ALİ ALQAYSİ

instrumentation and control technetion team leader at Baghdad comp.LTD
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Iraq, IQ
Languages
  • English Professional working proficiency
  • Portuguese Professional working proficiency
  • German Elementary proficiency
  • Arabic Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Oil and Gas
    • 100 - 200 Employee
    • instrumentation and control technetion team leader
      • Jan 2016 - Present

      termination and commissioning TCP, FIER FIGHTING and MCC panels mark6e control, field and turbine devises for oil pump station south Iraq. Calibration instruments, pressure temperature switches, and transmitters. --- Rehabilitation project of gas turbines type MS5002J and oil pump for Four units frame 5 (GE/NUOVO PIGNONE).1- Installation unit control panels UCS (MARK VIe), MCC and DCP and termination control wiring Betweens.2- Installation network switches cabinet and connection Ethernet cable with units HMI and UCS controller and install IP address for each devices in HMI software.3- Replacement and pulling control cables from control panels to instrument JB and Termination Control wiring of control panels and field instruments.4- Calibration and Installation control equipments and instruments for all units system Of UCS panel, turbine, oil pump and crude oil field process.5- Control Wiring dry loop check test, insulation test and check UCS power supplies

    • control and electric team leader
      • Sep 2011 - Dec 2015

      Rehabilitation five Gas turbine, (fr 1,fr 3) installing andTermination and commissioning MCC, DCP UPS, FIER FIGHTING, TCP, DCS panels mark6e control, field and turbine devises for oil pumpstation south Iraq. A-Rehabilitation project of gas turbines type MS1002J and centrifugal gas compressor PCL503-4/20 Four units(GE/NUOVO PIGNONE) . 1 -Termination Control wiring of control panels and field Instruments and network Ethernet Cables of units HMI, network switches and UCS controller MARK Vie2- Instruments calibration for systems of turbine, gas compressor and gas process.3- Start up and commissioning DCP panels (rectifier and inverter) .4- Power up unit control panels (UCS) 5- Construction, installation and commission work of:Rehabilitation project of gas turbines type MS3002J and crude oil pump two units (GE/NUOVO PIGNONE).B- Rehabilitation project of gas station field and upgraded controller to DCS (MARK Vie)/ GE Measurement &control-Bahrain-1- Pulling and termination works of control cables between DCS panels and field skids& another control panels2- Pre-commissioning activates and instruments calibration. 3- Power up DCS panel, HMI, UPS, and MCC station4- Commission and operation-Air compressor skid type (ATLAS COPCO) to provide air to field pneumatic valves and gas Heater.-Gas heater skid and control panels’ type (F.A.T.I) to control the gas heater.

    • Education Administration Programs
    • 300 - 400 Employee
    • sub-contractor
      • Mar 2008 - Aug 2011

      installation & termination switch gear, UPS andpower, control panels. installation & termination switch gear, UPS andpower, control panels.

    • Independent Contractor
      • Oct 2005 - Jan 2008

      Installation & repairing, maintenance forHVACs, cold rooms, chillers, cooling tower, package unit, split unit, cleaning room . Installation & repairing, maintenance forHVACs, cold rooms, chillers, cooling tower, package unit, split unit, cleaning room .

    • Government Employee
      • Nov 1990 - Apr 2004

      Installation & maintenance all refrigerationand air condition systems. Installation & maintenance all refrigerationand air condition systems.

Education

  • Baghdad Technology institute
    Technical diploma, Heating, Ventilation, Air Conditioning and Refrigeration Engineering Technology/Technician
    1988 - 1990

Community

You need to have a working account to view this content. Click here to join now