Alexander Gershanov

Lead Process Engineer at Lilac Solutions, Inc.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
US
Languages
  • English Native or bilingual proficiency
  • Russian Professional working proficiency
  • French Elementary proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Safe Use of Biological Safety Cabinets
    McGill University
    Jun, 2013
    - Nov, 2024
  • Hazardous Waste Management Disposal Training for Laboratory Personnel
    McGill University
    May, 2013
    - Nov, 2024
  • WHMIS
    McGill University
    May, 2013
    - Nov, 2024
  • Introduction to Biosafety
    McGill University
    Apr, 2013
    - Nov, 2024

Experience

    • United States
    • Mining
    • 100 - 200 Employee
    • Lead Process Engineer
      • Jul 2022 - Present

    • Process Engineer
      • Sep 2018 - Jul 2022

      Establishing and scaling new manufacturing line for Lilac's proprietary ion exchange beads - Responsible for conception and design of new chemical unit operations, sourcing/fabricating all parts, assembly, operations, and optimization of new units - Experienced in PLC automation, low/high voltage electrical wiring and panel construction, process PID control, hazardous material conveyance, machine design/maintenance, process scale up from bench to pilot and commercial scale

    • United States
    • Biotechnology Research
    • 700 & Above Employee
    • Cellulosic Engineering Technician
      • May 2018 - Sep 2018

      - Hands on operations role at the first successful full scale cellulosic ethanol plant - Performed maintenance and handled DCS-control of high temperature/pressure and highly acidic unit ops - Hands on operations role at the first successful full scale cellulosic ethanol plant - Performed maintenance and handled DCS-control of high temperature/pressure and highly acidic unit ops

    • Canada
    • Media Production
    • 1 - 100 Employee
    • Project Manager
      • Jul 2016 - Mar 2018

      • Facilitated company’s 500% expansion in 9 months, adding 320 locations and entering 2 new markets • Coordinated system installations and handled troubleshooting of technical/mechanical issues 7 days a week • Developed standardized technical manual for system installations, incorporating future scalability considerations • Facilitated company’s 500% expansion in 9 months, adding 320 locations and entering 2 new markets • Coordinated system installations and handled troubleshooting of technical/mechanical issues 7 days a week • Developed standardized technical manual for system installations, incorporating future scalability considerations

    • Process Design Engineer
      • Sep 2014 - Apr 2015

      • Led team in designing a 90 mega ton per year sulfuric acid plant from concept through design phase • Applied Aspen HYSYS expertise to model production process to meet realistic conversion efficiencies • Delivered 300-page report, including AutoCAD drafted PFDs/P&IDs, economic analysis, and equipment briefs • Led team in designing a 90 mega ton per year sulfuric acid plant from concept through design phase • Applied Aspen HYSYS expertise to model production process to meet realistic conversion efficiencies • Delivered 300-page report, including AutoCAD drafted PFDs/P&IDs, economic analysis, and equipment briefs

    • Canada
    • Non-profit Organization Management
    • 1 - 100 Employee
    • President
      • Apr 2014 - Apr 2015

      • Restored an inherited 20% budget deficit to a 20% surplus in one semester without reducing services• Spearheaded a major $24,000 improvement to student space• Restructured council portfolios, improving work distribution and optimizing group productivity

    • Vice President, Internal
      • Apr 2013 - Apr 2014

      • Raised $3000 in 5-hour event through careful event organization, promotion, and supervision• Created 2 new recurring events, increasing student extracurricular involvement

    • Chief Event Planner
      • May 2013 - Sep 2013

      • Organized business and logistics of $65,000, 4-day event, managing 150 staff and liaising over 20 businesses• Improved organizational process, saving time and money for future years’ committees

    • Canada
    • Higher Education
    • 700 & Above Employee
    • Environmental Remediation Researcher
      • May 2013 - Nov 2014

      • Discovered and modelled improvements to contaminated groundwater remediation technique • Co-authored two journal articles in Environmental Science & Technology and Environmental Science: Nano • Trained extensively in microbiology techniques while culturing bacteria and isolating bacteriophage • Discovered and modelled improvements to contaminated groundwater remediation technique • Co-authored two journal articles in Environmental Science & Technology and Environmental Science: Nano • Trained extensively in microbiology techniques while culturing bacteria and isolating bacteriophage

    • Event Supervisor
      • May 2014 - Sep 2014

      • Coordinated a $230,000 budget, 4-day event with 5000 participants and over 50 businesses • Coordinated a $230,000 budget, 4-day event with 5000 participants and over 50 businesses

Education

  • McGill University
    Bachelor of Engineering (B.Eng.), Chemical Engineering, Biotechnology Minor
    2011 - 2015
  • Newton South High School
    2009 - 2011

Community

You need to have a working account to view this content. Click here to join now