Al Chang

Electrical Engineer, Leader on SCADA systems for Plant at AB&I Foundry
  • Claim this Profile
Contact Information

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • United States
    • Wholesale Building Materials
    • 1 - 100 Employee
    • Electrical Engineer, Leader on SCADA systems for Plant
      • Jun 2006 - Present

      I provide expert engineering recommendations and direction on projects and functions for the cast iron pipe and fitting products manufacturer. Continually identified areas of opportunity and lead comprehensive functions to stay compliant and energy-efficient across the plant. The following are highlights of the value I bring to the organization: • Oversee the installation of a new Electrical Furnace with new substations with three new transformers switch gears, and a furnace for the new product line, Ductile Iron. • Develop PLC/HMI, and SCADA programs and facilitate diverse training for electricians to ensure all standard operating procedures (SOPs) are compliant and consistent across the plant. • Design Automation Controls for Plant Water Treatment and control pumps with distribution control systems such as VFD, PLC, HMI, PID, and pressure transducers which have eliminated operators from adjusting water vales and the need to turn on/off water pumps. Successfully have reduced 50% or more energy waste. • Led the implementation of automation controls with Proportional, Integral, and Derivative (PID) for the plant's furnace to pour Liquid Metals into molds for manufacturing media goods. Controls allow the pouring of liquid metal more accurately and efficiently, eliminating 20% scape with the new system. Effectively manage diverse project planning and management which have included: • Implementation of computer servers for SCADA allowing the Environmental Manager to access data collected from PLC to be compliant with environmental laws. • Replaced plant lighting upgrades; worked closely with Lockheed Martin and PG&E for energy efficiency and rebates. Utilized energy-efficient LED high bay lamps and controls which achieves savings of over 70% energy and maintenance cost per year. • Converted multiple PLC5 programs to CompactLogix, allowing the implementation of encoders and analog transducers efficiently, and faster machine cycle times.

    • United States
    • Gambling Facilities and Casinos
    • 700 & Above Employee
    • AS 400 OP Engineer
      • Mar 2003 - May 2006

      I led daily operations of the IT department with a focus on maintaining the IBM AS400 DB; installed security and daily backup, and worked in collaboration with security staff to ensure DB servers did not overlap. Served as the central point of contact with Front Desk operations, Accounting department, and Engineering to ensure DB was secure and accessed. The following are highlights of the value I brought to the position: • Provided support to the IT department regarding computer/servers, network cables, slot machine installations, answered calls, and provided network assistance to customers. • Drove daily direction on the monitoring of servers for security and emergencies and provided computer training to operators and established operating procedures and metrics for continual improvement.

    • Denmark
    • Oil and Gas
    • 1 - 100 Employee
    • Commissioning Engineer
      • Jun 2000 - May 2003

      I was positioned with millwrights and electricians for Sorters and Conveyors installation; ensured products worked properly and met the client’s needs. Direct report to project engineer; tested sorters and conveyors, troubleshot problems and reported software problems. The following are highlights of the value I brought to the position: • Drove continuous performance improvements, provided service calls for customers and electricians regarding issues related to their sorters, and delivered training to customer mechanics and electricians on sorters operations and safety protocols. • Conducted power measurements on the system, and verified power and connectivity to all microcontrollers. • Connected network UNIX servers and clients and integrated vendor WAN equipment and Host WAN computers to UNIX servers. Created detailed test plans and checklists, and conducted power and controls specifications tests.

    • United States
    • Defense and Space Manufacturing
    • 400 - 500 Employee
    • Systems Engineer
      • Aug 1995 - Jun 2000

      I led direction and project management on the integration of Tilt Tray Management Sorter System, TMS for USPS Processing and Distribution Center across the United States and Australia. The following are highlights of the value I brought to the position: • Drove continuous performance improvements and completed system start-ups, debugging of software problems, and issues tracking. • Oversaw daily activities associated with budgeting projects, staff development, planning, and customer communications, and provided 24/7 Help Desk Support.

Education

  • Florida International University
    Bachelor of Science - BS, Electrical and Electronics Engineering
    1990 - 1995

Community

You need to have a working account to view this content. Click here to join now