Alessandro Milani

Process and electrical specialist engineer at Nooter/Eriksen Milan
  • Claim this Profile
Contact Information
Location
Milan, Lombardy, Italy, IT
Languages
  • Italiano -
  • Inglese -

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • Italy
    • Oil and Gas
    • 1 - 100 Employee
    • Process and electrical specialist engineer
      • Dec 2020 - Present
    • I&C engineer
      • Jun 2013 - Dec 2020

      Complete management of the supply of main equipment for HRSG, concerning both the mechanical and the I&C sides. My tasks start from the purchasing phase with the preparation of complete package of documentation for request of quotation – RFQ, and continues with the technical alignment of all suppliers and issue of the technical evaluation for the purchase order. After the follow-up of the designed supplier, my main duties end with the performance tests of the whole system/equipment in workshop or at site.• By-pass system (diverter or multilouvers dampers) with electric/pneumatic/Hydraulic movement: AMAL1B (2011), AMAL 1C (2014), Ras Abu Fontas A2 Project (2012).• Stack dampers: Stade Project (2011)• Blowers skid (purge air Fans and seal air Fans): AMAL 1C (2014)• Recirculation pumps: Los mina Project (2014), KAIS Project (2014)• SCR complete system with aqueous ammonia or urea (Catalyst elements, relevant SCR skids- unloading and feeding pumps/injection unit/recirculation blowers skid, vaporizer or decomposition chamber and also storage and handling of urea or ammonia): Facility D Project (2015 ammonia), Black Point Project (2016 dry urea)• PSV Pressure Safety valves for HRSG: KAIS Project (2014), SOHAR/IBRI Project (2016)• SB (≤ 2’) Small Bore valves manual/actuated: Los mina Project (2014) Show less

    • BASIC engineer
      • May 2008 - Jun 2013

      Support activities for sales department in order to define completely the technical offer (HRSG and any main equipment required by EPC).Pre engineering activities regarding main parts of HRSG (e.g., design of HRSG main frames, foundation loads, etc). Revision of customer specifications in order to fix the main features of HRSG design (layout, structural part, pressure parts) and in the same time definition of deviations list to be submitted to the customer and discussed during the bidding phase. Preparation of the complete package of documentation for RFQ issue, which is necessary to the purchasing department to obtain quotation (Purchase Specification and related technical annexes).Technical alignment of all suppliers up to P.O. assignment of whole system/equipment (by-pass system, dampers, sootblowers, boiler house, silencers for main or Bypass stack).Preparazione della documentazione necessaria (Specifica d'acquisto e relativi allegati tecnici) all'ufficio acquisti per emissione RDO.Attività di review delle offerte tecniche relative agli equipment che saranno acquistati sul mercato (by-pass system, sootblowers, boiler house, silenziatori camino principale o di By-pass) Show less

    • France
    • Real Estate
    • Ingegnere progettista
      • May 2005 - May 2008

Education

  • Politecnico di Milano
    Ingegneria civile, Indirizzo Trasporti
    1999 - 2005
  • Istituto tecnico per geometri P.L. Nervi
    1994 - 1999

Community

You need to have a working account to view this content. Click here to join now