Akhyar Rozikin
Project Manager at Clifden Solution Sdn Bhd- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Credentials
-
Handling Dual PAUT Probes
Eddyfi TechnologiesJul, 2022- Oct, 2024 -
Introduction to TOFD 1.0
Eddyfi TechnologiesJul, 2022- Oct, 2024 -
LYNCS™ PAUT Scanner Showcase
Eddyfi TechnologiesJul, 2022- Oct, 2024 -
Introduction to PAUT V1.0
Eddyfi TechnologiesApr, 2021- Oct, 2024 -
Capture Analysis Tools V1.0
Eddyfi TechnologiesApr, 2021- Oct, 2024 -
Introduction to UT
Eddyfi TechnologiesApr, 2021- Oct, 2024 -
Introduction to TFM 1.0
Eddyfi TechnologiesMar, 2021- Oct, 2024 -
Capture Setup Creation-V1.0
Eddyfi TechnologiesMar, 2021- Oct, 2024 -
Introduction to Phased Array Ultrasonic Testing Using Capture
Eddyfi TechnologiesJul, 2020- Oct, 2024 -
TOFD INSPECTOR LEVEL II
CSWIP - Certification Scheme for PersonnelNov, 2017- Oct, 2024 -
PAUT INSPECTOR LEVEL II
CSWIP - Certification Scheme for PersonnelOct, 2017- Oct, 2024 -
LPI INSPECTOR LEVEL II
CSWIP - Certification Scheme for PersonnelJun, 2017- Oct, 2024 -
UT INSPECTOR LEVEL II
CSWIP - Certification Scheme for PersonnelOct, 2016- Oct, 2024 -
MPI INSPECTOR LEVEL II
CSWIP - Certification Scheme for PersonnelJun, 2015- Oct, 2024
Experience
-
Clifden Solution Sdn Bhd
-
Malaysia
-
Engineering Services
-
1 - 100 Employee
-
Project Manager
-
Feb 2021 - Present
-
-
-
Freelance
-
Egypt
-
Human Resources
-
1 - 100 Employee
-
Advance NDT Inspector
-
Oct 2020 - Present
-
-
-
Xpert Engineering Solution Sdn Bhd
-
Malaysia
-
Mechanical Or Industrial Engineering
-
1 - 100 Employee
-
Advanced NDT Inspector Cum NDT Manager
-
Oct 2020 - Jan 2021
-
-
-
-
Senior NDT Supervisor
-
Sep 2013 - Sep 2020
-
-
NDT Supervisor
-
Aug 2008 - Aug 2013
-
-
NDT Technician
-
Jul 2004 - Jul 2008
-
-
-
-
TFM/TOFD/PAUT INSPECTOR
-
Oct 2019 - Nov 2019
Contract with MRCSB during Turnaround 2019 •Operate Total Focusing Method (TFM), Time-of-Flight Diffraction (TOFD), Phased Array (PAUT) inspection using M2M Gekko on equipment & piping (suspected present High Temperature Hydrogen Attack @ HTHA during SPRINTA2019). •To perform TFM/TOFD/PAUT on selected joint on piping & weld seam on equipment as per client requirement. •Review and analysis data before submitting to client MRCSB (review by E²G|The Equity Engineering Group, Inc.). Contract with MRCSB during Turnaround 2019 •Operate Total Focusing Method (TFM), Time-of-Flight Diffraction (TOFD), Phased Array (PAUT) inspection using M2M Gekko on equipment & piping (suspected present High Temperature Hydrogen Attack @ HTHA during SPRINTA2019). •To perform TFM/TOFD/PAUT on selected joint on piping & weld seam on equipment as per client requirement. •Review and analysis data before submitting to client MRCSB (review by E²G|The Equity Engineering Group, Inc.).
-
-
-
Mitsubishi Heavy Industries
-
Japan
-
Industrial Machinery Manufacturing
-
700 & Above Employee
-
PAUT INSPECTOR
-
Mar 2019 - May 2019
Seconded to MHI (perform PAUT on Piping Stainless Steel Reformer) La Brea, Union Industrial Estate, TMD Project – 1MTPY Methanol & Di-Methyl-Ether Complex Trinidad & Tobago. Seconded to MHI (perform PAUT on Piping Stainless Steel Reformer) La Brea, Union Industrial Estate, TMD Project – 1MTPY Methanol & Di-Methyl-Ether Complex Trinidad & Tobago.
