Alfonso G. Rademaker M.E.

Senior Mechanical Technician at Carlisle Energy Group, Inc.
  • Claim this Profile
Contact Information
Location
Greater Houston
Languages
  • English -

Topline Score

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

You need to have a working account to view this content. Click here to join now
Mohamed Elshikeh

One of very talented person and professional In all ways. Very proud to have him with us. Kudos to you!

Alberto Jose Gomez Araviche

EXCELENTE PROFESIONAL, PROACTIVO, EMPRENDEDOR, HONESTO Y HUMILDE..

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Credentials

  • Basic Fire Fighthing & Prevention
    Agora Training Centre
    Nov, 2020
    - Sep, 2024
  • Basic Plus CRP AED First Aid for Adults
    Agora Training Centre
    Nov, 2020
    - Sep, 2024
  • Basic H2S Course Opito 9014
    GTSC.KSA
    Jan, 2020
    - Sep, 2024

Experience

    • United States
    • Oil and Gas
    • 1 - 100 Employee
    • Senior Mechanical Technician
      • Jan 2023 - Present

      Senior Mechanical Technician in Construction project of Coiled Tubing Equipment for the company Bedrock Enegy Senior Mechanical Technician in Construction project of Coiled Tubing Equipment for the company Bedrock Enegy

    • Saudi Arabia
    • Oil and Gas
    • 1 - 100 Employee
    • Mechanical Maintenance Supervisor
      • Jan 2020 - Jul 2021

      I was worked as a Mechanical Maintenance Supervisor applying planned preventive maintenance and repairs failures of corrective maintenance to high pressure pumping equipment, 1050 cfm air compressors, sand filter and well testing, steam generator for offshore and onshore work for our clients NESR, OilServ-Zamil, Saudi Aramco and HLB. I was worked as a Mechanical Maintenance Supervisor applying planned preventive maintenance and repairs failures of corrective maintenance to high pressure pumping equipment, 1050 cfm air compressors, sand filter and well testing, steam generator for offshore and onshore work for our clients NESR, OilServ-Zamil, Saudi Aramco and HLB.

    • Hospitality
    • 700 & Above Employee
    • Maintenance Preventive Coordinator
      • Aug 2018 - Dec 2019

      I was worked as Preventive Maintenance Coordinator and Training of the Tourist Complex conformed by 04 main hotels (Tulum, Akumal, Cobá and Sian Kaán) reporting directly to the Maintenance Director of the complex, managing and coordinating the execution and planning of preventive maintenance according to to the master plan of the complex, carrying out the planned maintenance activities in the areas assigned as air conditioning (chiller, minisplit, packages, extractors, freezing / conservation chambers and cold rooms), hydraulic water piping system of the pumping equipment (electromechanical workshop and pumps) and reconditioning of kitchen equipment (ovens, fryers, dishwashers, tilting pans, etc.) of the main kitchens and theme restaurants, in addition to guaranteeing the effective execution of the continuous Deep Cleaning plan of all the kitchens. Responsible for the general direct supervision of three contracted services contracts and a group of 20 direct employees plus supervisors of areas in charge of maintenance tasks; coordinate and guarantee the fulfillment of the programming and the monthly execution of the programmed activities, elaborate the closing of the month of the maintenance management, execute and follow up the order request (procurement) of spare parts and / or order of services required by each one of the areas. Show less

    • United Kingdom
    • Chemical Manufacturing
    • 700 & Above Employee
    • Turbomachinery Specialist
      • Apr 2018 - Jul 2018

      I worked as a Specialist Engineer in the field and in direct control in activities related to Major Inspection (MI3) in May-June 2018 of the GTG-03 carried out by the company General Electric (GE) contracted by The Linde Group for the General Electric Turbine Model 7EA-GEMS7001 (EA) and Generator 72 MW General Electric Model 7A6-GEA13489A, whose activities principal was the total disarmament of the entire turbine, replacement of power turbine blades and hot side nozzles, improvements in seals and modernization in combustion chambers, replacement of stationary vanes in the compression stages and bearings. By another side in the electric generator, it was replaced total stator, rotor and exciter by new components. Finally the vibration monitoring system was updated, protections to the generator and the modernization of the speed control to the latest model GE Mark VIe Show less

