-52, & X60 PSL-2, Long Radius Hot Induction Bends with 5D Radius for 6”, 8”, 10” 12” & 16” DIA. Bends as Per ONGC Spec. FS-2004A & D, and FS-2018. For M/s ONGC (PRP-IV, Daman Development and Cluster C-26 Pipe Line Project) at M/s Jindal Saw Ltd, Samaghoga - Mundra. 4) Inspection of External HSS coating With CWC coating and 3-Coat Painting on 6”, 8”, 10”, 12”, 14”, 16”, 18”, 20”, & 24” DIA. Bends as Per ONGC Spec. FS-2014, DIN-30672, FS-2013 and FS-2005. For M/s ONGC (PRP-IV, Daman Development and Cluster C-26 Pipe Line Project) at M/s Jindal Saw Ltd, Pragpar - Mundra.5) Inspection of J-Tube, I-Tube & Riser pipes with Monel Sheathing and M.S. Sleeve with Hanger Flange & Bell mouth Fabrications Work as Per ONGC Spec. FS-2015, ASTM-B127, and ASME Sec-IX. of 6”, 8”, 10”, 12”, 14”, 16”, 18”, 20”, 24” & 28” DIA. Riser Pipes For M/s ONGC (PRP-IV, Daman Development and Cluster C-26 Pipe Line Project) at M/s Jindal Saw Ltd, Pragpar - Mundra.

    • Lead Sr. Surveyor
      • Aug 2015 - Sep 2015

       Successfully Completed of Contractual Employment with RINA Services India Pvt. Ltd, as Lead Sr. Surveyor In M/s. Swiber Offshore Construction India Pte, Ltd. (ONGC) Project at M/s Jindal Saw Limited - Mundra - Kutch. for August 2015 to September 20151) Inspection of Bare Pipe API5L Gr.X52MO PSL2 (LSAW) and External 3LPE Coating for 18" & 16" OD X 19.1, 20.6, & 23.8 mm W.Thk Pipes For M/s. Swiber Offshore Construction India Pvt, Ltd. Project (Pipe Replacement Project Season IV (PRP4) Pipe Line Project) at at M/s Jindal Saw Limited – Nanakapay - Mundra - Kutch.. 2) Inspection of External CWC Coating for 16" & 18" OD X 19.1, 20.6, & 23.8 mm W.Thk Pipes For M/s. Swiber Offshore Construction India Pvt, Ltd. Project (Pipe Replacement Project Season IV (PRP4) Pipe Line Project) at at M/s Jindal Saw Limited – Pragpar - Mundra – Kutch

    • Sr. Surveyor
      • Jul 2015 - Aug 2015

       Successfully Completed of Contractual Employment with Germanischer Lloyd Industrial Services India Pvt. Ltd, as Sr. Surveyor In M/s. Oil and Nature gas Corporation Limited Project at M/s Ratnamani Metal Tubes Limited - Bhimashar - Kutch. for July 2015 to July 20151) Inspection of Bare Pipe IS 3589 Fe-410 (HSAW & ERW) and External AAP Finish Paint Coating for 30”, 24" & 20" OD X 8.00, & 6.35 mm W.Thk Pipes For M/s. Oil and Nature gas Corporation Limited Project (Fire Water Network at ONGC Plant Hazira Pipe Line Project) at M/s Ratnamani Metal Tubes Limited - Bhimashar - Kutch.

    • India
    • Oil and Gas
    • 1 - 100 Employee
    • Sr. Surveyor
      • May 2015 - Jul 2015

