construction of 4 laning of NH-5 From Kaithlighat to shakral Village ( Shimla bypass package 1 from km 128:835 km to km 146:300 for design length = 17.465 km) in H.M construction of 4 laning of NH-5 From Kaithlighat to shakral Village ( Shimla bypass package 1 from km 128:835 km to km 146:300 for design length = 17.465 km) in H.M
-
-
-
Trivenimudrai Project Limited
-
Solapur, Maharashtra, India
-
Sr. Highway Engineers
-
May 2022 - Sep 2023
Project Name:- Four laning Of Solapur (km249.000) To Maharshtra –Karnataka Border(KM 348.800) Section of NH-9 (Design length100.06 km) in The State Of Maharshtra On DBFOT BASIS Under NHDP Phase-3 Key Responsibility :- Responsible for overall activities of road works i.e. Embankment, Sub Grade, GSB, WMM,DBM ,BC • Co-ordinate between different divisions like Quality control, survey, Mechanical wing for smooth functioning of the project • Maintain a good communication with client and Authority’s Engineer for smooth functioning of project. • Monitoring & arranging Prior planning and the identification of critical materials essential for the project construction. • the Plant & Machinery as required at site. • Planning &Execution of works. • Certifying the bills against works. • Rate analysis of extra items Project Name:– Six Laning of Krishnagiri – Walajhpet Section of NH-46 from km 0.000 to km 148.300 in the State of Tamil Nadu under NHDP phase V as BOT (Toll) on DBFO pattern. Key Responsibility:- Responsible for overall activities of road works i.e. Embankment, Sub Grade, GSB, WMM,DBM,BC • Co-ordinate between different divisions like Quality control, survey, Mechanical wing for smooth functioning of the project • Maintain a good communication with client and Authority’s Engineer for smooth functioning of project. • Monitoring & arranging Prior planning and the identification of critical materials essential for the project construction. • the Plant & Machinery as required at site. Show less
-
-
-
SHRI S. M. AUTADE PRIVATE LIMITED
-
India
-
Construction
-
1 - 100 Employee
-
Assistant highway engineer
-
Apr 2020 - Apr 2022
Project Name:– 4-Lane of existing 2-Lane stretch from MOHOL at km 0.000 to WAKHRI km 44.700 (pkg-1) on MOHOL-ALANDI section of NH-965 in state of Maharastra on EPC Mode . Key Responsibility •Scheduling site work plan and progress, resources, deployment of man power and earthmoving equipment. • Carrying out all works in accordance with the P&P, design specifications, quality and technical standards. Project Name:– Improvement of Barshi Solapur Akkalkot aland to State Board, SH- 204, Km 1+40 to 63+300 (Barshi- Solapur Road) Distt- Solapur length 61.90 Km EPC-3 . Key Responsibility:- Scheduling site work plan and progress, resources, deployment of man power and earthmoving equipment. • Carrying out all works in accordance with the P&P, design specifications, quality and technical standards. • Cooperation with clients and IE, seeking technical approval of construction • Assisting, coaching, and mentoring junior staff, contractors, and suppliers • Preparation of DPR, RFI, construction record, strip chart, measurement sheet, and monthly work plan. • Superintending of finishing work like curb casting, slope protection, turfing, lane marking, and utility duct Show less
-
-
-
M G Group
-
India
-
Civil Engineering
-
1 - 100 Employee
-
Jr. Highway Engineers
-
Jun 2016 - Mar 2020
Project :- Improvement and Upgradation of Rangamati-Tikar-Hazam-Banta-Silli Road (MDR-025) from Km 8.80 to Km 46.37 (Length- 37.57 Km ) on EPC Key Responsibility:- Preparation of the embankment layer, Sub grade, GSB,WMM. • Supervision of cutting down trees, Clearing and Grubbing Preparation of OGL Taking of Block levels, cutting up to EMB top for given level. Preparation of dumping of Sub grade Material and Preparation of Sub grade top as per given cross fall and levels. project :- Improvement / upgradation and strengthening Udakishanganj–Bhatgama road ( SH-58) Length – 29.480 km. Key Responsibility:- Preparation of the embankment layer, Sub grade, and Granular Sub Base. • OGL recording, and level checking for earthwork cutting and filling, toe line calculations and layer charts preparation. • Execution of site progress status and provide specialist direction on unusual or difficult engineering issues. Show less
-
-