Akash Tangade

Project Manager at CRS Group, now an Epitec company
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Chicago, Illinois, United States, US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Staffing and Recruiting
    • 1 - 100 Employee
    • Project Manager
      • Oct 2022 - Present

      Peoria, Illinois, United States

    • United States
    • Food and Beverage Manufacturing
    • 1 - 100 Employee
    • Purchasing
      • Jul 2021 - Oct 2022

      Mundelein, Illinois, United States

    • India
    • Chemical Manufacturing
    • 1 - 100 Employee
    • Supply Chain Buyer/Planner
      • Jun 2017 - Jun 2019

      Pune Area, India  Negotiated price of parts for Maintenance, Repairs, and Operations (MRO) to get the best cost-effective deal after a comprehensive cost analysis resulting in total cost savings of 12.5% per part  Developed MOQ’s(Minimum Order Quantities) and EOQ’s(Economic Order Quantities) saving $25000 in inventory value.  Ordered and regulated battery supplies and performed quality check inspections with AQL upon arrival.  Achieved reduction of rejection by 19% using the checklists & poke… Show more  Negotiated price of parts for Maintenance, Repairs, and Operations (MRO) to get the best cost-effective deal after a comprehensive cost analysis resulting in total cost savings of 12.5% per part  Developed MOQ’s(Minimum Order Quantities) and EOQ’s(Economic Order Quantities) saving $25000 in inventory value.  Ordered and regulated battery supplies and performed quality check inspections with AQL upon arrival.  Achieved reduction of rejection by 19% using the checklists & poke yoke (checklists review). Analysis of customer rejected part, preparing 8D reports and communicate back to customer.  Asisst Quality team in PPAP documentation, pilot test runs, and ISO 9001:2015 compliance to resolve quality issues. Conducted Gemba walks for understanding the work scenario and confirming the smoothness of processes.  Balanced process lines by solving bottlenecks, backtracking, and overruns; used Time Study, VSM resulting the increase in production by approximately 20%  Part of the CFT in APQP, Preparing and reviewing PFD, PFMEA’s, Process Control Plans & other engineering docs Show less

    • India
    • Machinery Manufacturing
    • Industrial Engineer
      • Jun 2016 - May 2017

      Pune, Maharashtra, India  Monitored and maintained inventory levels by setting accurate safety stock consistent with company inventory goals using JIT methodology resulting in cost savings by 14%  Coordinated between the vendor and the company for timely delivery of material shipments, this substantially reduced the overall lead times by 10% and cost by 20%  Facilitated Kaizen events for implementation of 5S methodology to sort and track inventory followed by periodic audits to save 1800 hours of… Show more  Monitored and maintained inventory levels by setting accurate safety stock consistent with company inventory goals using JIT methodology resulting in cost savings by 14%  Coordinated between the vendor and the company for timely delivery of material shipments, this substantially reduced the overall lead times by 10% and cost by 20%  Facilitated Kaizen events for implementation of 5S methodology to sort and track inventory followed by periodic audits to save 1800 hours of process time annually, which improved space utilization by 8% and kept the workplace clean and risk free  Evaluated KPI’s using 5Why’s analysis and minimized part rejection to increase productivity by 10% in just 8 weeks  Reviewed and analyzed quality metrics to implement appropriate corrective actions with suppliers Show less

    • India
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Manufacturing Engineer
      • May 2016 - Feb 2017

      Pune, Maharashtra, India  Led a team of 25 people to manufacture an all-terrain vehicle within a span of 1year  Used Gantt chart and MS Project to monitor the process planning of vehicle, which resulted in overall time reduction by 8 days Also prepared cost analysis sheet for materials using MS Excel, reducing overall cost by 15%  Used CNC machine and deployed G-codes and M-Codes to manufacture subsystem part assemblies  Created Kanban vs Kitting vs JIT strategies based on line side space and storage… Show more  Led a team of 25 people to manufacture an all-terrain vehicle within a span of 1year  Used Gantt chart and MS Project to monitor the process planning of vehicle, which resulted in overall time reduction by 8 days Also prepared cost analysis sheet for materials using MS Excel, reducing overall cost by 15%  Used CNC machine and deployed G-codes and M-Codes to manufacture subsystem part assemblies  Created Kanban vs Kitting vs JIT strategies based on line side space and storage requirements  Developed Job Breakdown Sheet, reducing wastes and WIP(Work In Process) resulting in cost reduction  Improved milling process by executing (PDCA) continuous improvement boards & enhanced QMS system. Show less

Education

  • Illinois Institute of Technology
    Industrial Engineering, 3.60/4.00
    2019 - 2021
  • Savitribai Phule Pune University
    Mechanical Engineering, 3.80/4.00
    2013 - 2017

Community

You need to have a working account to view this content. Click here to join now