       Successfully Completed of Contractual Employment with Meenaar (Global) Consultants Pvt. Ltd, as Sr. Surveyor In M/s. Gail India Limited Project at M/s Ratnamani Metal Tubes Limited - Bhimashar - Kutch. for June 2015 to July 20151) Inspection of External 3LPE Coating for 04"​ OD X 7.1 mm W.Thk Pipes For M/s. Gail (India) Limited Project (Pipe Replacement Project In Gujarat Region Pipe Line Project) at at M/s Ratnamani Metal Tubes Limited - Bhimashar - Kutch.  Successfully Completed of Contractual Employment with Meenaar (Global) Consultants Pvt. Ltd, as Sr. Surveyor In M/s. Enbridge Offshore Facilities, LLC Project at M/s Welspun Corp Limited, Anjar - Kutch. for May 2015 to June 20151) Inspection of Bare Pipe API5L Gr.X65MO / L450MO PSL2 (LSAW) for 18" OD X 25.40 mm & 20.32 mm W.Thk Pipes For M/s.Cairn India Limited & M/s. Enbridge Offshore Facilities, LLC Project (18-INCH Stampede Oil Export SCR & Pipe Line Project) at M/s Welspun Corp Limited, Anjar – Kutch.

    • India
    • Construction
    • 700 & Above Employee
    • Principal Surveyor
      • May 2015 - Jun 2015

       Successfully Completed of Contractual Employment with Larsen & Toubro Ltd. as Principal Surveyor In M/s. Larsen & Toubro Limited Project at M/s Ratnamani Metal Tubes Limited (SS Division) - Bhimashar - Kutch. for May 2015 to June 20151) Inspection of Stainless Steel Welded, Cold Worked, (Bead Rolled) Bright Annealed Straight Tubes Conforming to as per SA – 249M ASME Sec. II Part - A Edition 2013, Gr. TP 304 and Size: 22.225mm OD X 0.711mm & 1.245 mm W.Thk Tube For M/s. Larsen & Toubro Limited Project at M/s Ratnamani Metal Tubes Limited (SS Division) - Bhimashar - Kutch.

    • Germany
    • Consumer Services
    • 700 & Above Employee
    • Sr. Surveyor
      • May 2015 - May 2015

       Successfully Completed of Contractual Employment with TUV India Private Limited (TUV Nord) as Sr. Surveyor In M/s Reliance Industries Limited Project at M/s Surya Global Steel Tubes Limited, Bhuvad, Anjar – Kutch. for May 2015 to May 20151) Inspection of Bare Pipe Is 3589:2001, Gr. Fe 410 Helical Submerged Arc Welded Pipe (HSAW – Spiral ) for 711.2 mm & 508.0 mm OD X 10.0 mm & 8.0 mm W.Thk Pipes For M/s. Reliance Industries Limited (180% EOEG DBN – Dahej Site Project) at M/s Surya Global Steel Tubes Limited, Bhuvad, Anjar – Kutch.

    • Hong Kong
    • Manufacturing
    • 700 & Above Employee
    • Sr. Surveyor
      • Apr 2015 - May 2015

       Successfully Completed of Contractual Employment with Bureau Veritas India Pvt. Ltd. as Sr. Surveyor In M/s Gail (India) Limited Project at M/s Surya Global Steel Tubes Limited, Bhuvad, Anjar – Kutch. for April 2015 to May 20151) Inspection of Bare Pipe API5L:45Th Edition Gr.X42M(L290M) PSL2 High Frequency Electric Resistance Welded Line Pipe (ERW) for 4” OD X 7.1 mm & 7.9 mm W.Thk Pipes For M/s. Gail (India) Limited (Pipeline Replacement Project in Cauvery Basin, Tamilnadu Pipe Line Project) at M/s Surya Global Steel Tubes Limited, Bhuvad, Anjar – Kutch.2) Inspection of Bare Pipe API5L:45Th Edition Gr.X42M(L290M) PSL2 High Frequency Electric Resistance Welded Line Pipe (ERW) for 4” OD X 7.1 mm W.Thk Pipes For M/s. Gail (India) Limited (Pipeline Replacement Project in Gujarat Region Pipe Line Project) at M/s Surya Global Steel Tubes Limited, Bhuvad, Anjar – Kutch.