    • Mexico
    • Oil and Gas
    • 500 - 600 Employee
    • Senior Resident Engineer
      • Dec 2017 - Apr 2018

      I worked as a Resident Engineer for the Projects Department in partnership with the company DIAVAZ Integrity, managing and carrying out the execution in the Dos Bocas Maritime Terminal - TMDB for Pemex Logistics of the Study of the Soil Permeability Coefficient through the execution of mixed soil survey at 5 and 10 meters depth in the safety dams in the 17 storage tanks of 500 thousand barrels and 04 Gun Barrel tanks of 200 thousand barrels. Another relevant activity within the work experience was the preparation of the basic / conceptual design and the calculation memory of a technical proposal for the construction of two new oil storage tanks of 200 and 500 thousand barrels respectively, which will provide an increase in the management, treatment, refining and export of oil to different destinations in the Gulf of Mexico and the Caribbean, whose scope of work includes the construction of atmospheric tanks, containment dikes with their drains, which include civil, electrical and instrumentation, mechanical , prevention of corrosion, and the application of non-destructive tests to welds and carbon steel elements. Show less

    • Venezuela
    • Oil and Gas
    • 100 - 200 Employee
    • Gerente de Mantenimiento
      • Mar 2017 - Dec 2017

      I perform as a Mechanical Maintenance Manager executing and planning preventive and corrective maintenance in accordance with a strategic and efficient plan for Wireline testing & logging and coiled tubing equipment west division, to coordinate all the maintenance, procurement and asset management activities, to maximize the reliability and availability of these equipment to minimize failures and ensure operational continuity with optimal costs. I perform as a Mechanical Maintenance Manager executing and planning preventive and corrective maintenance in accordance with a strategic and efficient plan for Wireline testing & logging and coiled tubing equipment west division, to coordinate all the maintenance, procurement and asset management activities, to maximize the reliability and availability of these equipment to minimize failures and ensure operational continuity with optimal costs.

    • Oil and Gas
    • 1 - 100 Employee
    • Reliability Engineer
      • Apr 2015 - Apr 2016

      Reliability Engineer contract for Pemex Refining running for Subdirección de Almacenamiento y Reparto (SAR) Gerencia de Almacenamiento y Reparto Golfo, Reliability methodology applied to the process of elimination of defects (PED ) using the methodology Root Cause Analysis (RCA ) and Reliability Centered Maintenance (RCM ) in the auto Fuel Tanks Truck distribution, , critical equipment and auxiliary Dynamical critical industrial power generation gas turbines General Electric (GE) LM2500 aeroderivative coupled to electrical generators 24MW in Terminals (TAR's) Campeche, Puebla, Salina Cruz, Villahermosa and Veracruz. Show less

    • Higher Education
    • 1 - 100 Employee
    • Specialist Expert Level Operational Reliability
      • Jul 2014 - Dec 2014

      I worked as a group leader for Phase Verification and Integral Implementation of plans of continuous improvement Operating System Operational Reliability (SCO) the Litoral de Tabasco (APLT) in Platform Delta and in Phase Implementation for Litoral platform-A and Battery Separation TMDB, all belonging to Pemex (Petróleos Mexicanos) Navy Region Southwest Northeast, allowing production Systems and Process capable of achieving production goals and fulfill the goals of the Comprehensive Plan Management Improvement "PIMG". Field application to solve problems with the application of methodology Reliability Root Cause Analysis (RCA) and Reliability Centered Maintenance (RCM) at oil installations mainly in dynamic teams in Gas Turbines General Electric (GE) LM2500 with power turbine coupled to Nuovo Pignone centrifugal compressors in 02 modules (7 and 8) Gas compression. Show less

    • Mexico
    • Oil and Gas
    • 1 - 100 Employee
    • Senior Consultant Reliability and Safety, Health and Environmental Protection
      • Apr 2014 - Jul 2014

