Ali Masoudinejad

Technical Project Manager at ahc GmbH
  • Claim this Profile
Contact Information
Location
Stuttgart, Baden-Württemberg, Germany, DE
Languages
  • English Full professional proficiency
  • Arabisch Elementary proficiency
  • Deutsch Professional working proficiency
  • Persisch Native or bilingual proficiency

Topline Score

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

You need to have a working account to view this content. Click here to join now
Naser Masoudinejad

Ali is very detailed-oriented in his work and the main advantage is, he will finalize something like project or every stuffs that he gives in his work.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Credentials

  • C# Tutorial
    SoloLearn
    Dec, 2019
    - Sep, 2024
  • Engineering management in EPC projects
    Aryana Industrial & Research Group
    Aug, 2016
    - Sep, 2024
  • Intools Software
    Novin Parsian (مجتمع فنی عالی نوین پارسیان)
    Sep, 2007
    - Sep, 2024
  • PLC Operator
    Andisheh Sazan Sanat Barq
    Mar, 2007
    - Sep, 2024

Experience

    • Germany
    • Business Consulting and Services
    • 1 - 100 Employee
    • Technical Project Manager
      • Dec 2020 - Present

      • Projects: 1 - Tesla Gigafactory Berlin-Brandenburg (December 2020 to July 2022) 2 - Mercedes-Benz Digital Factory Campus (July 2022 to March 2023) 3 - Deutsche Bahn (Project Stuttgart Ulm) - Abstellbahnhof (From April 2023) • Projects: 1 - Tesla Gigafactory Berlin-Brandenburg (December 2020 to July 2022) 2 - Mercedes-Benz Digital Factory Campus (July 2022 to March 2023) 3 - Deutsche Bahn (Project Stuttgart Ulm) - Abstellbahnhof (From April 2023)

    • Electrical and Instrument engineer
      • May 2015 - Dec 2018

      • Electrical coordinator of a small hydropower plant located in Kenya (EPC project) - Aug 2015 to July 2018) • Cost estimating of tenders (preparing the offer with required documents) in the fields of power and control for oil&gas, Power plants and Rail projects ( May 2015 to Dec 2018) • Electrical coordinator of utility power distribution system (Medium and low voltage) in Refinery phase 22-24 in Asaluyeh (Iran) - July to August 2015 • Technical support of project managers in the fields of power and control issues • Technical interviewer of new subcontractor and employees Show less

    • Iran
    • Construction
    • 1 - 100 Employee
    • Electrical Engineer
      • Sep 2013 - May 2015

      • Design review, Control and approve the documents of electrical systems for a combined cycle power plant according to the specification of the project and international standards („KAHNOOJ” - 968MW - Iran) • Participation in factory acceptance tests for various electrical equipment like transformer, panels, generator circuit breaker (GCB), bus duct and cables • Design review, Control and approve the documents of electrical systems for a combined cycle power plant according to the specification of the project and international standards („KAHNOOJ” - 968MW - Iran) • Participation in factory acceptance tests for various electrical equipment like transformer, panels, generator circuit breaker (GCB), bus duct and cables

    • Iran
    • Retail Office Equipment
    • 1 - 100 Employee
    • Enginnering & Sales Expert
      • Mar 2013 - Aug 2013

      Sales and after-sales service (Total Gas Solution) Sales and after-sales service (Total Gas Solution)

    • Electrical Project Engineer
      • May 2009 - Feb 2013

      • Electrical project engineer in Seimare hydropower plant (480 MW - 3 vertical Francis unit) - Jan 2011 to Mar 2013• Inspection of some instruments in manufactures of “KOBOLD Messering GmbH” (Frankfurt and Sindelfingen – 10. to 15. Jan 2012) for “Seimare” hydropower plant• Electrical projects engineer in Sangtuda-2 hydropower plant for controlling the cable route documents and material estimating for installation of cable tray and ladder (Tajikistan - Dec 2010)• Electrical project engineer in Karun-4 hydropower plant (1000 MW - 4 Vertical Francis unit) - May 2009 to Nov 2010 Show less

    • Electrical Project Engineer
      • Dec 2010 - Jan 2011

      Review & control of Cable tray & ladder documents :Equipment Arrangement , Cable Tray & ladder , Cable laying & connection Document & Material

    • Electrical Project Engineer
      • May 2009 - Dec 2010

      Review & control of electrical documents, Managing of installation & executing activities, Control and approving of sub-contractors financial claims, following up of pre-commissioning and commissioning activities for power distribution system with following details:1-Review & control of electrical documents for:AC & DC power distribution panels for main and auxiliary system, Power and control cable list and their routes and connection diagrams, grounding and lightning, lighting, fire alarm and telecommunication systems2- Manage of installation & executing:Cable tray & ladder, laying & connection for power & control Cables, power and control panels, ancillary system equipment and expose grounding3- Pre-commissioning and commissioning:AC and DC distribution panels for auxiliary and ancillary systems4- Mission (Mar 2010): Document control for AC system in TANA SHPP in Tehran office (the power plant is located in KENYA) Show less

Education

  • Hochschule für Technik Stuttgart
    Master's degree, International Project Management
    2021 -
  • Sadjad University of Technology
    Bachelor's degree, Telecommunication, General
    2001 - 2006
  • Din and Danesh
    diploma, Theoretical and Mathematical Physics
    1998 - 2001

Community

You need to have a working account to view this content. Click here to join now