    • Germany
    • Public Safety
    • 700 & Above Employee
    • Lead Surveyor
      • Mar 2015 - Apr 2015

       Successfully Completed of Contractual Employment with Tuv Sud South Asia Pvt. Ltd, as Lead Surveyor In M/s.Cairn India Limited & M/s Kalpataru Power Transmission Limited Project at M/s Jindal Saw Limited, Samagogha - Mundra. for March 2015 to April 20151) Inspection of Bare Pipe API5L Gr.X60 PSL2 (LSAW) for 30" OD X 11.1 mm W.Thk Pipes For M/s.Cairn India Limited & M/s Kalpataru Power Transmission Limited Project (Thumbali Water Pipe Line Project) at M/s Jindal Saw Limited, Samagogha - Mundra.2) Inspection of Internal Fusion Bonded Epoxy Coating (IFBE - First Time In India) for 30" OD X 11.1 mm W.Thk Pipes For M/s.Cairn India Limited & M/s Kalpataru Power Transmission Limited Project (Thumbali Water Pipe Line Project) at M/s Jindal Saw Limited, Samagogha - Mundra.3) Inspection of External 3LPE coating for 30" OD X 11.1 mm W.Thk Pipes For M/s.Cairn India Limited & M/s Kalpataru Power Transmission Limited Project (Thumbali Water Pipe Line Project) at M/s Jindal Saw Limited, Samagogha - Mundra.

    • Germany
    • Consumer Services
    • 700 & Above Employee
    • Sr. Surveyor
      • Mar 2015 - Mar 2015

       Continues of Contractual Employment with TUV India Private Limited (TUV Nord) as Sr. Surveyor In M/s. BARC (Govt.of India) Project at M/s Scorodite Stainless (India) Private Limited, Sanchore - Rajsthan. for March 2015 to Continues 20151) Inspection of Stainless Steel 304L Seam Welded Pipes as per ASTM A-312 TP 304L High Frequency Electric Resistance Welded Line Pipe (HFERW) for 8mm (¼”) NB, 15mm (½”) NB, 20mm (¾”) NB, 25mm (1”) NB, and 40mm (1½”) NB. OD Pipes For M/s. BARC (Govt. of India) Project at M/s Scorodite Stainless (India) Private Limited, Sanchore - Rajsthan.2) Inspection of Stainless Steel Seamless Pipes as per ASTM A-312 TP 304L Pipe for 20mm (¾”) NB, 25mm (1”) NB, 40mm (1½”) NB, 50mm (2”) NB, 80mm (3”) NB, 100mm (4”) NB, 150mm (6”) NB. OD Pipes For M/s. BARC (Govt. of India) Project at M/s Scorodite Stainless (India) Private Limited, Sanchore - Rajsthan. Continues of Contractual Employment with TUV India Private Limited (TUV Nord) as Sr. Surveyor In M/s. Reliance Industries Limited Project at M/s Welspun Steel Limited - Varshamedi, Anjar, Kutch. for March 2015 to Continues 20151) Inspection of Mild Steel (Metal Rods) TMT STEEL BAR with Ribb as per Spec IS - 1786 FE 415 for 8mm, 10mm, 12mm, 20mm, and 25mm. OD TMT TOR Steel Bar For M/s. Reliance Industries Limited - Jamnagar Project at M/s Welspun Steel Limited - Varshamedi, Anjar, Kutch. Continues of Contractual Employment with TUV India Private Limited (TUV Nord) as Sr. Surveyor In M/s. Reliance Industries Limited Project at M/s Ratnamani Metal Tubes Limited (SS Division) - Bhimashar - Kutch. for March 2015 to Continues 20151) Inspection of Stainless Steel Seamless Pipes as per ASTM A 358 -14a Gr. TP 316 CLASS 1, Both ends –Bevel end Size: 18 NPS X Sch-10 X 4.6 to 7.0 meter Random Length Pipes For M/s. Reliance Industries Limited Project at M/s Ratnamani Metal Tubes Limited (SS Division) - Bhimashar - Kutch.

