Alain Richard KORANDJI

Project Engineer at Créer CONSULTANTS
  • Claim this Profile
Contact Information
Location
Saint-Priest, Auvergne-Rhône-Alpes, France, FR
Languages
  • French Native or bilingual proficiency
  • English Full professional proficiency
  • Polish Full professional proficiency
  • Norwegian Elementary proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • General Recognition of Foreign Qualification
    NOKUT
    Sep, 2014
    - Sep, 2024
  • Project planning for Engineering
    AIBEL
    Jun, 2013
    - Sep, 2024
  • Statoil's Management system and ARIS
    STATOIL
    Jun, 2013
    - Sep, 2024
  • Project execution method
    AIBEL
    Feb, 2013
    - Sep, 2024
  • PDMS - Piping and Equipment Design
    AIBEL
    Nov, 2012
    - Sep, 2024
  • UDT Certificate for the Course: Requirement of harmonized standards for technological pipelines and flanges connections EN 13480 and EN 1591 Standards and Requirements for fixtures.
    UDT - Polish Office of Technical Inspection
    Nov, 2006
    - Sep, 2024
  • Basic Safety and Emergency Training Course for persons working in petroleum activities offshore
    NOSEFO - Norsk Senter for Offshoreoutdanning
    Oct, 2012
    - Sep, 2024
  • AutoCAD 2016 Essential Training
    Lynda.com
    Apr, 2016
    - Sep, 2024
  • Microsoft® Project 2016: Essential Training
    Lynda.com
    Jan, 2016
    - Sep, 2024
  • PRINCE2 Fundamentals
    Lynda.com
    Jan, 2016
    - Sep, 2024
  • Project Management Simplified
    Lynda.com
    Jan, 2016
    - Sep, 2024
  • Sprinkler Design with Revit
    Lynda.com
    Dec, 2015
    - Sep, 2024

Experience

    • France
    • Engineering Services
    • 1 - 100 Employee
    • Project Engineer
      • May 2019 - Present

      Mission Leroux & Lotz Technologies _ Echirolles Study and design of feed water, steam and condensate piping for SAICA Paper Mill Biomass Power Station - Nogent Sur Seine Mission Process Consult SAS - Michelin • Redaction of Piping Class and Tendering Specification for piping, valves and scaffolding • List of Tie-in and Batteries Limit Mission Leroux & Lotz Technologies _ Echirolles Study and design of feed water, steam and condensate piping for the energy recovery unit in Nice Mission ELKEM / ARTELIA Industry General installation studies and works coordination. Mission EKIUM _ LYON • Project coordination - General installations Mission ENGIE AXIMA - Project ITER • Redaction of technical specifications for the purchase and delivery of mechanical installations • Coordination of the Piping classes Catalog • Coordination of Hook-up Standards Catalog • Coordination of materials Catalog between the design Department and Mechanical Department • Coordination of the Technical specification of mechanical equipments • Technical analysis of Suppliers Bids Mission SECHE Eco Services - Project Acierie ARCELOR MITTAL _ Fos-sur-Mer • Coordination of engineering activities • Coordination of site activities (Civil works, steel framework, mechanical equipments, piping) Mission CNIM _ WTE & Biomass - Environment and Energy Services _ Seynes-sur-Mer Project Nr 1: Thermal power station LE MOULE Guadeloupe • Checking and approval of steam, water and air networks design documentations Project Nr 2: Thermal power station LA ROCHELLE • Redaction of piping Class • Redaction of technical specifications for the purchase and delivery of mechanical equipments (Turbo-generator set, Pumps, Heat exchangers, Condensers ...) • Technical and commercial analysis of Offers • Progress monitoring and change management Show less

    • France
    • Architecture and Planning
    • 1 - 100 Employee
    • Technical support
      • Dec 2018 - Jan 2019

      Mission PARLYM DE VIRIS - Piping and pipe support design in PDMS and AVEVA E3D Mission PARLYM DE VIRIS - Piping and pipe support design in PDMS and AVEVA E3D

    • General Layout Engineer
      • Sep 2017 - Jul 2018

      09/2017 – 05/2018 : Mission EDVANCE GROUP EDF: HPC UK nuclear power station - General installation studies - Feasibility studies for the introduction and installation of mechanical equipments - Handling devices studies and design for the maintenance of mechanical equipments - Monitoring of progress and change management 09/2017 – 05/2018 : Mission EDVANCE GROUP EDF: HPC UK nuclear power station - General installation studies - Feasibility studies for the introduction and installation of mechanical equipments - Handling devices studies and design for the maintenance of mechanical equipments - Monitoring of progress and change management

    • Ingénieur d'étude
      • Mar 2017 - Aug 2017

      - Design of new fission concentration facilities - Project AREVA NCPF - Piping design with Microstation and PDMS - Design of new fission concentration facilities - Project AREVA NCPF - Piping design with Microstation and PDMS

    • France
    • Human Resources Services
    • 700 & Above Employee
    • Mechanical Engineer
      • Sep 2016 - Dec 2016

      - Analysis of technical offers of Drum screens designed for the cooling systems of nuclear power plants - EDF CNEPE Tours in France - Elaboration of technical documentations for compliance with the Machinery Directive 2006/42/EC for EDF nuclear power plant “Flamanville” - Analysis of technical offers of Drum screens designed for the cooling systems of nuclear power plants - EDF CNEPE Tours in France - Elaboration of technical documentations for compliance with the Machinery Directive 2006/42/EC for EDF nuclear power plant “Flamanville”

    • Own Business
      • Jul 2012 - Apr 2016

      - Piping design with AutoCAD. - Sprinkler and hydrant systems design with REVIT. - Project Management and Project planning with Microsoft Project. - Engineering, Procurement, Mechanical Completion and Commissioning. - Piping design with AutoCAD. - Sprinkler and hydrant systems design with REVIT. - Project Management and Project planning with Microsoft Project. - Engineering, Procurement, Mechanical Completion and Commissioning.

