ajay aswale
Purchase Manager & Coordination at MIT ADT University- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English, Hindi, Marathi -
Topline Score
Bio
Experience
-
MIT ADT University
-
India
-
Education Administration Programs
-
300 - 400 Employee
-
Purchase Manager & Coordination
-
Jan 2019 - Present
For upcoming project of IT building designed by Arch Hafeez Contractor, area 6,00,000 Sqft, Plus Staff Quarters & Extension of design building- working as Purchase Manager & coordination - Infrastructure Cell. For upcoming project of IT building designed by Arch Hafeez Contractor, area 6,00,000 Sqft, Plus Staff Quarters & Extension of design building- working as Purchase Manager & coordination - Infrastructure Cell.
-
-
-
Self Employed
-
Nashik
-
Consultant & Contractor
-
Jun 2014 - Dec 2018
Services provided: Estimation, Execution, Planning, , Costing (Business Monitoring) & Coordination (Industrial Commercial & Township Projects) Services provided: Estimation, Execution, Planning, , Costing (Business Monitoring) & Coordination (Industrial Commercial & Township Projects)
-
-
-
Rajdeep Buildcon Pvt Ltd
-
IIM - Indore
-
Project Manger,
-
Jan 2013 - Jun 2014
Expansion of IIM, Indore, Group V project costing Rs. 105 Cr Job Description / Responsibilities 1. Coordination and follow up with Client and Consultant for drawings and payments. 2. Reporting to Head Office regarding Progress Report. 3. Managing Labour Contractors, Agencies as per requirement of site. 4. Follow up with Head Office for requirement of material, resources and payments of Site, Contractors and Vendors. 5. Boosting moral of staff regularly & guiding for positioning & installation of machinery (tower crane, concrete pump), shuttering and stagging/scaffolding design for timely completion of activities. 6. A continuous check on ‘Store Dept’ and ‘Vehicle & Machinery Dept’ 7. Liaison with Government Officers. Show less
-
-
-
Ashoka Buildcon Limited
-
India
-
Construction
-
700 & Above Employee
-
Resident Engineer, (Coordination & Costing)- EPC –BOT Project
-
Jul 2011 - Oct 2012
(a) Coordinate with design department, site, consultant and government official.(b) Final reconciliation of material on completion of ‘Project’.
-
-
Resident Engineer, (Project Incharge)
-
Jul 2009 - Jul 2011
(a) Factory structure of 3 lac sqft. Time period – 18 months.(b) As ‘Project Incharge’ I was responsible for techno commercial operations.(c) Deal with management, consultant and client for drawings and payments.
-
-
Resident Engineer
-
Jul 2007 - Jul 2009
(a) At Chansi, School building was- ground plus three and area 1 lac sqft(b) At Ashoka Marg – Administrative block and School building was ground plus five and area 3 lac sqft.(c) Time period for both was 21 months.
-
-
Assistant Resident Engineer
-
Jul 2004 - Jul 2007
(a) Coordination with three bridge sites for Progress reports & resource availability.(b) Payments against RA bills from government office.(c) Support tendering department.
-
-
Assistant Resident Engineer,
-
Jul 2003 - Jul 2004
(a) Leading, training and motivating the team to recover delay in project.(b) Progress reports, checking of contractors bill and submitting client bill. Coordinate with Architect and Client for Minutes Of Meeting.(c) Reconciliation during completion of project.
-
-
Senior Engineer
-
Jul 2000 - Jul 2003
Head Office(a) Co–ordination along with sites for progress reports and resource availability.(b) ISO documentation of ‘work instructions’ for its first internal Audit.
-
-
Senior Engineer
-
Dec 1998 - Jul 2000
(a) Demolish existing two shop floor structures. (blasting prohibited)(b) Construct new modified two structures at same location.
-
-
Senior Engineer
-
Jul 1998 - Dec 1998
Coordination(a) To collect outstanding payments/ Security deposits from clients.(b) Coordinate with contract department to resolve litigation matters.(c) Records of ‘as built drawings’ of completed projects till ‘defect liability period’.(d) Assist tender department.
-
-
Senior Engineer
-
Jul 1996 - Jul 1998
(a) Mobilisation of Machinery & Staff.(b) Appointing labour contractors, vendors and suppliers.(c) Execution- civil works, fabrication and erecting, roof sheeting, machine foundation, billing, administration etc.
-
-
Jr. Engineer
-
Jul 1995 - Jul 1996
Vadilal(a) RCC Work – Foundation to folded slab.Jindal(a) RCC structures of Machine foundations.(b) Roof and side – coated aluminium sheeting work.Nilkamal(a) Tri mix flooring for dispatch yard.
-
-
-
VIP Industries Ltd.
-
(Nashik)
-
Graduate Trainee Engineer
-
Jul 1994 - Jul 1995
(a) Supervision of work execution. (b) Labor and material consumption report. (b) Checking of measurement sheets of RA Bills. (a) Supervision of work execution. (b) Labor and material consumption report. (b) Checking of measurement sheets of RA Bills.
-
-
Education
-
BE (Civil) Pune University
Engineer’s Degree, BE (Civil)