Ali Doğru

Survey Group Chief at Özyazıcı İnşaat
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Istanbul, Turkey, TR

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Türkiye
    • Construction
    • 1 - 100 Employee
    • Survey Group Chief
      • Jul 2014 - Present

      İstanbul, Türkiye

    • Türkiye
    • Construction
    • 700 & Above Employee
    • Lead Survey Engineer
      • Nov 2011 - Jul 2014

      Kocaeli, Turkey • Tupras RUP Project Owner Owner Under Tecnicas Reunidas Company as Controller Tekfen Company Contractor (500.000.000 Dolar) • Head of Land Surveying department ,responsible of 5 teams of surveyor, preparing and checking drawings, preparing surveying data coordinates, drawing for layout, surveying inspections. Follow up with consultant, surveying teams and site engineers. Examination of site work. Volume calculation and quantity surveying. Reporting the all final inspection survey related… Show more • Tupras RUP Project Owner Owner Under Tecnicas Reunidas Company as Controller Tekfen Company Contractor (500.000.000 Dolar) • Head of Land Surveying department ,responsible of 5 teams of surveyor, preparing and checking drawings, preparing surveying data coordinates, drawing for layout, surveying inspections. Follow up with consultant, surveying teams and site engineers. Examination of site work. Volume calculation and quantity surveying. Reporting the all final inspection survey related the QA-QC standarts. Show less

    • Türkiye
    • Construction
    • 700 & Above Employee
    • Lead Survey Engineer
      • Sep 2010 - Jul 2011

      Azerbaijan-Baku • WC-PDQ Off-Shore Platform Owner BP Under TEKFEN Company AMEC AZFEN Consortium • Planning, coordinate and supervise the work as survey crew. • Execute layouts on steel fabrication shops survey as preweld and post weld. Collected data was processing on 3d models and then reported the Construction. On this principle all the platform modules fabricated one by under survey group contol. On site the modules joins other modules related to survey reports. • Execute on platform , all… Show more • WC-PDQ Off-Shore Platform Owner BP Under TEKFEN Company AMEC AZFEN Consortium • Planning, coordinate and supervise the work as survey crew. • Execute layouts on steel fabrication shops survey as preweld and post weld. Collected data was processing on 3d models and then reported the Construction. On this principle all the platform modules fabricated one by under survey group contol. On site the modules joins other modules related to survey reports. • Execute on platform , all stake-out equipments vessels pipecaks pumps etc • Preparing sketches for Heavy Lifting Group Show less

    • Türkiye
    • Construction
    • 700 & Above Employee
    • Lead Survey Engineer
      • Jan 2009 - May 2009

      Saudi Arabia • Ma aden Phosphoric Acid Plant Project (240.000.000 Dolar) • Planning, coordinate and supervise the work of several field survey crews. • Execute field survey layout of centerlines, elevations, offset points and reference lines of structures as per plan such as pipe racks, equipment vessels, process tanks, etc. Perform initial and final survey inspection of all civil works, checking the precise location of anchor bolts and templates before concrete pouring. • Work as also civil… Show more • Ma aden Phosphoric Acid Plant Project (240.000.000 Dolar) • Planning, coordinate and supervise the work of several field survey crews. • Execute field survey layout of centerlines, elevations, offset points and reference lines of structures as per plan such as pipe racks, equipment vessels, process tanks, etc. Perform initial and final survey inspection of all civil works, checking the precise location of anchor bolts and templates before concrete pouring. • Work as also civil tecnical office engineer ; quantity and procurement of rebars, writing tecnical queries for clashed foundations and missed details. • Due to Military Service vacation on Turkey I left from project seven months later.

    • Lead Survey Engineer
      • Aug 2006 - Jan 2009

      Saudi Arabia • Rabigh Refinery Transformation to PetroRabigh PetroChemical Utilities and Offsites Project (200.000.000 Dollar) • Planning, coordinate and supervise the work of several field survey crews. • Execute field survey layout of centerlines, elevations, offset points and reference lines of structures as per plan such as pipe racks, equipment vessels, process tanks, etc. Perform initial and final survey inspection of all civil works, checking the precise location of anchor bolts and templates… Show more • Rabigh Refinery Transformation to PetroRabigh PetroChemical Utilities and Offsites Project (200.000.000 Dollar) • Planning, coordinate and supervise the work of several field survey crews. • Execute field survey layout of centerlines, elevations, offset points and reference lines of structures as per plan such as pipe racks, equipment vessels, process tanks, etc. Perform initial and final survey inspection of all civil works, checking the precise location of anchor bolts and templates before concrete pouring. • Prepare survey reports, miscellaneous drawing, sketches and as built to be submitted for design purposes and quantity calculation

    • Construction
    • 700 & Above Employee
    • Survey Engineer
      • Oct 2005 - Aug 2006

      Istanbul, Turkey • Marmaray İmmersed Tube Tunnel on İstanbul Bosphorus • Perform daily Current Survey and Bathymetric Survey , processing and reporting. • Calculations for all setting out and earthworks for construction • Digital Terrain Modelling for designs and quantities • Navigating the platform during teh excavation Works and CPT

    • Türkiye
    • Construction
    • 200 - 300 Employee
    • Survey Engineer
      • May 2005 - Nov 2005

      Kocaeli, Turkey • Derince D100 Road Underground Pass and Crossroads • Plan, coordinate and supervise the work of several field survey crews. • Execute survey layout of road centerlines, checking of levels along cut and fill sections, slopes, bridge foundation and abutment. • Coordinate with clients, consultants, field engineers concerning work standards, quality assurance and safety to ensure timely program of activities • Prepare survey reports, miscellaneous drawing, sketches and as built to be… Show more • Derince D100 Road Underground Pass and Crossroads • Plan, coordinate and supervise the work of several field survey crews. • Execute survey layout of road centerlines, checking of levels along cut and fill sections, slopes, bridge foundation and abutment. • Coordinate with clients, consultants, field engineers concerning work standards, quality assurance and safety to ensure timely program of activities • Prepare survey reports, miscellaneous drawing, sketches and as built to be submitted for design purposes and quantity calculation. • Perform mass earthwork volume calculation by surveying software Show less

Education

  • Yildiz Technical University
    Geodesy and Photogrammetry Engineering, Geodesy and Photogrammetry Engineering
    2000 - 2005
  • Turgut Reis Lisesi
    High School/Secondary Diploma Programs
    1996 - 2000

Community

You need to have a working account to view this content. Click here to join now