Ajay Haridas

Electrical Engineer - PV & CSP at Shanghai Electric Group Co., Ltd
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
AE
Languages
  • Hindi Full professional proficiency
  • English Full professional proficiency
  • Malayalam Full professional proficiency
  • Arabic Elementary proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

ADEEL A.K

I had the pleasure of working with him as an QC Engineer at LRQA Company. He is also working on same project at Shanghai Electric and is a highly skilled Engineer with a strong attention to detail and a genuine commitment to safety. His technical knowledge, problem-solving skills, and ability to work under pressure enabled him to successfully complete numerous projects efficiently and cost-effectively. He is also a great team player, always willing to lend a hand and help his colleagues out when needed. I would highly recommend Mr. Ajay as an Electrical Engineer to any organization looking for an experienced, reliable and dedicated professional.

Art Murray

Eng. Ajay Haridas is an extremely bright, energetic and versatile individual. He has the rare combination of technical skills in electrical engineering and software, along with a keen understanding of business, including operations, supply chain, finance, customer relations and employee relations. He is a dedicated team player, and is an asset to any organization. I highly recommend him.

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Advance Training in Industrial Automation
    Technocrat Automation
    Sep, 2008
    - Oct, 2024
  • Diploma in Electrical CADD
    Cadd Centre
    Apr, 2007
    - Oct, 2024

Experience

    • Mechanical Or Industrial Engineering
    • 700 & Above Employee
    • Electrical Engineer - PV & CSP
      • Oct 2019 - Present

      Taking care of all the aspects of the project including Project Timeline, Site Management, Material Logistics, Material Inspection, Design review, QA/QC, Testing and Commissioning activities, and HSE. Maintaining a site with 5 subcontractors and 100+ labors, site activities, and HSE related. Total production - 700MW CSP + 250 MW PV + 140 MW PV Auxiliary - Accelerated monthly financial close to ensure timely and accurate financial information and records. - Prepared and maintained daily/weekly reports, and periodic cash forecasts, and managed all 3rd party vendors. - Prepared an annual departmental budget and analyze variance against the budgets. - Provided schedule and financial and management reports weekly or daily. - Managed all Electrical Installations of PV & CSP for 2 projects of approximately 1 billion $ each. - Arrange meetings with the Client, and streamline the bottlenecks involved in the project installations by discussing with the vendor, client, and subcontractor. - Managed the day-to-day operational aspects of the project. - Prepared schedules at all stages of project development and execution as may be required. Accomplishment: Released an NCR amount of 1 million AED from a client within a span of 2 months. Show less

    • Assistant Manager Customer Support
      • May 2018 - Mar 2019

      Supervised 80+ members that supported the Projects & O&M of Inline Baggage Handling System at Cochin International Airport Ltd, Domestic Terminal—managing projects (material, manpower and finance), O&M, procurement of spares, testing, and commissioning activities. - Make sure the installations are done complying with the mechanical and electrical drawings, quality checks on the relevant installations, ORAT testing & preparation of handing over/ taking over documents to be submitted to the client. - Making warranty claims for project Insurance. - Arrangement of manpower on a clock basis for O&M and provide maintenance schedules for PPM, and CM. Accomplishment: Able to make an insurance claim of Rs. 100 million for the project equipment. Show less

    • Kuwait
    • Retail
    • 700 & Above Employee
    • Facilities Electrical Engineer - Projects & Property
      • Jan 2014 - Apr 2018

      Supervised team of 15+ responsible for planning, O&M and production of services to meet the weekly target of 2 million quality and scheduling demands and diagnose and resolve technical problems in a multi-user environment. Warehousing duty involved inventory of spares, making warranty claims, procurement of consumables, arranging manpower for O&M. Managed the materials handling system and MEP facilities of warehouse on round the clock basis.. Gathered appropriate information required to enter information into web-based problem tracking system and liaised with other departments to ensure that requests or problem reports had been satisfactorily handled. Worked directly with other departments to determine and meet production schedules. Show less

    • Logistics Specialist
      • Oct 2012 - Dec 2013

      Perform BOE, Customs clearance / Inspection Services, Storage, and transportation duties; manage the due-in-from- maintenance program, document control program, and mission support kits program. Prepare logistics documentation including Bill of Entry & Exit, Customs Claims, Getting approval from government departments, develop requisitions. Preparation of Invoice. Track logistics materials and review configuration changes. Maintain delivery note. Manage data for storage and occupancy planning reports. Collaborate with customers, quality assurance personnel, buyers, planners, and vendors. Coordinate cost-effective, efficient transportation. Conduct customs inspections, perform warehouse validations, and conduct physical inventories; oversee the inspection, issue, and transfer of property. Show less

    • Netherlands
    • Automation Machinery Manufacturing
    • 700 & Above Employee
    • BHS Engineer
      • May 2009 - Aug 2012

      Supply, Installation, Testing & Commissioning of Inline BHS at Calicut, Chennai, Hyderabad — performing maintenance, modification, increasing the throughput of present system, manage the inventory of material arrival for site installations. Utilized computer hardware/software and manual records to perform stock control and accounting procedures and prepare and review the material arrival for site installations. Analyzed and interpreted technical data, providing direction to team regarding receipt, storage, maintenance, and supply of material for site installations. Make sure the mechanical and electrical installations are done as per the drawing provided, make sure the testing procedures are carried out as per ORAT standards. Show less

  • M/S M.M. ASSOCIATES
    • Calicut Area, India
    • AFL Electrical Engineer
      • Oct 2008 - Apr 2009

      Electrical Engineer and Technical Assistant at Calicut International Airport involved in AFL installation, Tender Preparation, Measurement taking, Surveying, Managing the Installations, Preparation of Shop drawings. Utilized computer hardware/software for prepration of shop drawings, preparation of tender document, bill of quantity preparation, surveying and measurement preparation for verifying the invoices raised by different ontractors. Installation of Cat1 lighting, Isolation transformer, CCR, PAPI, UPS and Stabilizer, Inset lighting according to ICAO standards Well versed with procedures of cable laying, sensor cables and termination procedures. Show less

Education

  • A.W.H Engineering College
    B. Tech, Electrical & Electronics Engineering
    2004 - 2008
  • Sikkim Manipal University
    MBA; Master of Business Administration, Supply Chain Management
    2011 - 2013
  • Blue Ocean Academy
    Certified International Supply Chain Professional (CSCP), Logistics, Materials, and Supply Chain Management
    2013 - 2013
  • The Instituition of Engineers (India)
    AMIE (Ele), Electrical and Electronics Engineering
    2011 - 2012
  • Our Own Indian High School, Dubai, UAE
    SSLC
  • New Indian Model School, Dubai, UAE
    Higher Secondary, Mathematics and Computer Science

Community

You need to have a working account to view this content. Click here to join now