    • Hong Kong
    • Manufacturing
    • 700 & Above Employee
    • Sr. Surveyor
      • Dec 2014 - Feb 2015

       Successfully Completed Three Months of Contractual Employment with Bureau Veritas as Sr. Surveyor: In M/s. GSPC Gas Company Limited Project at M/s Ratnamani Metals & Tubes Limited, Anjar - Kutch. for December 2014 to Continues 20151) Inspection of Bare Pipe API5L:2012 Gr.X52M(L360M) & X65M(L450M) PSL2 High Frequency Electric Resistance Welded Line Pipe (HFERW) for 6”, 8” & 12” OD X 6.4 mm & 7.92 mm W.Thk Pipes For M/s. GSPC Gas Company Limited (M/s. GSPC Gas Pipe Line Project) at M/s Ratnamani Metals & Tubes Limited, Anjar – Kutch.2) Inspection of External 3LPE coating for 6”, 8” & 12” OD X 6.4 mm & 7.92 mm W.Thk Pipes For M/s. GSPC Gas Company Limited (M/s. GSPC Gas Pipe Line Project) at M/s Ratnamani Metals & Tubes Limited, Anjar – Kutch.

    • Norway
    • Oil and Gas
    • 200 - 300 Employee
    • Sr. Surveyor
      • Dec 2014 - Dec 2014

      Successfully Completed Project Base Time of Contractual Employment with Det Norske Veritas AS as Sr. Surveyor: In M/s. Carigali- Pttepi Operting Company Sdn Bhd (CPOC) Project at M/s Welspun Corp Limited, Anjar - Kutch. for December 2014 to December 20141) Inspection of Bare Pipe API5L:2012 Gr.X52M(L360M) & X65M(L450M) PSL2 Longitudinal Seam Submerged Arc Weded Pipes (SAWL) for 18” & 16.37" OD X 15.9mm, 17.5mm, 20.6mm, 22.89mm, 24.24mm W.Thk Pipes For M/s. Carigali- Pttepi Operting Company Sdn Bhd (CPOC) Project (JDA Block B-17 Phase 3 Devlopment Pipe Line Project) at M/s Welspun Corp Limited, Anjar – Kutch.

    • India
    • Construction
    • 700 & Above Employee
    • Sr. Quality Inspection Engineer
      • Nov 2014 - Nov 2014

       Successfully Completed one Month of Contractual Employment with Larsen & Toubro Ltd. – Arabia as Sr. Quality Inspection Engineer : In M/s. Saudi Aramco Project for November 2014 to December 20141) Inspection of Carbon Steel Seamless Cold Drawn “U” TUBES, Conforming to as per Specification SA-179M & SA-334M Gr.6 of ASME Sec.II, Part. A, Edition 2010 Addenda 2011a; for 19.5 & 25.40 mm OD X 2.10 & 2.77 mm W.Thk “U” TUBES, For M/s. Saudi Aramco (Midyan Gas Processing Facilities Pipe Line Project) SS Plant at M/s Ratnamani Metals & Tubes Limited, Anjar - Kutch.

    • Sr. Quality Inspection Engineer
      • Oct 2014 - Nov 2014

       Successfully Completed Project Base Time of Contractual Employment with Pandya Quality Services Pvt. Ltd as Sr. Quality Inspection Engineer : In M/s. Adani Kandla Bulk Terminal Pvt. Ltd. and M/s F. Harley & Co. Pvt. Ltd. Project for October 2014 to November 20141) Inspection of Electric Resistance Welded (ERW) Mild Steel Pipe as per IS1239 & IS 3589 for 65, 80, 100, 125, 150, 200, 250 NB OD X 6.35 mm W.Thk Pipes For M/s. Adani Kandla Bulk Terminal Pvt. Ltd. and M/s F. Harley & Co. Pvt. Ltd. (Tuna Kandla Pipeline and APSEZL, Phase –III Pipe Line Project) at M/s Welspun Corp. Ltd, Anjar - Kutch.