    • Norway
    • Oil and Gas
    • 700 & Above Employee
    • Senior Engineer - Department of Piping and Material
      • Sep 2012 - Jun 2014

      - Estimation of work packages and man-hours, weight estimate, piping and equipment design with PDMS and Microstation according to Norsok, EN and ISO standards, preparation of layout drawings, isometric drawings, material requisition (MTO), valve specifications, preparation of Prefabrication packages, Installation packages and As-built packages. - Modernization of piping systems for offshore platforms and onshore Gas Processing Plant among others: oily water treatment system for Oseberg A and B offshore platforms, closed drain system for Veslefrikk offshore platforms, process hydrocarbons Liquid and deluge fire sprinkler systems for Kollsnes Gas processing plant. - Carrying out periodic surveys to construction sites during the design and the installation phases. Show less

    • Project Manager
      • Apr 2011 - Jun 2012

      - Project management within the manufacturing of heat processing furnaces and equipment for the brazing of aluminum heat exchangers (The management includes timing, budget, technical issues and quality). - Coordination of design documentations, coordination and supervision of manufacturing and assembly works (mechanical and electrical) at Shahapur Factory in India, supervision of procurement department activities, follow up of outsourced items at sub-contractors workshop and projects progress reports. - Supervising acceptance test of the Furnace Lines and delivery to the Costumers. Show less

    • Own Business
      • Sep 2010 - Dec 2011

      - Engineering, Construction and Commissioning - Piping and Mechanical Equipment - Engineering, Construction and Commissioning - Piping and Mechanical Equipment

    • United States
    • Construction
    • 1 - 100 Employee
    • Design Manager / Mechanical Manager
      • May 2008 - Jun 2010

      - Coordination of technical documentations and drawings for the Design and Build Project “Cadbury Schweppes Factory of Confectionery, Skarbimierz, Poland.” - Organization and coordination of tendering for design, installation and commissioning of fire protection systems for another Design and Build Project “Cadbury Wedel Factory of Confectionery, Skarbimierz, Poland ”, selection of subcontractors, coordination of design, procurement, installation and commissioning activities, including but not limited to checking and approval of technical drawings and documents, bill of materials, datasheets, procured equipment and materials, approval of leak proof tests, flushing operations, pressure tests and start-up operations during installation and commissioning phases, cost management and projects progress reports. - Technical support during installation and commissioning of other mechanical and piping systems. Show less

    • Design Engineer
      • Jul 2007 - Mar 2008

      - Design of fire protection systems in accordance with NFPA standards, FM and VDS standards and relevant laws and legislations as well as best engineering practice i.e. sprinkler and hose reel systems, control valve rooms, sprinkler groups, pumping station, fire water tank, external fire protection water pipes network, outside hydrants, including hydraulic calculations, preparation of layout drawings, section drawings, bill of materials, datasheets and elaboration of the executive design documentation and as-built documentation. - Active involvement in installation and commissioning activities among others leak proof tests, pressure tests, flushing operations, pre-acceptance tests and start-up operations. - Performing visits to construction sites during the design, installation and commissioning phases. - Key Projects: Design and Build of two Warehouses for “FM Logistic” a French Company. Show less

    • Electric Power Generation
    • 700 & Above Employee
    • Project Engineer
      • Jul 2006 - Apr 2007

      - Elaboration of tender specification for the purchase and delivery of the cooling water piping system for Lagisza Power Station 460MW, organization of tender and Contractor selection (pipes diameter range: DN500 ÷ DN2800). - Elaboration of tender specification for the purchase and delivery of various pumps and valves. - Classification of pressure equipment by category and fluid group and conformity assessment according to the Pressure Equipment Directive 93/27/EC (PED). - Carrying out periodic surveys to construction sites during the design and the installation phases. Show less

    • Software Development
    • Site Engineer
      • Jun 2004 - May 2006

      - Design of sprinkler and hose reel systems, pumping station, control valve rooms, sprinkler groups, pipe supports, fire water tank, fire protection network with outside hydrants according to NFPA and FM standards and relevant laws and legislations as well as best engineering practice. - Preparation of layout and section drawings, prefab drawings, BOM's and datasheets, translation of technical documents from Polish to French and active involvement in installation works. - Key Projects: Design and Build of the Commercial and Entertainment Centre “Manufaktura Lodz. Show less

    • Real Estate
    • 1 - 100 Employee
    • Project Engineer
      • May 2002 - Mar 2004

      - Piping, pipe supports and equipment design for power plants, chemical plants, pulp and paper manufacturing plants and food processing plant i.e. among others, design of pressure reduction/cooling station, lubricating oil system, steam piping, condensate piping, cooling water piping, pipe supports including piping calculation, preparation of layout drawings, section drawings, isometric drawings, bill of material and valve data sheets. - Classification of pressure equipment by category and fluid group and conformity assessment according to the Pressure Equipment Directive 93/27/EC (PED). - Carrying out periodic surveys to construction sites during the design and the installation phases. Show less

Education

  • Lodz University of Technology in Poland
    Master of Science in Mechanical Engineering, Faculty of Mechanics and Machines Construction