Alexander Sibaja

Mechanical Designer at Campos Engineering, Inc.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Mechanical Or Industrial Engineering
    • 1 - 100 Employee
    • Mechanical Designer
      • Jul 2010 - Present

      • Design mechanical and plumbing systems for several projects with Dallas Independent School District (DISD) which includes retrofits and new additions. The mechanical systems used are mainly VAV hydronic systems comprised of chillers, cooling towers and boilers. Packaged DX Split systems with electric or gas reheat are also used but with less frequency. Plumbing systems include sanitary, storm and domestic water system for schools. • Other projects including new construction or plumbing and mechanical upgrades are: Cotton Bowl Stadium, Dallas Museum of Art, North Texas University, Flower Mound Precinct 4, Sheppard Airforce Base, Wichita Falls Municipal Airport, Meacham Municipal Airport, Shiloh Pump Station, City of Dallas District 6 Service Center, also several projects for UT Southwest Medical System and various medical offices throughout the Metroplex. • In charge of plumbing design for upgrades to Terminal E Satellite and Main Terminal at DFW International Airport in accordance of the TRIP Program. High level interaction with architects and Airport Officials to ensure correct design according to Airport Guidelines and adopted Codes.

    • United States
    • Engineering Services
    • 1 - 100 Employee
    • Mechanical Designer
      • Sep 2007 - Jan 2010

      • Designed plumbing systems for new facilities. Plumbing included hot and cold water, waste and vent piping as well as acid waste piping. Also designed gas piping associated with those facilities. • Designed HVAC system for new facilities. Systems included Rooftop Units, Air Handling Units and CRAC Units and plumbing/HVAC systems for building retrofits and additions. • Participated actively in the CA process by conducting site visits, preparing reports, reviewing product submittals and answering RFI’s. • Work experience primarily on educational facilities ranging from Kindergarten to College campuses. • Interacted with architects, owners, City Officials, contractors and other engineering disciplines in order to guarantee best design possible.

  • Raytheon Polar Services
    • Centennial, Colorado/ USAP Antarctica
    • Facilities Engineer/Fire Protection Specialist
      • Feb 2005 - Feb 2007

      Member of FEMC team (Facilities, Engineering, Maintenance and Construction) providing services to the National Science Foundation and its three Antarctic Stations. Deployed to McMurdo Station and South Pole Station during Austral summer to assist with several projects included in copy of resume. Member of FEMC team (Facilities, Engineering, Maintenance and Construction) providing services to the National Science Foundation and its three Antarctic Stations. Deployed to McMurdo Station and South Pole Station during Austral summer to assist with several projects included in copy of resume.

  • SimplexGrinnell
    • Lewisville, TX
    • Fire Sprinkler Designer
      • Sep 2002 - Jul 2004

      • Modified existing and designed new Fire Sprinkler Systems for commercial and residential installation. • Managed all aspects of project design, including careful oversight of internal and external resources. • Collaborated with sales force and contractors to collect necessary information. • Conducted field surveys on project site to determine conditions and assess needs. • Obtained installation permits for respective Authority Having Jurisdiction (AHJ). • Designed fire sprinkler system in accordance with National Fire Protection Association (NFPA) 13, NFPA 13R, NFPA 13D standards and other standards and codes required by AHJ. • Presented fire sprinkler design to office’s design department for suggestions, corrections, and validation; presented completed plans to the AHJ for approval. • Submitted list of required materials for each project to purchasing department. • Prepared closeout documents for fire sprinkler and fire alarm systems following final inspection.

Education

  • The University of Texas at Arlington
    BS, Mechanical Engineering
    1999 - 2001

Community

You need to have a working account to view this content. Click here to join now