Alaa K. Abbas
Lead Electrical Engineer at Jurmat Group- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Jurmat Group
-
Jordan
-
Oil and Gas
-
1 - 100 Employee
-
Lead Electrical Engineer
-
2009 - Present
9/2009 – till now Working for Shams Al- Sabah for general construction company part of Jurmat group as : /9/2009—1/2/2010 Erbil & Dohuk’ s/s stage -3 project : •Site engineer in Sumal substation ( cable lying & earthing work for staff houses ) •Site engineer in Dohuk 2 substation (switch gear installation) 2010 / 7 - 2010 / 11 The State Company Of fertilizers / South Region new substation (site engineer) switch-gear instillation 2010/ 12- 2013/ 11 Sales engineer for ABB low voltage products in the company show room 2013/ 11 – 2015/4 in Amara 400/132/11 K.V substation (ABB substation ) as site engineer (cable lying , termination , install of 400kv disconnector , install of 400kv surge arrestors, erection of 400kv 50mvr shunt reactor and erection of 400/132/11 kv 83.3 mvr auto transformer ) From 2016/9-2016/11: in Samawah- ALsuer substation 132/11 HYOSUNG company Oil filling of 3 132/11 auto transformers From 2016/11 till now At Zubier power permanent power generation project : 1 . prepare the material take off for A) Under ground earthing Materials B) Cable tray support C) Cable accessories such as MV & LV termination kits, cable protection materials, cable and core identification materials .etc. 2 . Design electrical network for G.E camp Site engineer 3.Execution of Cathodic protection for oil,fire fighting and demidemineralize water thanks 4.Execution of under ground earthing for gas turbine area and its auxiliaries 5. installation of gas turbine electrical and control unit 6.Supervision on the installation of gas turbine auxiliary transformer, service station transformer and step up transformer 7.Supervision on cable tray and cable pulling activities in power block area 8.Installation of 6.6 KV ABB switch gear in control 27 cubicles 9.Installation of lighting and small power for the central control building 10.Execution of cable try ,cable pulling and termination for the HVAC system for the central control building Show less
-
-
Education
-
University of technology
Bachelor's degree, Electrical and Electronics Engineering