    • United States
    • Oil and Gas
    • 1 - 100 Employee
    • Sr. Quality Inspection Engineer
      • Aug 2014 - Oct 2014

       Successfully Completed Two Months of Contractual Employment with ITI International India Pvt. Ltd as Sr. Quality Inspection Engineer: In M/s Shell Pipeline company L.P. Project for August 2014 to October 20141) Inspection of Bare Pipe API 5L X70M PSL2 (LSAW) for 36" OD X 11.91 mm W.Thk Pipes For M/s. Shell Pipeline, L.P. (Shell Westward Ho Pipe Line Project) at M/s Welspun Corp. Ltd, Anjar - Kutch.

    • Sr. Quality Inspection Engineer
      • Jul 2014 - Aug 2014

      ð Successfully Completed Two Months of Contractual Employment with ITI International LLC. as Sr. Quality Inspection Engineer: In M/s Plains All American Pipeline, L.P. Project for July 2014 to Continues 20141) Inspection of Bare Pipe API 5L X65M PSL2 High Frequency Welded Line Pipe (HFW) for 24" OD X 0.375"/0.438"/0.500" W.Thk Pipes For M/s. Plains All American Pipeline, L.P. ( PLAINS WINK TO MIDLAND PIPE LINE PROJECT ) at M/s SeAH Steel Corp. City - Pohang, South Korea,2) Inspection of Bare Pipe API 5L X52M PSL2 High Frequency Welded Line Pipe (HFW) for *14" OD X 0.375"/0.500" WT, *12",3/4" OD X 0.312" WT, *10",3/4" OD X 0.250"/0.365" WT, *8",5/8" OD X 0.250" WT, *6",5/8" OD X 0.250" WT, *4",1/2" OD X 0.237" W.Thk Pipes For M/s. Plains All American Pipeline, L.P. ( PLAINS INVENTORY PIPE LINE PROJECT ) at M/s SeAH Steel Corp. City - Pohang, South Korea,

    • United Kingdom
    • International Trade and Development
    • 700 & Above Employee
    • Lead Inspection Engineer
      • Apr 2014 - Jun 2014

       Successfully Completed Three Months of Contractual Employment with M/s Intertek Moody International Pvt. Ltd. as Lead Quality Inspection Engineer: In M/s Shell Petroleum Devlopment Company of Nigeria Limited (SPDC) & M/s NEST OIL PLC Project for April 2014 to Continues 20141) Inspection of Heat Shrink Sleeve (PPS120) coating on Hot Induction Bends, API 5L L450M (X65) PSL2, SOUR GAS SERVICE, SIZE: 20’’ X 20.62 MM WT, for M/s SHELL PETROLEUM DEVLOPMENT COMPANY OF NIGERIA LIMITED (SPDC) & M/s NEST OIL PLC (Kolo Creek to Soku Gas Export Pipeline Project) at M/s Welspun Corp. Ltd, Anjar - Kutch.

    • Business Consulting and Services
    • 1 - 100 Employee
    • Lead Inspection Engineer
      • Feb 2014 - Apr 2014

       Successfully Completed Three Months of Contractual Employment with Vinçotte International India Assessment Services Pvt. Ltd. as Quality Inspection Engineer: In M/s. Gulf Petrochemical Services & Trading LLC – Oman Project for February 2014 to April 20141) Inspection of Bare Pipe Helical Seam Submerge Arc Welded Line Pipe (HSAW) for (64” DIA) 1626 mm OD X 13.10 mm W.Thk Pipes For M/s. Gulf Petrochemical Services & Trading LLC – Oman (Water Transmission Line Form Ghubrah Desalination Plant to Muscat Reservoir Pipe Line Project) at M/s Jindal Saw Ltd, Samaghoga - Mundra - Kutch.2) Inspection of External FBE coating for (64” DIA) 1626 mm OD X 13.10 mm W.Thk Pipes For M/s. Gulf Petrochemical Services & Trading LLC – Oman (Water Transmission Line Form Ghubrah Desalination Plant to Muscat Reservoir Pipe Line Project) at M/s Jindal Saw Ltd, Samaghoga - Mundra - Kutch.3) Inspection of Internal Solvent Free Liquid Epoxy Coating for (64” DIA) 1626 mm OD X 13.10 mm W.Thk Pipes For M/s. Gulf Petrochemical Services & Trading LLC – Oman (Water Transmission Line Form Ghubrah Desalination Plant to Muscat Reservoir Pipe Line Project) at M/s Jindal Saw Ltd, NanaKapaya - Mundra - Kutch.

