Akash Tangade
Project Manager at CRS Group, now an Epitec company- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
CRS Group, now an Epitec company
-
United States
-
Staffing and Recruiting
-
1 - 100 Employee
-
Project Manager
-
Oct 2022 - Present
Peoria, Illinois, United States
-
-
-
Ruprecht, a Division of Kilcoy Global Foods
-
United States
-
Food and Beverage Manufacturing
-
1 - 100 Employee
-
Purchasing
-
Jul 2021 - Oct 2022
Mundelein, Illinois, United States
-
-
-
Gati Battery Tech Pvt. Ltd. - India
-
India
-
Chemical Manufacturing
-
1 - 100 Employee
-
Supply Chain Buyer/Planner
-
Jun 2017 - Jun 2019
Pune Area, India Negotiated price of parts for Maintenance, Repairs, and Operations (MRO) to get the best cost-effective deal after a comprehensive cost analysis resulting in total cost savings of 12.5% per part Developed MOQ’s(Minimum Order Quantities) and EOQ’s(Economic Order Quantities) saving $25000 in inventory value. Ordered and regulated battery supplies and performed quality check inspections with AQL upon arrival. Achieved reduction of rejection by 19% using the checklists & poke… Show more Negotiated price of parts for Maintenance, Repairs, and Operations (MRO) to get the best cost-effective deal after a comprehensive cost analysis resulting in total cost savings of 12.5% per part Developed MOQ’s(Minimum Order Quantities) and EOQ’s(Economic Order Quantities) saving $25000 in inventory value. Ordered and regulated battery supplies and performed quality check inspections with AQL upon arrival. Achieved reduction of rejection by 19% using the checklists & poke yoke (checklists review). Analysis of customer rejected part, preparing 8D reports and communicate back to customer. Asisst Quality team in PPAP documentation, pilot test runs, and ISO 9001:2015 compliance to resolve quality issues. Conducted Gemba walks for understanding the work scenario and confirming the smoothness of processes. Balanced process lines by solving bottlenecks, backtracking, and overruns; used Time Study, VSM resulting the increase in production by approximately 20% Part of the CFT in APQP, Preparing and reviewing PFD, PFMEA’s, Process Control Plans & other engineering docs Show less
-
-
-
Verizon Engineering
-
India
-
Machinery Manufacturing
-
Industrial Engineer
-
Jun 2016 - May 2017
Pune, Maharashtra, India Monitored and maintained inventory levels by setting accurate safety stock consistent with company inventory goals using JIT methodology resulting in cost savings by 14% Coordinated between the vendor and the company for timely delivery of material shipments, this substantially reduced the overall lead times by 10% and cost by 20% Facilitated Kaizen events for implementation of 5S methodology to sort and track inventory followed by periodic audits to save 1800 hours of… Show more Monitored and maintained inventory levels by setting accurate safety stock consistent with company inventory goals using JIT methodology resulting in cost savings by 14% Coordinated between the vendor and the company for timely delivery of material shipments, this substantially reduced the overall lead times by 10% and cost by 20% Facilitated Kaizen events for implementation of 5S methodology to sort and track inventory followed by periodic audits to save 1800 hours of process time annually, which improved space utilization by 8% and kept the workplace clean and risk free Evaluated KPI’s using 5Why’s analysis and minimized part rejection to increase productivity by 10% in just 8 weeks Reviewed and analyzed quality metrics to implement appropriate corrective actions with suppliers Show less
-
-
-
BAJA SAEINDIA
-
India
-
Industrial Machinery Manufacturing
-
1 - 100 Employee
-
Manufacturing Engineer
-
May 2016 - Feb 2017
Pune, Maharashtra, India Led a team of 25 people to manufacture an all-terrain vehicle within a span of 1year Used Gantt chart and MS Project to monitor the process planning of vehicle, which resulted in overall time reduction by 8 days Also prepared cost analysis sheet for materials using MS Excel, reducing overall cost by 15% Used CNC machine and deployed G-codes and M-Codes to manufacture subsystem part assemblies Created Kanban vs Kitting vs JIT strategies based on line side space and storage… Show more Led a team of 25 people to manufacture an all-terrain vehicle within a span of 1year Used Gantt chart and MS Project to monitor the process planning of vehicle, which resulted in overall time reduction by 8 days Also prepared cost analysis sheet for materials using MS Excel, reducing overall cost by 15% Used CNC machine and deployed G-codes and M-Codes to manufacture subsystem part assemblies Created Kanban vs Kitting vs JIT strategies based on line side space and storage requirements Developed Job Breakdown Sheet, reducing wastes and WIP(Work In Process) resulting in cost reduction Improved milling process by executing (PDCA) continuous improvement boards & enhanced QMS system. Show less
-
-
Education
-
Illinois Institute of Technology
Industrial Engineering, 3.60/4.00 -
Savitribai Phule Pune University
Mechanical Engineering, 3.80/4.00