Akmal Muhd Nuruddin Bin Abd Razak

Assistant Engineer at Soon Ngai Engineering Sdn Bhd
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Malaysia, MY

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Facilities Services
    • 1 - 100 Employee
    • Assistant Engineer
      • May 2022 - Present

    • Senior Technician
      • Oct 2020 - Apr 2022

    • Singapore
    • Environmental Services
    • 1 - 100 Employee
    • Technician
      • Feb 2020 - Oct 2020

    • Singapore
    • Environmental Services
    • 200 - 300 Employee
    • Technician
      • Feb 2019 - Feb 2020

      Wastewater treatment process o Responsible to run process and control waste water treatment o Responsible to run testing for sample from production to make sure productbefore relase o Conduct plc (scada) on site o Produced / discharged the effluent to comply with DOE specification o Handling ISO lab documentation and prepare report every shift Dionized water process o Make sure all equipment and scada system in good functioning o Perform quality control every shift and record all the parameter o Conduct lab testing to make sure quality in good condition (restivity control) o Prepare report of process every shift Show less

  • jabatan alam sekitar
    • Terengganu, Malaysia
    • Intern
      • Aug 2016 - Dec 2016

      1. Dissemination of information, education section & monitoring section 2. Environmental Impact Assessment (EIA) and Preliminary Site Assessment (PAT) section - Make the summary of EIA report - Involve the presentation of EIA - Help the enforcement of EIA 3. Point sources section - Learning the factory process - Learning the pollution control equipments - Learning the sewage treatment system - Learning the effluent treatment system 1. Dissemination of information, education section & monitoring section 2. Environmental Impact Assessment (EIA) and Preliminary Site Assessment (PAT) section - Make the summary of EIA report - Involve the presentation of EIA - Help the enforcement of EIA 3. Point sources section - Learning the factory process - Learning the pollution control equipments - Learning the sewage treatment system - Learning the effluent treatment system

    • Technician
      • Mar 2015 - Jul 2015

      o OOSB produces high quality MA through its manufacturing facility with continuous distillation o Take a reading for Distillation Area-1 log sheet (pumps readings) & Distillation Area-2 log sheet (agitators readings) o Dechocked residue line manually o Cake dumping (two times per day or depends on the control room’s order) o Operate the centrifuge (three batch per day) o OOSB produces high quality MA through its manufacturing facility with continuous distillation o Take a reading for Distillation Area-1 log sheet (pumps readings) & Distillation Area-2 log sheet (agitators readings) o Dechocked residue line manually o Cake dumping (two times per day or depends on the control room’s order) o Operate the centrifuge (three batch per day)

Education

  • TATI University College (Official)
    Bachelor In Chemical Engineering Technology, Chemical Engineering
    2015 - 2018
  • University College TATI (Official)
    Diploma In Chemical Engineering Technology, Chemical Engineering
    2012 - 2015

Community

You need to have a working account to view this content. Click here to join now