Akmal Javed

Sr Land Surveyor at Parsons International
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Abu Dhabi Emirate, United Arab Emirates, AE

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Belgium
    • Civil Engineering
    • 300 - 400 Employee
    • Sr Land Surveyor
      • Oct 2018 - Present

      Project: Construction of storm water Drainage for AlReef Residential Area. Development Manager: Musanada Client: Department of Municipalities and Transport. Designation: Sr. Land Surveyor. Period: Feb_2021 to till date C) Project: CP20 COEX Campus Overlay Infrastructure Works (Expo2020) Development Manager: MACE Client: DWTC (Dubai World Trade Center) Designation: Land Surveyor Period: Oct_2019 to Oct_ 2020 D) Project: Umm Amaraa Plots Development Development Manager: North 25 Client: MERAAS Development LLC Designation: Land Surveyor Period: April_2019 to Oct_2019 E) Period: Feb_2019 to April 2019 Project: Internal Roads Warsan Second Development Manager: North 25 Client: MERAAS Development LLC Designation: Land Surveyor F) Project: Dubai Land Oasis – Enabling and Grading Works Development Manager: North 25 Client: Dubai Land Oasis Designation: Land Surveyor Period: Oct_2018 to Feb_2019 Show less

    • Land Surveyor
      • Mar 2018 - Sep 2018

      Project: Mobility Signature Pavilion EXPOO 2020 Dubai UAE Consultant: WSP Middle East Architectural & Engineering Consultancy Development Manager: Emaar Properties PJSC Client: EXPOO 2020 Lehbab Road Designation: Land Surveyor Period: March_2018 to Sep_2018 Responsibilities • Supervision of all survey works infrastructure utilities lines (storm drainage, water, sewerage, Irrigation Line, telecom, LV/MV, Irrigation and water supply) • Supervision and monitoring of day to day site activates. • Checking the shop drawings. • Preparation of weekly and monthly progress report. • Supervision of the survey work seating out and structural and finishing activities of roads, MH. • Setting out of road work, such as Vertical, Horizontal Curve, Junction, Curb Stone Etc. Setting out for NDRC, Pipe Line, Etc • Shifting control point. • Setting out of beam, column, share wall, core wall and opening and etc. • Setting out for Anchor bolts, inclined plates, horizontal plates, vertical plates. Show less

    • United Arab Emirates
    • Construction
    • 200 - 300 Employee
    • Land Surveyor
      • Feb 2015 - Feb 2018

      Project: Dubai World Central Residential District Infrastructure CP 2 & 3 Consultant: Parsons International Ltd Client: Dubai South DWC Designation: ​ Land Surveyor Period: Nov_2016 to Feb_2018. B) Period: Frb,_2015 – Nov_2016 Project: New Abu Dhabi - Dubai Road, Package-B Consultant: Aurecon (PMC) / AECOM (supervising Engineer) Clint: Abu Dhabi General Services Company PJSC - Trading as MUSANADA (Project tendered by the Department of Transport - DOT) Designation: ​ Land Surveyor Responsibilities • Interchange works include (Road works, Bridges, MSE Walls, Relocation of OHLs, Protection/Diversion of Existing Services, Electrical Substations, Street Lights, Feeder Pillars, LV/MV Cabling) • Supervision of all survey works infrastructure utilities lines (storm drainage, water, sewerage, Irrigation Line, telecom, LV/MV, Irrigation and water supply) • Setting out of road work, such as Vertical, Horizontal Curve, Junction Round about, Curb Stone Etc. Setting out for Bridge, Retaining Wall, Under Pass • Controlling the availability of the surveyor work • Supervision of the survey work seating out road work and structural and finishing activities of building and parking • Supervision and monitoring of day to day site activates • Coordinating with PM, consulting & client during site visit • Survey for underpasses & culverts • Center line with coordinate • Checking the shop drawings • Preparation of weekly and monthly progress report. • Attend the weekly progress meeting with management and client. Show less

    • Land Surveyor
      • Jun 2012 - May 2014

      Project: Horse Race Stadium with all Services and Structure, Earthwork Period: June 2012 to May 2014 Designation: Land Surveyor ​​ Responsibilities • Fixing the control points by Traversing by Angles and Distances • Fixing the Bench marks by rise and fall method • Setting out and level works for internal roads and water line • Checking of vertically of column, floor and roof slab level • Setting out Storm water manhole, chamber and sewerage manhole • Taking the existing details on site, cut out and fill area levels Show less

    • Pakistan
    • Construction
    • 700 & Above Employee
    • Assistant Land Surveyor
      • Jan 2011 - Feb 2012

      Project: Bahria Town, Phase-8 Position: Land Surveyor Period: January 2011 to February 2012 Responsibilities • Calculating and fixing of invert level of Drainage and Sewer pipelines • Shifting of bench marks • Design work for house connection and cover level for chambers and Manholes. • Calculation of vertical and horizontal alignment • Taking OGLs survey of existing details ​​​​​​ Show less

Education

  • Govt Collage of technolgy sargodha
    Associate's degree, Civil Engineering
    2008 - 2011

Community

You need to have a working account to view this content. Click here to join now