Partnered with Zeni Shaft Drillers on multiple blind bore shafts with AEP and Consol. One of our shaft required a curtain wall and we wanted to integrate it with the shaft liner as it was installed. Alan was integral in making this happen, even though it was never actually done before. Worked out great. We were able to install another curtain wall in the same manner on another shaft based on that experience.
James Mazzocca
Enjoyed working with Alan on several projects in the past. Helped us install our first dual compartment style casing.
James Mazzocca
Partnered with Zeni Shaft Drillers on multiple blind bore shafts with AEP and Consol. One of our shaft required a curtain wall and we wanted to integrate it with the shaft liner as it was installed. Alan was integral in making this happen, even though it was never actually done before. Worked out great. We were able to install another curtain wall in the same manner on another shaft based on that experience.
James Mazzocca
Enjoyed working with Alan on several projects in the past. Helped us install our first dual compartment style casing.
James Mazzocca
Partnered with Zeni Shaft Drillers on multiple blind bore shafts with AEP and Consol. One of our shaft required a curtain wall and we wanted to integrate it with the shaft liner as it was installed. Alan was integral in making this happen, even though it was never actually done before. Worked out great. We were able to install another curtain wall in the same manner on another shaft based on that experience.
James Mazzocca
Enjoyed working with Alan on several projects in the past. Helped us install our first dual compartment style casing.
James Mazzocca
Partnered with Zeni Shaft Drillers on multiple blind bore shafts with AEP and Consol. One of our shaft required a curtain wall and we wanted to integrate it with the shaft liner as it was installed. Alan was integral in making this happen, even though it was never actually done before. Worked out great. We were able to install another curtain wall in the same manner on another shaft based on that experience.
James Mazzocca
Enjoyed working with Alan on several projects in the past. Helped us install our first dual compartment style casing.
Credentials
-
Safety Trained Supervisor Construction
Board of Certified Safety ProfessionalsOct, 2015- Nov, 2024
Experience
-
Zeni Drilling Co.
-
United States
-
Mining
-
1 - 100 Employee
-
Shaft Drilling Consultant
-
Jan 2019 - Present
-
-
-
Global Shaft Drilling Services, LLC
-
Morgantown, WV
-
Project Manager
-
Aug 2016 - Jan 2019
-
-
-
Black & Veatch
-
United States
-
Engineering Services
-
700 & Above Employee
-
Resident Inspector
-
Mar 2012 - Sep 2015
Represent the city of Columbus on the OARS 2 project. Resident on Shaft 3. Technical assistance and inspection of all pregrouting and remedial grouting work carried on at each of the three shafts in phase 2 of the project. Represent the city of Columbus on the OARS 2 project. Resident on Shaft 3. Technical assistance and inspection of all pregrouting and remedial grouting work carried on at each of the three shafts in phase 2 of the project.
-
-
-
McHugh Construction
-
United States
-
Construction
-
100 - 200 Employee
-
Quality Control Systems Manager
-
Jun 2010 - Mar 2012
Working as QC Systems Manager at the McCook Main Tunnel Access/Gate Shaft Project which is a part of the Chicagoland Underflow Plan. The project is overseen by the US Army Corps of Engineers Chicago District. My job is to perform all quality control and documentation to the USACE and implement the three phase inspection system used by the Corps of Engineers. Working as QC Systems Manager at the McCook Main Tunnel Access/Gate Shaft Project which is a part of the Chicagoland Underflow Plan. The project is overseen by the US Army Corps of Engineers Chicago District. My job is to perform all quality control and documentation to the USACE and implement the three phase inspection system used by the Corps of Engineers.
-
-
-