Akshay Lakhani

Electrical Engineer at Cell Engineering
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Australia, AU
Languages
  • English Native or bilingual proficiency
  • Gujarati Native or bilingual proficiency
  • hindi Limited working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Professional Electrical Engineer
    Engineers Australia
    Jun, 2018
    - Oct, 2024

Experience

    • Australia
    • Appliances, Electrical, and Electronics Manufacturing
    • 1 - 100 Employee
    • Electrical Engineer
      • Jul 2023 - Present

      Power system design engineer Electrical design engineer Power system studies and protection Co-ordination, protection matrix and Arc flash protection settings and studies. Power system Modelling and study Earthing system design and protection through safe grid and argon software Power system protection design and study PTW SKM software AutoCAD design - single line diagram and electrical schematic Maximum demand and cable sizing calculations using PowerPac software Preparing offer documents for project works Preparing detailed technical reports Client relationships management Technical data management Show less

    • Australia
    • Retail
    • 700 & Above Employee
    • Operation team member
      • Apr 2022 - Present

      • Perform the duties of the Position and any other duties as Bunnings may reasonably direct from time to time • Comply with all lawful and reasonable directions of your Leader and Bunnings • Devote your full time and attention to the performance of duties • Act in good faith in, and for, the best interests of Bunnings • Perform your work to the highest professional and ethical standards (including acting with trust and integrity in all your dealings) • Achieve all KPIs and/or objectives set for you by your Leader and Bunnings, and • Honestly and faithfully answer any question asked of you by your Leader and Bunnings about or relating to your work or employment at any time. Show less

    • Australia
    • Retail
    • 700 & Above Employee
    • Team member
      • Aug 2020 - Present

      • In this role, I was able to develop and to execute various skills, tasks, and procedures. • Maintaining a high level of cleanliness in my environment, including behind the counter, the kitchen and in the restaurant • Being able to appropriately address customer queries and concerns • Work efficiently with other team members • Uphold a high level or organisation in order to ensure all assigned tasks are able to be effectively completed • Think quickly on my feet to appropriately problem solve arising situations • Answering telephones and giving information to callers, taking messages, or transferring calls to appropriate individuals • Describe merchandise and explain use, operation, and care of merchandise to customers. • Prepare bills for food, using cash registers or adding machines, and accept payment or make change. Show less

    • Electrical Project Engineer (Power System)
      • May 2019 - Jan 2020

      Project Title: Extension and Renovation of City Hospital, Sports Club, and City Library• Specially, I used to support electrical services design associated with new construction, upgrade and modification, internal and external systems.• Specifically experienced and good understanding in electricity supply industry, power system protection configuration, power system optimisation, planning, analysis, and enhancement of electrical power. LV and EHV power distribution and reticulation systems, passive ICT infrastructure design, security design, backup power systems design and integration of solar PV power design.• Undertaking technical design and documentation of power (generation, Transmission, Distribution, and renewables) and industrial projects (with minimal supervision).• QHSE/Document Controls Identifying hazards, developing safety procedures, and encouraging continuous improvement in relation to HSE. Ensuring that all electrical work is performed by and supervised by holders of electrical work licence appropriate to the work.• Assist in identifying hazards, advising on safety procedures to ensure adherence to correct procedures and standards for safety and environmental performance. Support the DGVCL Group corporate quality, safety, health, and environmental management systems by:• Reporting to QHSE Director for any situation that could result in harm to a person, the environment or may adversely affect the services we provide our customers.• Reporting to QHSE Director any opportunities that would improve the quality of service we provide ourcustomers or could reduce the potential for harm to people or the environment. Understand and support the annual QHSE objectives.• Maintains professional and technical knowledge by attending educational workshops, reviewing professional publications, establishing personal networks, participating in professional societies. Commercial Control Panels, Power Distribution transformers and control Switchboards. Show less

    • Graduate Electrical Engineer (Power System)
      • Jun 2018 - May 2019

      • Worked in distribution sector by supervising and maintaining Hi-tech substation and distribution system with Gujarat government electricity board.• establishing delivery and installation schedules for machines, switchgear, cables, and fittings• supervising the operation and maintenance of power stations, transmission and distribution systems and industrial plants and big data analysis by MATLAB, Java and other software for operation and protection.• Develops manufacturing processes by designing and modifying equipment for building and assembling electrical components, soliciting observations from operators.• Always acted professionally, demonstrated cultural awareness, and operated within the boundaries of agreed policies and procedures.• knowledge and skills in Power Engineering including planning, design, construction, and operation in relevant regulated power system industry and Handling intake, scanning, verification, and storing documents, filing, and archiving relevant documentation• Retrieving files for other employees and customers when needed, Designing templates for documents, file types, and document databases and checking and editing documents for accuracy and compliance.• Controlling the flow of documents in and out of the department, provides quality support to supervisors and technicians.• Synchronization control panels for 3 Nos of 1000KVA Generator and Main power Source.• Generator AVR (Stamford 560) Troubleshooting and replacements.• Complete termination and connection of the Controllers of DEAP-SEA, COMAP and DATAKOM for ATS,small generator engine control panels and synchronizer according to the drawings.• Installation of Fuel Sensor, Oil Pressure Sensor, Water Temperature Sensors, and speed cards of the generators. Show less

