Alessio Menghini
Tunnel Manager at Riverlinx- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Inglese Full professional proficiency
-
Spagnolo Native or bilingual proficiency
-
Italiano Native or bilingual proficiency
Topline Score
Bio
Credentials
-
CEng MICE - Chartered Engineer
Institution of Civil Engineers (ICE)Jan, 2022- Oct, 2024 -
PMQ
APMMar, 2019- Oct, 2024 -
CANDY
Construction Computer Software (Pty) Ltd -
CSCS CARD
CITB -
FIRST AID AT WORK
CHSG Construction Health and Safety Group -
MANAGING SAFELY IN CONSTRUCTION
IOSH -
TUNNEL SAFETY CARD
CITB -
UNDERGROUND HEALTH & SAFETY COURSE
Institution of Civil Engineers
Experience
-
Riverlinx
-
United Kingdom
-
Civil Engineering
-
1 - 100 Employee
-
Tunnel Manager
-
2019 - Present
-
-
-
Ferrovial Construction
-
United States
-
Construction
-
700 & Above Employee
-
Tunnel Tendering Manager/Tunnel Lead - Riverlinx CJV- Silvertown Tunnel
-
Jan 2017 - Nov 2019
-
-
-
Ferrovial
-
Netherlands
-
Civil Engineering
-
700 & Above Employee
-
Tunnel Tendering Manager/Engineering Geologist
-
May 2013 - Jan 2017
Duties includes: cost estimating ,cost analysis, construction methodology and risk analysis for the following tender:-YORK POTASH-TTT CENTRAL C410-TTT WEST C405-NORTHERN LINE EXTENSION-GLASGOW SHIELDHALL TUNNEL
-
-
Tunnel Engineer - Engineering Geologist at BFK JV
-
Feb 2011 - May 2013
Duties include supervision of the works and resources.Liaise with the procurement team and suppliers.COSHH coordinator.Control the effectiveness of the Ground Conditioning during the excavation of the two tunnels of 6.2 km using two EPB with internal diameter of 6.8 m and constantly keeping the log of the excavation face.The Crossrail C300 project, involves the construction of two parallel railway tunnels with a length of 6,200m each, between Royal Oak and Farringdon. The tunnels are being constructed in London Clay using two EPB with a 7.12m excavation diameter. Show less
-
-
Tunnelling Estimator - Engineering Geologist
-
Feb 2010 - Feb 2011
Tender C300-C305Responsible for geotechnics, planning, construction methodology.
-
-
Shift Engineer/Engineer Geologist
-
Nov 2009 - Feb 2010
Heathrow Post T5 Baggage Tunnel :Duties included supervision of the works and managing the during excavation of the Post T5 Baggage Tunnel using SCL technique.
-
-
Shift Engineer
-
Feb 2009 - Nov 2009
Heathrow Baggage Tunnel: Duties included supervision of the works, face log of the during each advance.
-
-
-
-
Geotechnical Engineer
-
Sep 2008 - Feb 2009
M3 Motorway from Clonne to North of Kells (IE): In charge of a stretch, construction execution, programme of works, ground investigation. M3 Motorway from Clonne to North of Kells (IE): In charge of a stretch, construction execution, programme of works, ground investigation.
-
-
-
SPEA Ingegneria Europea
-
Construction
-
Engineering Geologist
-
Feb 2003 - Apr 2003
Motorway Taounate- Al Hoceima Geological survey and laboratory testing. Motorway Taounate- Al Hoceima Geological survey and laboratory testing.
-
-
Education
-
University of West London
Master of Business Administration - MBA, Business Administration and Management, General -
Università degli Studi di Roma 'La Sapienza'
Geologo, Geologia Applicata, Geotecnica -
Liceo Scientifico Statale Talete