    • Spain
    • Industrial Machinery Manufacturing
    • 100 - 200 Employee
    • Quality Inspection Engineer
      • Nov 2013 - Feb 2014

      Successfully Completed Three Months of Contractual Employment with Servicios de Control e Inspección S.A.- Spen ( SCI ) as Quality Inspection Engineer: In M/s Grupo Cunado S.A. & M/s Total S.A. Project for November 2013 to February 20141) Inspection of Bare Pipe LSAW for 30” DIA. x 14.3mm, 17.5mm & 20.6mm W.Thk Pipes For M/s GRUPO CUNADO S.A. & M/s TOTAL S.A. (Incahuasi & Aquio Fields Development Project) at M/s Welspun Corp. Ltd, Anjar - Kutch.2) Inspection of 3LPE coating for 30” DIA. x 14.3mm, 17.5mm & 20.6mm W.Thk Pipes For M/s GRUPO CUNADO S.A. & M/s TOTAL S.A. (Incahuasi & Aquio Fields Development Project) at M/s Welspun Corp. Ltd, Anjar - Kutch.3) Inspection of Internal Solvent Base Epoxy Paint Coating for 30” DIA. x 14.3mm, 17.5mm & 20.6mm W.Thk. Pipes For M/s GRUPO CUNADO S.A. & M/s TOTAL S.A. (Incahuasi & Aquio Fields Development Project) at M/s Welspun Corp. Ltd, Anjar - Kutch.

    • United Kingdom
    • Civil Engineering
    • 700 & Above Employee
    • Quality Inspection Engineer
      • May 2013 - Nov 2013

       Successfully Completed Six Months of Contractual Employment with Mott MacDonald Pvt. Ltd. as Quality Inspection Engineer: In HPCL Project & BPCL Project for May 2013 to November 20131) Inspection of 3LPE coating for 8”, 10”, 14” & 16” DIA. Pipes For M/s HPCL (MHMS LPG Line Project) at M/s Jindal Saw Ltd, Samaghoga - Mundra.2) Inspection of Bare Pipe LSAW for 8”, 10”, 14” & 16” DIA. Pipes For M/s HPCL (MHMS LPG Line Project) at M/s Jindal Saw Ltd, Samaghoga - Mundra.3) Inspection of 3LPE coating for 14” DIA. x 6.4mm & 9.5mm W.Thk Pipes For M/s BPCL (Kota – Jobner Pipe Line Project) at M/s Ratnamani Metals & Tubes Ltd, Bhimashar - Anjar.

    • Hong Kong
    • Construction
    • 700 & Above Employee
    • Quality Inspection Engineer
      • Nov 2012 - Apr 2013

       Successfully Completed Six Months of Contractual Employment with Leighton Welspun Contractors India Pvt, Ltd. as Quality Inspection Engineer: In ONGC Project for November 2012 to April 20131) Inspection of 3LPE coating for 4”, 6”, 8”, 10” & 12” DIA. Pipes For M/s ONGC (PRP-III Project) at M/s Jindal Saw Ltd, Nanakapaya - Mundra.2) Inspection of CWC coating With Anode Installation for 4”, 6”, 8”, 10” & 12” DIA. Pipes For M/s ONGC (PRP-III Project) at M/s Jindal Saw Ltd, Pragpar - Mundra.3) Inspection of Long Radius Hot Induction Bends with 5D Radius x Angel as per API 5L Gr.X-52, 60, & 65, PSL-2, for 6”, 8”, 10” 12” & 16” DIA. Bends For M/s ONGC (PRP-III Project) at M/s Jindal Saw Ltd, Samaghoga - Mundra.4) Inspection of HSS coating With CWC coating for 4”, 6”, 8”, 10” & 12” DIA. Bends For M/s ONGC (PRP-III Project) at M/s Jindal Saw Ltd, Pragpar - Mundra.5) Inspection of Riser pipes with Monel Shathing and M.S. Sleeve with Hanger Flange & Bellmouth Fabrications Work for 4”, 6”, 8”, 10”, 12”, 16”, 22”, & 24” DIA. Riser Pipes For M/s ONGC (PRP-III Project) at M/s Jindal Saw Ltd, Pragpar - Mundra.6) Inspection pipes of Internal Epoxy coating for 12” DIA. Pipes For M/s ONGC (PRP-III Project) at M/s MAN Industries Pvt, Ltd, Khedoi - Anjar.