    • Electrical Project Engineer
      • Dec 2016 - Apr 2018

      Project Title: Construction and Maintenance for SBI & PSO Hi-Tech Electrical Services • Commercial safety control systems and commercial PLC and SCADA systems, UPS, Diesel Generator, RTU and HMI Solar Systems Integration. • Clear understanding in engineering Project Management, Stakeholder Management and project documentation and project planning. Also, specialised in Inspection of transformers, circuit breakers and other electrical components. • Experienced in power system operations, dispatch, and market operation with the impacts of HV protection and control schemes and experienced in writing power system event investigation reports. Skills in identifying common risks, completing project by finish date, and ensuring safety when performing the works, were gained while Co-ordinating the projects. • Responsible for initial design review, Design Coordinator between consultant, client, and designer for final approval of design. • I was supervising the Installation and Commissioning, Shop Drawings, Cable Routing Direct Buried, Trench Size Calculations, Earthing System Installations and Testing, Lighting Protections as per project defined Standards • Major Installations and Commissioning Part: Installation and Terminations of 9 Nos of Chilled water pumps (250KW), 6 Nos of Fire Fighting Pumps (250KW), Installation and terminations of 3 Nos of MCC (Chilled Water) and 6 Nos of Soft Starters (Fire Pumps). Team Technical Support: Led the Electrical Supervisors for the following works. • Electrical containment works and Multi Services Interface (MSI). MCC Panel Installation and Cable Pulling works, Cable glands and cable jointing. Breaker installation and termination, Terminations of AHU System, Fire alarm works completely. • Terminations and Commissioning of CRAC CHW & DX Units, Installations and Terminations of ACBS System. • Interfacing of all electrical equipment with Building Management System, Installation and Terminations of Fire Suppression System FM-200. Show less

    • India
    • Oil and Gas
    • 700 & Above Employee
    • Electrical Design Engineer
      • Jan 2016 - Dec 2016

      Project Title: Installation and commissioning of operation/generation unit ROU501&GOU502 of Refinery• Complete Helioscope design requests from Sales and Engineering and complete interconnection drawings, singleline diagrams, bid sets, construction sets, and as-built drawings for all solar projects.• I was responsible for the construction of electrical services under the engineering and project management department at Reliance ROU501 & GOU502 units.• This Project was the same copy of the already existing Reliance Group Refinery Limited ROU501 & GOU502 units; therefore, we had approved drawings, project specifications, approved material lists and other project documentation at the very initial stage and this led us towards rapid Kick-off.• In this project, our company was assigned only for Low current, low voltage equipment and LV electrification of the school. All the Medium Voltage equipment and cabling were assigned to another company named as “VoltAmp”.• Major Installations and Commissioning Part: Installation and Terminations of Public Address System, Digital Clock System, Data and Network System, Fire Alarm System, Main Distribution Panel Boards, Distribution Panel Boards.• Team Technical Support: Led the Electrical team for the following works, Attend the daily meetings and report the activities and daily progress to Project management. Preparation of Material requests from the given IFC drawings.• Supervision of installations of all the low current and low voltage devices/equipment according to the project defined Standards. Close co-ordination with the E&PM team for the project execution.• Raising Requests for inspections for all the completed works to respected department and Preparation of Third-party tests for all electrical Low voltage and low current equipment under E&PM witness.• Installation of cable tray network, conduiting, wire pulling, LV cable pulling according to the provided drawings. Show less

    • Junior Project (Electrical) Engineer (with summer internship)
      • Feb 2015 - Jan 2016

      Project Title: Design and Implementation of CCRM-2, TANK FARM, LCC, Petrochemical Building 205• I was a member of the project Site team under the supervision of Miscellaneous Technical Services Team (MTST) of Petrochemical department for the extension and renovation of the CCRM-2, TANK FARM, LCC, PIB19, BUILDING 205.• Major Installations and Commissioning Part: Installation and Terminations 2 Nos of T/F 650 KVA and Preparation and planning of electrical manpower for Petro Rabigh Specific Training and Necessary approvals• Respective Building Proponents design stage coordination and co-ordination and implementation of the design upgradation with the head office design department.• Project execution method statement discussion and approvals of the respective proponent, review Project construction electrical procedures according to project defined standards.• Supervise and Monitor Installation of Cable, Cable tray, Lighting, Distribution control panel, all electrical equipment and Grounding system (SAES-P-104,123,116,111 & related IEEE clauses).• Installation of complete Building Electrifications in the respective building according to the given approved drawings and perform routine inspection and document result in accordance with approved Reliance petrochemicals and electrical Standards.• Monitor activities of electrical supervisors and team for daily given tasks and supervised and verified Continuity, Megger, HI-POT, and Component testing for Medium Voltage & Low Voltage equipment. (In reference to Reliance Petrochemical department test reports). Show less

Education

  • Charles Darwin University
    Master of Engineering - Electrical and Electronics, Electrical and Electronics Engineering
    2020 - 2021
  • Nirma University, Ahmedabad, Gujarat, India
    Bachelor's degree, Electrical Engineering
    2015 - 2018
  • Gujarat Technological University, Ahmedbabd
    Diploma in Electrical Engineering, Electrical Engineering
    2012 - 2015

Community

You need to have a working account to view this content. Click here to join now