-
-
-
-
Advanced NDT Coordinator
-
May 2018 - Sep 2018
Seconded to PETRONAS RAPID PENGERANG •Coordinate and arrange for Joint Locator, Cleaning Team & PAUT Team for area OUIJV Package 14. •Review and analysis data before submitting to client. •Coordinate works with third party, QC department and Client QA/QC to ensure quality level are achieved and acceptable to the code and specifications requirements as stipulated Interact with client representative for daily activities. Seconded to PETRONAS RAPID PENGERANG •Coordinate and arrange for Joint Locator, Cleaning Team & PAUT Team for area OUIJV Package 14. •Review and analysis data before submitting to client. •Coordinate works with third party, QC department and Client QA/QC to ensure quality level are achieved and acceptable to the code and specifications requirements as stipulated Interact with client representative for daily activities.
-
-
-
Synerlitz (M) Sdn. Bhd.
-
Malaysia
-
Construction
-
1 - 100 Employee
-
TOFD/PAUT INSPECTOR
-
Apr 2015 - Aug 2015
Seconded to Synerlitz (M) Sdn. Bhd. PETRONAS LNG TRAIN 9 PROJECT. Seconded to Synerlitz (M) Sdn. Bhd. PETRONAS LNG TRAIN 9 PROJECT.
-
-
-
PT. Rekayasa Industri
-
Mechanical Or Industrial Engineering
-
200 - 300 Employee
-
TOFD INSPECTOR
-
Feb 2015 - Mar 2015
Seconded to Rekind Rekayasa SABAH AMONIA UREA PROJECT (SAMUR). Seconded to Rekind Rekayasa SABAH AMONIA UREA PROJECT (SAMUR).
-
-
-
JGC
-
Japan
-
Oil and Gas
-
700 & Above Employee
-
TOFD INSPECTOR
-
Jan 2014 - Apr 2014
•Operate Time-of-Flight Diffraction (TOFD) inspection using TD Pocket Scan System on Closing Circumferential Seam of 48 Exchangers. •To perform TOFD on Closing Circumferential Seam Weld based on ASME code case 2235 as per client requirement. •Operate Time-of-Flight Diffraction (TOFD) inspection using TD Pocket Scan System on Closing Circumferential Seam of 48 Exchangers. •To perform TOFD on Closing Circumferential Seam Weld based on ASME code case 2235 as per client requirement.
-
-
-
-
TOFD INSPECTOR
-
Oct 2011 - Apr 2012
Seconded to JGC Algeria (TOFD on Slug Catcher & Spherical Tank, Gassi Toiul Project) Seconded to JGC Algeria (TOFD on Slug Catcher & Spherical Tank, Gassi Toiul Project)
-
-
-
-
TOFD INSPECTOR
-
Aug 2008 - Feb 2009
Seconded to CCIC (perform TOFD on process piping, KGP Project, Saudi Aramco)
-
-
TOFD INSPECTOR
-
Jul 2007 - Jul 2008
Seconded to CCIC (TOFD on Process Piping, Rabigh Project)
-
-
-
-
TOFD INSPECTOR
-
Nov 2006 - Apr 2007
Seconded to JGC Middle East (TOFD on Slug Catcher & Process Piping, Dolphin Project) Seconded to JGC Middle East (TOFD on Slug Catcher & Process Piping, Dolphin Project)
-
-
-
Toyo Engineering Corporation
-
Japan
-
Construction
-
700 & Above Employee
-
TOFD TECHNICIAN
-
Oct 2005 - Mar 2006
Seconded to Toyo Engineering Corporation (South Pars 6, 7 & 8 TIJD Consortium) Seconded to Toyo Engineering Corporation (South Pars 6, 7 & 8 TIJD Consortium)
-
-
-
-
Machine Operator
-
Sep 2002 - Dec 2002
-
-
Education
-
Johor Bahru MARA Skills Institute
Welding & Fabrication Technology, Malaysian Skills Certificate (MSC) Level 2 & Level 3 -
GIAT MARA Bagan Datoh
Welding & Fabrication Technology, Malaysian Skills Certificate (MSC) Level 1 -
Sekolah Menengah Irshadiah Addiniah
SPM