    • Singapore
    • Oil and Gas
    • 300 - 400 Employee
    • Techcellent Inspectorate
      • Feb 2012 - Oct 2012

       Successfully Completed Nine Months of Contractual Employment with Swiber Offshore Constructions Pte Ltd. as Techcellent Inspectorate: In Cluster7 Project for February 2012 to October 2012 1) Inspection of 3LPE coating, CWC coating With Anode Installation for 20”, 22”, 28”, & 30” DIA. Pipes For M/s ONGC at M/s PSL Ltd, Gandhidham.2) Inspection of HSS coating With CWC coating for 20”, 22”, 28”, & 30” DIA. Bends For M/s ONGC at M/s PSL Ltd, Gandhidham.3) Inspection of Riser pipes with Monel Shathing and M.S. Sleeve with Hanger Flange Fabrications Work for 20”, 22”, 28”, & 30” DIA. Riser Pipes For M/s ONGC at M/s PSL Ltd, Gandhidham.4) Inspection of Long Radius Hot Induction Bends with 5D Radius x Angel as per API 5L Gr.X-52, 60, PSL-2, for 20”, 22”, 28”, & 30” DIA. Bends For M/s ONGC at M/s PSL Ltd, Gandhidham.

    • Freelancer Inspection Engineer
      • Jul 2010 - Jan 2012

      1) Inspection and consulting for various clients on Per-Man-Day basis.2) Timely response to clients inspection calls3) Inspection at manufacturer’s location as per quality assurance plan or customer specifications.4) Final inspection including witness of loading to lorry before dispatch.5) NDT witness and document review including.6) Dimensional inspection as per applicable drawing.7) Products inspected: fittings (Tee, elbow, reducer etc.), forged flanges, pipes and tubes (dimensional inspection only).8) Inspection as per customer requirement for various products and coatings at many different locations. Quality Assurance Documentation, QAP/ITP, Third Party Inspection, Vendor Audit, Vendor development, NDT, Welding, Coating, Painting, Sub vendor inspection, Stage inspection of fabricated parts, Familiar with Various International Codes and Specifications such as ASME SEC II, SEC V, SEC VIII, SEC IX, ASTM, DIN, BS, AWWA, Shell Global Specification & IS, API 5H, API 5L, TEMA etc

    • Quality Assistant Manager
      • May 2005 - Jun 2010

      1) Preparation and Implementation of QA/QC Procedure, Quality Assurance & Inspection Test Plan as per Client technical / Specification requirements like API, ASTM, AS, DIN, BS, AWWA, Shell Global Specification & IS etc.2) Planning for proper Supervision of the QA Manpower to maximize productivity efficiency & organizing the work force for effective Quality Services. 3) Documentation for ISO 9001, API 5L & IS 3589/IS 5504 Certification as per Quality System Manual & Quality System Procedure.4) Well conversant with all types of Mfg, Fabrication, coatings with quality viz :  Pipe, Bend & Anode Manufacturing,  Anode Installations on Pipe, Monel sheathing and M.S. Sleeve with Hanger Flange & Bellmouth Fabrications Work on Riser Pipe,  FBE, 3LPE, 3LPP, CTE, HSS, & CWC Coating, Poly Chloroprene (Neoprene) Coating, Poly urethane Coating, Internal Liquid Epoxy Coating, Painting Bend & Elbows,5) Having familiar and knowledge of Lab testing and analysis of raw material as well finished products according to international Codes & Standards such as  Internal Coating: as per ISO 15741, API RP5L, Dep31.40.30.35 Gen,  Fusion Bonded Epoxy Coating: as per AS 3862, CAN/CSA-Z 245-20,  3-Layer Polyethylene/polypropylene Coating: as per DIN 30670, DIN 30678, CAN/CSA-Z 245-21, Dep 31.40.30.31 Gen,  Concrete Weight Coating: as per ONGC Spec FS-2013, 6) Raw Materials & Coating System Includes Inspection of all Raw Materials, & finished products sampling, and Lab Testing & shop floor finished production testing as per their code’s requirements.7) Implementing & maintaining Documents, Data / records pertaining to the requirement of standards & customer specification & drawings.8) Liaison with TPI/client /consultant on Quality Systems/Procedures and project co-ordination…..9) Preparation of Project schedule and progress Charts

