Aitor Romero Mordillo
Project Engineer for ATS Boeing Loyal Wingman at Ferra Group- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Ferra Group
-
Australia
-
Defense and Space Manufacturing
-
100 - 200 Employee
-
Project Engineer for ATS Boeing Loyal Wingman
-
Jul 2021 - Present
-
-
-
THE CT ENGINEERING GROUP
-
Spain
-
IT Services and IT Consulting
-
700 & Above Employee
-
Kit Supply Chain Industrialization Manager for A330 MRTT
-
Feb 2018 - Mar 2019
Focal Point of delivery aircrafts. Being the main task to assure abiability of the critical parts on time to fulfill the planning: • Management and planning of purchases, supply chain and co-operation with purchase centers. • Priorization of aircrafts demands according to the needs in plant. • Management and estimation of lead times. • Close collaboration with Production, Planning and Production Control departments. Focal Point of delivery aircrafts. Being the main task to assure abiability of the critical parts on time to fulfill the planning: • Management and planning of purchases, supply chain and co-operation with purchase centers. • Priorization of aircrafts demands according to the needs in plant. • Management and estimation of lead times. • Close collaboration with Production, Planning and Production Control departments.
-
-
-
Airbus
-
France
-
Aviation and Aerospace Component Manufacturing
-
700 & Above Employee
-
Quality Department
-
Apr 2017 - Feb 2018
Internship in Quality Production Department (A330 MRTT and A400M DASS UK). Task carried out during this time: • Lean Manufacturing: Maintenance and development of SQCDP department panels and management of Quality KPIs. • NDTs supervisor, ensuring the efficiency of the process. Techniques used: Tap Test, Ultra sounds, Eddy Current, Roto Test or Liquid Penetrant Testing. • Management and improvement of department´s office tools based on Visual Basic programming language. • Operational Surveillance Inspector in FAL ADDC and Iberia Hangars
-
-
-
Airbus
-
France
-
Aviation and Aerospace Component Manufacturing
-
700 & Above Employee
-
Structure Design Department
-
Sep 2016 - Jan 2017
Design of verification parts and development of design rules for ALM (Additive Layer Manufacturing) manufacture processes in the Structure Design Department: • In the project both Polyamide and Aluminum materials were considered in order to investigate their viability in future applications in the aeronautical sector. • The project was divided in two different parts, clasificating the different speciments according to the difficult of its manufacture. • Finally the verification parts were manufactured using SLS (Selective Laser Sintering) technology and studied by CT Scan (Computed Tomography Scan).
-
-
-
Ejército del Aire
-
Spain
-
Defense and Space Manufacturing
-
700 & Above Employee
-
Maestranza Aerea de Albacete
-
Jun 2016 - Sep 2016
Internship in maintenance and certification tasks of F-5, F-18 and Eurofighter in fighter planes engineering section. Internship in maintenance and certification tasks of F-5, F-18 and Eurofighter in fighter planes engineering section.
-
-
Education
-
Universidad de Alcalá
Master in Decision Making and Innovation -
Universidad de Alcalá
Master in Decision Making and Innovation -
Universidad Politécnica de Madrid
Aerospace Degree -
Universidad Politécnica de Madrid
Grado en ingenieria Aeronautica y del Espacio -
Universidad de Alcalá
Master in Decision Making and Innovation -
Universidad de Alcalá
Master in Decision Making and Innovation