Alex Santhosh

Fit Out Manager at Auriga International Management Consultants
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Abu Dhabi Emirate, United Arab Emirates, AE

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Arab Emirates
    • Hospitality
    • 1 - 100 Employee
    • Fit Out Manager
      • Sep 2019 - Present

       Preparing, Scheduling, Coordinating and Monitoring the assigned engineering projects.  Develops project objectives by reviewing project proposals and plans and conferring with management.  Determines project schedule by studying project plan and specifications, calculating time requirements, and sequencing project elements.  Interacting daily with the clients to interpret their needs and requirements and representing them in the field.  Assign responsibilities and mentor project team.  Cooperate and communicate effectively with manager and other project participants to provide assistance and technical support.  Review engineering deliverables and initiate appropriate corrective actions.  Perform risk management to minimize project risks.  Check the electrical load calculations after the submission of consultants drawings  Perform the heat load calculations after the submission of contractor HVAC drawings  Prepare all the pending works list for the fit out works for the various projects  Review the drawings presented by the contractor and give necessary comments if needed.  Follow up the site works daily and prepare the report.  Follow up with contractor to finish the works as per the timeline.  Provide necessary assistance to fit out contractor and the kitchen suppliers to coordinate together.  Compare the quotes from the various suppliers and prepare the comparison report  Check the MEP and 2D Drawings are completely per the client approved 3d rendered design.  Check with suppliers / contractors and request for quotations and competitive prices.  Assist with the kitchen supplier for the Equipment list preparations.  Each layouts and drawings request client for the approvals and give necessary information.  Supervising the workers and their daily attendance including with the daily work report while in site.  Tracing out the issue help the team to tackle easier while working in site. Show less

    • Electrical Engineer
      • Jul 2017 - Jun 2019

      • Supervised in Laying of Electrical Cables and Panel Erections in Industrial sites. • Tracing out the design and assisted with the client engineer for PLC panel cable terminations. • Supervised in Laying of Electrical Cables and Panel Erections in Industrial sites. • Tracing out the design and assisted with the client engineer for PLC panel cable terminations.

    • India
    • Mining
    • 1 - 100 Employee
    • Electrical Engineer
      • Jul 2017 - Jul 2018

    • Utilities
    • 1 - 100 Employee
    • Project Engineer
      • Jan 2016 - Jun 2017

      • Assisted the Engineering team for Planning, Design and Implementation of Electrical systems including Substation layout, Electrical layout, Generator Installation. • Designing of lighting, internal wiring and low voltage systems. • Preparation of estimate of various works in the site and preparing work order for the same. • Final binding of completed tender with a good competitive price. • Electrical Load Calculations, Heat Load calculations • Supervised in Laying of Electrical Cables and Panel Erections in Industrial sites. • Obtained a wide knowledge in Cranes, Compressors, Motors, Transformers and Furnaces. • Coordinated the works with sub-contractors • Reviewing the kitchen Equipment layouts, MEP drawings from the consultants/contractors for final revised drawings before authority’s submission. • Supervising the workers and their daily attendance including with the daily work report. • Managed various projects in UAE . • Tracing out the design and assisted with the client engineer for PLC panel cable terminations. • Final binding with the BOQ and JMS sheets Show less

    • United States
    • Construction
    • 1 - 100 Employee
    • eletrical system design engineer
      • Sep 2015 - Dec 2015

Education

  • Mahatma Gandhi University
    Bachelor of Technology - BTech, Electrical and Electronics Engineering
    2011 - 2015

Community

You need to have a working account to view this content. Click here to join now