Aleksei (Alek) Shoomiloff
Project Superintendent at Vanguard Construction & Co.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Native or bilingual proficiency
-
Russian Native or bilingual proficiency
-
Spanish Elementary proficiency
Topline Score
Bio
Credentials
-
10 hr OSHA
OSHAcademy Safety and Health TrainingSep, 2021- Nov, 2024 -
30 hour OSHA
OSHAcademy Safety and Health TrainingSep, 2021- Nov, 2024 -
Procore Certified: Project Manager (Core Tools)
Procore TechnologiesFeb, 2020- Nov, 2024 -
Procore Certified: Project Manager (Financial Management)
Procore TechnologiesFeb, 2020- Nov, 2024 -
Procore Certified: Project Manager (Project Management)
Procore TechnologiesFeb, 2020- Nov, 2024 -
Procore Certified: Project Manager (Quality & Safety)
Procore TechnologiesFeb, 2020- Nov, 2024 -
Construction Site Safety Supervisor (CSST)
360trainingJun, 2023- Nov, 2024 -
40hr Site safety manager
- -
Certified Welder SMAW-A7b
- -
Forklift Certified
- -
MTA track safety
- -
Qualified Rigger
- -
Scaffold user and erect/dismantle
- -
Union Ironworker
-
Experience
-
Vanguard Construction & Co.
-
United States
-
Construction
-
1 - 100 Employee
-
Project Superintendent
-
Jun 2023 - Present
-
-
-
RXR
-
United States
-
Real Estate
-
300 - 400 Employee
-
Project Superintendent
-
Mar 2020 - May 2023
-
-
-
Phoenix Diversified Group, Inc.
-
United States
-
Construction
-
1 - 100 Employee
-
General Superintendent
-
Jun 2019 - Mar 2020
Consulted work through Omni Build Consulted work through Omni Build
-
-
-
Omnibuild
-
United States
-
Construction
-
1 - 100 Employee
-
Project Superintendent
-
Mar 2014 - Jun 2019
• Compiled monthly executive and superintendent reports • Met with scheduling consultants to ensure project schedule stayed on track • Completely renovated Starbucks Coffee with all new MEP work • Demolished all existing parking garage ramps from ground floor to sub-cellars • Organized/executed demolition, excavation and SOE for new parking garage elevators • Constructed new boiler plant over existing live loading dock • Planned/organized placement for all structural steel • Synchronized night work with hotel management and staff • Coordinated phased renovations for conference rooms, IT rooms and cafeterias • Ran and directed all aspects of new façade work • Coordinated building steam shutdowns • Oversaw all progress and special inspections • Managed all concrete and rebar scheduling • Engineered de-watering plans for excavated areas • Removed and installed new walk-in refrigeration systems for main catering kitchens • Ran coordination meetings in conjunction with other GC’s • Arranged DOT/Con Edison work for new gas and street work • Coordinated crane and concrete pump work • Composed RFI’s and submittals • Produced preliminary design change sketches for engineers and architects • Edited meeting narratives • Pedestrian/traffic control in live loading dock • Ordered/logged jobsite materials • Created mock-ups Show less
-
-
-
Masterpiece Construction
-
United States
-
Construction
-
1 - 100 Employee
-
Project Manager
-
Apr 2012 - Mar 2014
• Renovated/Remodeled major mix-use buildings in Manhattan (The Centurion Building in New York, NY) • Worked closely with owners, owner’s representatives, engineers and architects • Worked with New York Landmarks to restore 1908 interior and exterior façade • Coordinated all (sub) contractors into overall schedule • Used Primavera project management software to track project • Used Project Share software to organize/distribute all documents and pictures • Conducted various walkthroughs for upcoming/potential jobs • Compiled site photos to create custom made Power Point presentations • Created/organized custom made daily logs utilizing project management software • Coordinated and executed weekly safety meetings • Generated meeting minutes • Organized and implicated all site safety guidelines and safety orientations • Generated time sheets for project accounting purposes • Generated sketches to clarify various project issues in order to review them with architects and engineers Show less
-
-
-
Capital Builders Group Inc.
-
Greater New York City Area
-
Project Superintendent
-
Dec 2009 - Apr 2012
• As Superintendent: remodeled and renovated a wide variety of major mix-use high-rise buildings in Manhattan • Authorized person in charge of all quality control • Authorized person in charge of punch list items (to meet client/owner expectations and specifications) • Managed resources for timely execution of contracts • Coordinated all subcontractors into overall schedule • Coordinated and scheduled deliveries • Made sure projects were completed within schedule parameters Show less
-
-
-
Pacific Coast Steel
-
San Francisco Bay Area, CA
-
Ironworker, Local Union 377
-
Feb 2005 - Nov 2009
• Assembled and installed rebar in large structures such as, buildings and bridges • Ran work (Apprentice Foreman) and laid steel mesh for multi-story buildings • Assistant Foreman at the Thunder Valley Casino (under supervision of the project manager) • Worked closely with architects and engineers for laying out rebar footings for Terminal 2 at San Francisco International Airport • Built underground parking structures at Stanford University utilizing Unbonded/Bonded Post-Tensioning systems • Constructed a concrete Synagogue, Beth Sholom, in San Francisco, CA • Placed and stressed post-tensioning systems • Placed rebar according to building blueprints • Cut, bent, layed-out, placed and welded reinforcing steel rods, welded wire fabric and composite materials in a wide variety of poured concrete products and structures such as buildings, highways, bridges and towers • Constructed parking garages, bridges and hospitals in San Francisco CA • Directed crew for the 880 overpass in Fremont CA Show less
-
-
Education
-
San Jose State University
-
Foothill College