    • India
    • Mechanical Or Industrial Engineering
    • 500 - 600 Employee
    • Senior Quality Engineer
      • Sep 2004 - Apr 2005

      1) Raw material inspection, Welding inspection, Welder approval, WPS and PQR approvals, NDT witness, visual and dimensional inspection of all Pipe in the order, final punching and stamping, painting inspection and dispatch clearance.2) NDT witness, Welding Inspection, Perform Macro Etching test on welded samples, Welder selection and witnessing of welding test coupons.3) Attending third party inspection and client inspection as and when needed.4) Reporting to Quality Manager and following instruction given by quality to manager on daily basis.5) Inspected various fabricated parts like chimney, hoppers, “Headers and subsequent assembly” used in economizer unit.6) Finned Tubes inspection: only Visual and Dimensional inspection of finned tubes as and when needed.7) Responsible for inspection of Pipe & Tubular products such Tee, Elbow, Reducer, Bend, as per customer’s requirements.8) Responsible for individually allocated orders. Starting from raw material and up to dispatch to ensure all the requirements are fulfilled.9) Working with various third party inspection agencies like DNV, GLIS, BVIS ect. and to satisfy the third party inspector by closely working with them during inspection as per quality assurance plan and to get Release note from third party inspection agencies.10) Preparation of all quality related documents.11) Working with production, dispatch and marketing department to ensure the customer requirements are fulfilled.

    • Qa/Qc Inspector
      • Oct 2003 - Aug 2004

      1) Initially hired as quality Control Inspector and later on was given responsibility of Raw Material Inspection, Lab activities & Preparing Documents also.2) Reporting to Quality Manager and following instruction given by quality to manager on daily basis.3) Working in team with the entire quality control department for daily inspection activities. at Various Stage & Incoming , In process to Final4) Raw Material Inspection & Lab Testing, M.T.C Verification, 5) Raw Material Vendors Approval For Client, 6) Raw Material Documents and Test Certificate Verification by TPI and client, 7) Correspondence With Raw Material Manufacturer, 8) Daily Co-ordination Store and Purchases Department, 9) Planning To Raw material Batch Use By “FIFO” Method,10) Bare Pipe Visual & Marking / Coding Inspection at In late Stage,11) Witnessing of Shot Blasting, Sand Blasting at Blasting Stage,

Education

  • Krantiguru Shyamji Krishna Verma Kachchh University - Bhuj
    Advance Diploma, Disaster Management Engineering
    2010 - 2013
  • Govt. Polytechnic College - Bhuj
    Diploma, Mechanical Engineering
    2002 - 2005
  • Industrial Technical Institute - Adipur
    I.T.I, TURNER
    2001 - 2003
  • Indira Gandhi National Open University
    Certificate, Certificate In Computing (C.I.C)
    2001 - 2002
  • Alfred Highschool - Bhuj
    ( H.S.C ) Higher Secondary Education, Commerce
    2000 - 2001
  • Shree Swaminarayan Vidhyalay - Bhuj
    S.S.C, Secondary Education
    1998 - 1999

Community

You need to have a working account to view this content. Click here to join now