      I worked as a consultant in Phase Verification and Implementation in Installing New and Comprehensive Implementation plans Continuous Improvement Operation System Operational Reliability (SCO) in the Assets Litoral Tabasco (Platform Abkatún Delta and New Coastline Alfa) in the Gulf of Mexico belonging to Pemex (Petroleos Mexicanos) Navy Region South West North. Specialist in implementing Methodology Reliability Root Cause Analysis (RCA) and Reliability Centered Maintenance (MCC) in Gas Turbine General Electric (GE) LM2500 with power turbines coupled centrifugal compressors Nuovo Pignone in 02 modules (7 and 8) Gas Compression and Rolls Royce 501-KB 2,650 KW for power generation in the Oil & Gas facilities. Show less

    • Senior Consultant at Reliability Project (SCO)
      • Aug 2013 - Mar 2014

      I worked as a consultant in the process of verification and Application Comprehensive Continuous Improvement plans Operational Operational Reliability System (SCO) in Production Assets Abkatun Pol-Chuc and Litoral Tabasco (Platforms ABKATUN Alpha and Delta) in the Gulf of Mexico belonging to the Pemex (Petróleos Mexicanos) of South West Marine Region Northeast, allowing production systems and process to achieve production targets company focused on providing a Zero Failure Support for verification of Contexts operating, operating parameters and Driveability Methodologies Application to Pipelines and Equipment Dynamic / Static. Methodology Reliability Root Cause Analysis (RCA) and Reliability Centered Maintenance (MCC) in Gas Turbine General Electric (GE) LM2500 with power turbines coupled centrifugal compressors Nuovo Pignone in 02 modules (7 and 8) Gas Compression for Abkatun Delta, also in turbines General Gas Electric (GE) LM2500 with power turbines coupled to centrifugal compressors Demag Delaval in modules (5 and 6) Abkatun Alfa and Rolls Royce 501-KB 2.650 KW for power generation in Oil & Gas facilities. Show less

    • Mexico
    • Oil and Gas
    • 1 - 100 Employee
    • Senior Consultant
      • Aug 2012 - Dec 2012

      Technical Advisor system deployment Operational Reliability of Pemex (Petroleos Mexicanos) in the Process Center Northeast Marine Region, specifically in the processing center in Rebombeo platform to achieve Operational Reliability levels of production systems that achieve the production goals focusing the business to zero failures, by improving human reliability, Process Reliability, Equipment Reliability and Duct Design and Reliability. In my rotation in Mexico and Venezuela, I worked as a Senior Consultant Reliability Among the main activities I was viewer problems and identify recurring faults in rotating equipment found in Rebombeo Processing Center (Pemex), which are installed 10 packages of which 08 Turbo pumps are Turbine Ruston Mod.TB-5000 5400 HP centrifugal pumps coupled to United -150 and 02 Turbo pumps are Solar Turbines Mod. Taurus 60 7700 HP coupled to Sulzer Pumps-300 used for the relief of pressure loading and two pipelines, turbine generators further 02 teams with Solar Turbines Saturn Mod 20 move electric generators for power supply of the Center for Process. I worked on using Reliability methodologies, using Root Cause Analysis (RCA), Reliability Centered Maintenance (MCC) and identifying critical equipment and component most failures that it was made for a specific period of about 5 months. Show less

    • Norway
    • Oil and Gas
    • 1 - 100 Employee
    • R&M Mechanic Master II
      • Mar 2012 - Jul 2012

      I worked Corrective Maintenance Supervisor equipment cementing, stimulation and coiled tubing onshore & offshore the West District, performing mechanical repairs and troubleshooting. Execute and coordinate a management system for logistics planning and preventive maintenance on all equipment. Authorized personnel to perform maintenance and repair of faults in hydraulic systems and components. I worked Corrective Maintenance Supervisor equipment cementing, stimulation and coiled tubing onshore & offshore the West District, performing mechanical repairs and troubleshooting. Execute and coordinate a management system for logistics planning and preventive maintenance on all equipment. Authorized personnel to perform maintenance and repair of faults in hydraulic systems and components.

    • France
    • Packaging & Containers
    • 1 - 100 Employee
    • Lead Mechanic - E
      • Jun 2008 - Mar 2012

      Preventive Maintenance Supervisor equipment cementing, stimulation and coiled tubing onshore & offshore the West District, performing mechanical repairs and troubleshooting. Executes and coordinates a management system for logistics planning and preventive maintenance of all equipment in Division Mechanical Maintenance Management.

    • Mechanical Technician I & II
      • Mar 2007 - Jun 2008

      Person in charge of the Execution workings of Preventive Maintenance to ground equipment and in barges in units for the cementation, stimulation and coiled tubing of the company based on a plan of pre-established maintenance and fulfilling the standard practices of maintenance PM1 and PM2, as well as to execute workings of mechanical repair and correction of faults in these equipment.

    • Maintenance Supervisor
      • Jul 2005 - Jun 2006

      I supervised and coordinated works of maintenance of ship equipment and repair of barges, additionally to execute and to plan workings of repair of heavy equipment, centrifugal superchargers and float light. To handle assigned personnel to the mechanics management to execute plans of medium repair and preventive. I executed administrative activities and control of activities, flow of box and handling of resources of the management. At the moment I carry out like Head of Wharf in the execution of the medium repair and preventive of ship units boats, tugboats, barge crane of construction and all the referring one to the coordination of activities of logistic, provision of equipment and personnel of different crafts to undertake maintenance activities Show less

    • Venezuela
    • Oil and Gas
    • 700 & Above Employee
    • Onshore Projects Coordinator
      • Feb 1999 - Feb 2003

      I coordinated, directed and supervised mechanical projects of physical and financial the budget of investments as much, including the processes of tries, leading a team of 5 professionals. I redesigned and I implanted a new system for the planning and control of projects within facilities in TDN of tanks and ports of embarkation, including controls of time, costs, resources and materials. I prepared and made engineering specifications, calculations and calculations of structures of costs for the processes of contractor elaboration of grouped projects, I physically supervised smaller projects in field, directing to contracted personnel of different crafts. I acquired experience to work in facilities in areas classified (stations of flow, steam plants and manifold of harvesting, among others) for the development of maintenance activities. Show less

    • Maintenance Supervisor
      • Apr 1997 - Jan 1999

      I executed workings of direct supervision in the execution of activities of mayor / minor maintenance in the repair of structures and superstructures of naval boats. I executed and I coordinated works in the reconstruction of boat that were out of service (towing obsolete) and directed groups of 40 people in 2 turns. I acquired practical knowledge for the medium repair of dynamic equipment, specifically the systems of propulsion (motor and transmissions) and the analysis of faults. Special Assignment San Francisco Workshop of Rotating Equipment - Maraven SA. My field experience in the oil industry was in the fusion Lagoven-Maraven (PDVSA) in the central workshops rotating equipment, it could meet the Westinghouse Turbine repair mod. W101 and W191, which belonged to gas compression Plants Tia Juana 1 and 2 in Lake Maracaibo, whose activity was most important corrective maintenance, where there was rotor balance, changes in rotor and stator blades, and labyrinth seals , I also know the Gas generators repairs Mod Rolls Royce Avon and RB211, both were moving gas generators power turbines Cooper-Bessemer RT-48 & RT-61 and Dresser-Clark DJ125. Then go to work on Steam Plant facilities used for secondary recovery of oil, where I know the maintenance and repair of steam Turbine Worthington & Terry design radial two stages and all its components, widely used to move feed pumps boilers. Show less

    • Professor University
      • Nov 1993 - Apr 1998

      I began my workings like Helping Educational under an Agreement with Lagoven soon to carry out to me like ordinary professor Instructional degree to exclusive dedication in the Chair Material for Engineering. I was Founding of the Laboratory of Materials of this University in the Eastern Coast of the Lake, Edo. Zulia I began my workings like Helping Educational under an Agreement with Lagoven soon to carry out to me like ordinary professor Instructional degree to exclusive dedication in the Chair Material for Engineering. I was Founding of the Laboratory of Materials of this University in the Eastern Coast of the Lake, Edo. Zulia

Education

  • Universidad del Zulia
    Postgraduate Specialization in Corrosion & Materials, Universidad del Zulia
    1995 - 1998
  • Universidad del Zulia
    Bachelor of Science in Mechanical Engineer
    1987 - 1993

Community

You need to have a working account to view this content. Click here to join now